Factors of non-excusable delays that influence contractors' performance
-
M.Z. Abd.Majid, and R. McCaffer Factor of non-excusable delays that influence contractor's performance J. Manage. Eng. 14 3 1998 42 49 (Pubitemid 128611214)
-
(1998)
Journal of Management in Engineering
, vol.14
, Issue.3
, pp. 42-49
-
-
Abd. Majid, M.Z.1
McCaffer, R.2
-
2
-
-
30844441627
-
Delay mitigation in the Malaysian construction industry
-
DOI 10.1061/(ASCE)0733-9364(2006)132:2(125)
-
H. Abdul-Rahman, M.A. Berawi, A.R. Berawi, O. Mohamed, M. Othman, and I.A. Yahya Delay mitigation in the Malaysian construction industry J. Constr. Eng. Manage. 132 2 2006 125 133 (Pubitemid 43107210)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.2
, pp. 125-133
-
-
Abdul-Rahman, H.1
Berawi, M.A.2
Berawi, A.R.3
Mohamed, O.4
Othman, M.5
Yahya, I.A.6
-
3
-
-
3142750829
-
Representing work spaces generically in construction method models
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(296)
-
B. Akinci, M. Fischer, J. Kunz, and R. Levitt Representing work spaces generically in construction method models J. Constr. Eng. Manage. 128 4 2002 296 305 (Pubitemid 40265534)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 296-305
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
Levitt, R.4
-
5
-
-
84927635730
-
Causes of delay in large building construction project in Saudi Arabia
-
Sadi A. Assaf, M. Al-Khalil, and M. Al-Hazmi Causes of delay in large building construction project in Saudi Arabia J. Manage. Eng. 11 2 1995 45 50
-
(1995)
J. Manage. Eng.
, vol.11
, Issue.2
, pp. 45-50
-
-
Assaf, S.A.1
Al-Khalil, M.2
Al-Hazmi, M.3
-
6
-
-
13944251393
-
Four-dimensional visualization of construction scheduling and site utilization
-
DOI 10.1061/(ASCE)0733-9364(2004)130:4(598)
-
K.W. Chau, M. Anson, and J.P. Zhang Four-dimensional visualization of construction scheduling and site utilization J. Constr. Eng. Manage. 130 4 2004 598 606 (Pubitemid 40265357)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.4
, pp. 598-606
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
8
-
-
24944574152
-
Benefit-cost metrics for design coordination of mechanical, electrical, and plumbing systems in multistory buildings
-
DOI 10.1061/(ASCE)0733-9364(2005)131:8(877)
-
David R. Riley, Priya Varadan, Jennifer S. James, and H. Randolph Thomas Benefit-cost metrics for design coordination of mechanical, electrical, and plumbing systems in multistory buildings J. Constr. Eng. Manage. 131 8 2005 877 889 (Pubitemid 41364750)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.8
, pp. 877-889
-
-
Riley, D.R.1
Varadan, P.2
James, J.S.3
Thomas, H.R.4
-
9
-
-
0035482844
-
Construction coordination activities: What is important and what consumes time
-
DOI 10.1061/(ASCE)0742-597X(2001)17:4(202), Reportnr 22203
-
D. Darshi de Saram, and Syed M. Ahmed Construction coordination activities: what is important and what consumes time J. Manage. Eng. 17 4 2001 202 213 (Pubitemid 33073599)
-
(2001)
Journal of Management in Engineering
, vol.17
, Issue.4
, pp. 202-213
-
-
De Saram, D.D.1
Ahmed, S.M.2
-
10
-
-
2342430993
-
Identification and resolution of work space conflicts in building construction
-
S.J. Guo Identification and resolution of work space conflicts in building construction J. Constr. Eng. Manage. 128 4 2002 287 295
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.4
, pp. 287-295
-
-
Guo, S.J.1
-
11
-
-
0033156961
-
EvoSite: Evolution-based model for site layout planning
-
T. Hegazy, and E. Elbeltagi EvoSite: evolution-based model for site layout planning J. Comput. Civil Eng. 13 3 1999 198 206
-
(1999)
J. Comput. Civil Eng.
, vol.13
, Issue.3
, pp. 198-206
-
-
Hegazy, T.1
Elbeltagi, E.2
-
12
-
-
0032187321
-
Site-Level Facilities Layout Using Genetic Algorithms
-
H. Li, and P.E.D. Love Site-level facilities layout using genetic algorithms J. Comput. Civil Eng. 12 4 1998 227 231 (Pubitemid 128497199)
-
(1998)
Journal of Computing in Civil Engineering
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.E.D.2
-
14
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
W.Y. Thabet, and Y.J. Beliveau Modeling work space to schedule repetitive floors in multistory buildings J. Constr. Eng. Manage. 120 1 1994 96 116
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
15
-
-
0033313625
-
Dynamic layout planning using a hybrid incremental solution method
-
DOI 10.1061/(ASCE)0733-9364(1999)125:6(400)
-
I.D. Tommelein, and P.P. Zouein Dynamic layout planning using a hybrid incremental solution method J. Constr. Eng. Manage. 125 6 1999 400 408 (Pubitemid 30509594)
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 400-408
-
-
Zouein, P.P.1
Tommelein, I.D.2
-
18
-
-
0029344681
-
Construction-site layout using annealed neural network
-
I. Yeh Construction-site layout using annealed neural network J. Comput. Civil Eng. 9 3 1995 201 208
-
(1995)
J. Comput. Civil Eng.
, vol.9
, Issue.3
, pp. 201-208
-
-
Yeh, I.1
|