메뉴 건너뛰기




Volumn 14, Issue 5, 2006, Pages 614-640

Simulation modeling decision support through belief networks

Author keywords

Belief network; Intelligent agents; Planning; Resource allocation; Simulation modeling

Indexed keywords

COMPUTER SIMULATION; EARTHMOVING MACHINERY; ENCAPSULATION; INFERENCE ENGINES; INTELLIGENT AGENTS; MATHEMATICAL MODELS; NEURAL NETWORKS; OPTIMIZATION; PLANNING; RESOURCE ALLOCATION;

EID: 33744547729     PISSN: 1569190X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.simpat.2005.10.010     Document Type: Article
Times cited : (9)

References (19)
  • 3
    • 0034430622 scopus 로고    scopus 로고
    • R.W. Brennan, O. William, A simulation test bed to evaluate multi-agent control of manufacturing systems, in: Proc. 2000 Winter Simulation Conference, IEEE, New York, 2000, pp. 1747-1756.
  • 7
    • 0028598999 scopus 로고
    • Construction problem solving in a cooperative distributed agent environment
    • Proc. First Congress Held in Conjunction with A/E/C Systems '94, ASCE, New York
    • Jones B., and Riley M. Construction problem solving in a cooperative distributed agent environment. Proc. First Congress Held in Conjunction with A/E/C Systems '94. Computing in Civil Engineering vol. 1 (1994), ASCE, New York 79-87
    • (1994) Computing in Civil Engineering , vol.1 , pp. 79-87
    • Jones, B.1    Riley, M.2
  • 8
    • 0037208750 scopus 로고    scopus 로고
    • Framework for an intelligent earthwork system part I system architecture
    • Kim S.K., and Russel J.S. Framework for an intelligent earthwork system part I system architecture. Automation in Construction 12 (2003) 1-13
    • (2003) Automation in Construction , vol.12 , pp. 1-13
    • Kim, S.K.1    Russel, J.S.2
  • 9
    • 0037208763 scopus 로고    scopus 로고
    • Framework for an intelligent earthwork system part II Task identification/scheduling and resource allocation methodology
    • Kim S.K., and Russel J.S. Framework for an intelligent earthwork system part II Task identification/scheduling and resource allocation methodology. Automation in Construction 12 (2003) 15-27
    • (2003) Automation in Construction , vol.12 , pp. 15-27
    • Kim, S.K.1    Russel, J.S.2
  • 10
    • 33744546605 scopus 로고    scopus 로고
    • B.Y. McCabe, An Automated Modeling Approach for Construction Performance Improvement Using Simulation and Belief Networks, Ph.D. Thesis, Department of Civil and Environmental Engineering, University of Alberta, 1997.
  • 14
    • 0036502830 scopus 로고    scopus 로고
    • Model of production planning and scheduling in a shop floor based on collaboration and competition
    • Shi-ping L., Yun-qing R., Jie Z., and Pei-gen L. Model of production planning and scheduling in a shop floor based on collaboration and competition. Wuhan University Journal of Natural Sciences 7 (2002) 77-81
    • (2002) Wuhan University Journal of Natural Sciences , vol.7 , pp. 77-81
    • Shi-ping, L.1    Yun-qing, R.2    Jie, Z.3    Pei-gen, L.4
  • 17
    • 33744522623 scopus 로고    scopus 로고
    • A.A. Van Tol, Descriptive Simulation Modeling with Resource Allocation Using Belief Networks, M.Sc. Thesis, Department of Civil and Environmental Engineering, University of Alberta, 2000.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.