메뉴 건너뛰기




Volumn 14, Issue 3, 1998, Pages 42-49

Factors of non-excusable delays that influence contractors' performance

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION INDUSTRY; CONTRACTS;

EID: 0032072617     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(asce)0742-597x(1998)14:3(42)     Document Type: Review
Times cited : (110)

References (27)
  • 1
    • 11744303913 scopus 로고
    • MSci dissertation, Dept. of Civ. Engrg., Loughborough Univ. of Technol., Loughborough, U.K.
    • Abd. Majid, M. Z. (1992). "Methods for recovery from non excusable delays," MSci dissertation, Dept. of Civ. Engrg., Loughborough Univ. of Technol., Loughborough, U.K.
    • (1992) Methods for Recovery from Non Excusable Delays
    • Abd. Majid, M.Z.1
  • 3
    • 0006865274 scopus 로고
    • Reasons for delays in public projects in Turkey
    • U.K.
    • Arditi, D., Akan, G. T., and Gurdamar, S. (1985). "Reasons for delays in public projects in Turkey." J. Constr. Mgmt. and Econ., U.K., 3(2), 171-181.
    • (1985) J. Constr. Mgmt. and Econ. , vol.3 , Issue.2 , pp. 171-181
    • Arditi, D.1    Akan, G.T.2    Gurdamar, S.3
  • 4
    • 0024622963 scopus 로고
    • Impact analysis of owner-directed acceleration
    • ASCE
    • Arditi, D., and Patel, B. K. (1989). "Impact analysis of owner-directed acceleration." J. Constr. Engrg. and Mgmt., ASCE, 115(1), 144-157.
    • (1989) J. Constr. Engrg. and Mgmt. , vol.115 , Issue.1 , pp. 144-157
    • Arditi, D.1    Patel, B.K.2
  • 5
    • 84927635730 scopus 로고
    • Causes of delay in large building construction projects
    • ASCE
    • Assaf, S. A., Al-Khalil, M., and Al-Hazmi, M. (1995). "Causes of delay in large building construction projects." J. Mgmt. in Engrg., ASCE, 11(2), 45-50.
    • (1995) J. Mgmt. in Engrg. , vol.11 , Issue.2 , pp. 45-50
    • Assaf, S.A.1    Al-Khalil, M.2    Al-Hazmi, M.3
  • 6
    • 11744301433 scopus 로고
    • Mammoth construction jobs: How to speed them, cut costs?
    • ASCE
    • Building Research Advisory Board of National Academy of Sciences. (1978). "Mammoth construction jobs: How to speed them, cut costs?" Civ. Engrg., ASCE, 84-89.
    • (1978) Civ. Engrg. , pp. 84-89
  • 8
    • 0027873891 scopus 로고
    • Construction cost factors in Nigeria
    • ASCE
    • Elinwa, U., and Buba, S. A. (1993). "Construction cost factors in Nigeria." J. Constr. Engrg. and Mgmt., ASCE, 119(4), 698-713.
    • (1993) J. Constr. Engrg. and Mgmt. , vol.119 , Issue.4 , pp. 698-713
    • Elinwa, U.1    Buba, S.A.2
  • 9
    • 0027962271 scopus 로고
    • Application of the theory of inventive problem solving to the design and manufacturing system
    • Berne, Switzerland
    • Fey, V. R., Rivin, E. I., and Verkin, I. M. (1994). "Application of the theory of inventive problem solving to the design and manufacturing system." Annals of the CIRP, 43(1), Berne, Switzerland, 107-110.
    • (1994) Annals of the CIRP , vol.43 , Issue.1 , pp. 107-110
    • Fey, V.R.1    Rivin, E.I.2    Verkin, I.M.3
  • 11
    • 0027675839 scopus 로고
    • Essential tools of total quality management
    • ASCE
    • Hensey, M. (1993). "Essential tools of total quality management" J. Constr. Engrg. and Mgmt., ASCE, 9(4) 329-339.
    • (1993) J. Constr. Engrg. and Mgmt. , vol.9 , Issue.4 , pp. 329-339
    • Hensey, M.1
  • 13
    • 0021376596 scopus 로고
    • Key elements of construction specification
    • Ibbs, W., Jr. (1984). "Key elements of construction specification." J. Am. Waterworks Assn., 76(2), 48-55.
    • (1984) J. Am. Waterworks Assn. , vol.76 , Issue.2 , pp. 48-55
    • Ibbs Jr., W.1
  • 15
    • 0023594272 scopus 로고
    • Concurrent delays in construction projects
    • ASCE
    • Kraiem, Z. M. (1987). "Concurrent delays in construction projects." J. Constr. Engrg. and Mgmt., ASCE, 113(4), 591-601.
    • (1987) J. Constr. Engrg. and Mgmt. , vol.113 , Issue.4 , pp. 591-601
    • Kraiem, Z.M.1
  • 17
    • 0003493528 scopus 로고
    • Her Majesty's Stationery Office, London, U.K.
    • National Economic Development Office (NEDO). (1970). Large industrial sites. Her Majesty's Stationery Office, London, U.K.
    • (1970) Large Industrial Sites
  • 18
    • 11744289469 scopus 로고
    • Site waste 66% of time
    • London, U.K.
    • National Economic Development Office (NEDO). (1992). "Site waste 66% of time." Contract J., London, U.K.
    • (1992) Contract J.
  • 20
    • 84930124504 scopus 로고
    • Causes of high cost of construction in Nigeria
    • ASCE
    • Okpala, D. C., and Aniekwu, A. N. (1988). "Causes of high cost of construction in Nigeria." J. Constr. Engrg. and Mgmt., ASCE, 114(2), 233-244.
    • (1988) J. Constr. Engrg. and Mgmt. , vol.114 , Issue.2 , pp. 233-244
    • Okpala, D.C.1    Aniekwu, A.N.2
  • 21
    • 0018287340 scopus 로고
    • Delays in construction of nuclear power plants
    • ASCE
    • Rad, P. F. (1979). "Delays in construction of nuclear power plants." J. Energy Div., ASCE, 105(1), 33-46.
    • (1979) J. Energy Div. , vol.105 , Issue.1 , pp. 33-46
    • Rad, P.F.1
  • 22
    • 0025814355 scopus 로고
    • A conceptual model for claim management in construction: An AI approach
    • U.K.
    • Riad, N., Arditi, D., and Mohammadi, J. (1991). "A conceptual model for claim management in construction: An AI approach." J. Computers and Struct., U.K., 40(1), 67-74.
    • (1991) J. Computers and Struct. , vol.40 , Issue.1 , pp. 67-74
    • Riad, N.1    Arditi, D.2    Mohammadi, J.3
  • 23
    • 0021439909 scopus 로고
    • Delay reporting within cost accounting system
    • ASCE
    • Rogge, D. F. (1984). "Delay reporting within cost accounting system." J. Constr. Engrg. and Mgmt., ASCE, 110(2), 289-292.
    • (1984) J. Constr. Engrg. and Mgmt. , vol.110 , Issue.2 , pp. 289-292
    • Rogge, D.F.1
  • 24
    • 0020272970 scopus 로고
    • Foreman-delay surveys: Work sampling and output
    • ASCE
    • Rogge, D. F., and Tucker, R. L. (1982). "Foreman-delay surveys: Work sampling and output." J. Constr. Div., ASCE, 108(4), 592-604.
    • (1982) J. Constr. Div. , vol.108 , Issue.4 , pp. 592-604
    • Rogge, D.F.1    Tucker, R.L.2
  • 25
    • 38249003915 scopus 로고
    • Contractor project risks contingency allocation using linguistic approximation
    • Tah, J. H., Thorpe, A., and McCaffer, R. (1993). "Contractor project risks contingency allocation using linguistic approximation." Computing Sys. in Engrg., 4(2-3), 281-293.
    • (1993) Computing Sys. in Engrg. , vol.4 , Issue.2-3 , pp. 281-293
    • Tah, J.H.1    Thorpe, A.2    McCaffer, R.3
  • 27
    • 0027610716 scopus 로고
    • Construction decision support system for delay analysis
    • ASCE
    • Yates, J. K. (1993). "Construction decision support system for delay analysis." J. Constr. Engrg. and Mgmt., ASCE, 119(2), 226-243.
    • (1993) J. Constr. Engrg. and Mgmt. , vol.119 , Issue.2 , pp. 226-243
    • Yates, J.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.