-
2
-
-
0036350291
-
Controlling costs using design quality workshops
-
AACEI, Washington, D.C.
-
Brown, J. T. (2002). " Controlling costs using design quality workshops.. " 2002 transactions, AACEI, Washington, D.C., CSC.10.1-CSC10.9.
-
(2002)
2002 Transactions
-
-
Brown, J.T.1
-
3
-
-
0032097486
-
Design fee versus design deficiency
-
Bubshait, A. A., Al-Said, F. A., and Abolnour, M. M. (1998). " Design fee versus design deficiency.. " J. Archit. Eng., 4 (2), 44-46.
-
(1998)
J. Archit. Eng.
, vol.4
, Issue.2
, pp. 44-46
-
-
Bubshait, A.A.1
Al-Said, F.A.2
Abolnour, M.M.3
-
4
-
-
0026837054
-
Causes of quality deviations in design and construction
-
Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). " Causes of quality deviations in design and construction.. " J. Constr. Eng. Manage., 118 (1), 34-49.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
5
-
-
23244461270
-
Design fees, the state of the profession, and a time for corrective action
-
Carr, P. G., and Beyor, P. S. (2005). " Design fees, the state of the profession, and a time for corrective action.. " J. Manage. Eng., 21 (3), 110-117.
-
(2005)
J. Manage. Eng.
, vol.21
, Issue.3
, pp. 110-117
-
-
Carr, P.G.1
Beyor, P.S.2
-
7
-
-
0036319174
-
Underestimating costs in public works projects: Error or lie
-
Flyvbjerg, B., Holm, M., and Buhl, S. (2002). " Underestimating costs in public works projects: Error or lie. ?" J. Am. Plan. Assn., 68 (3), 279-295.
-
(2002)
J. Am. Plan. Assn.
, vol.68
, Issue.3
, pp. 279-295
-
-
Flyvbjerg, B.1
Holm, M.2
Buhl, S.3
-
8
-
-
4243231646
-
Construction project performance metrics
-
AACEI, Portland, Ore.
-
Gransberg, D. D., and Villarreal, M. E. (2002). " Construction project performance metrics.. " 2002 transactions, AACEI, Portland, Ore., CSC.02.01-CSC.02.05.
-
(2002)
2002 Transactions
-
-
Gransberg, D.D.1
Villarreal, M.E.2
-
10
-
-
0023978077
-
Improvements in design review management
-
Kirby, J. G., Furry, D. A., and Hiks, D. K. (1988). " Improvements in design review management.. " J. Constr. Eng. Manage., 114 (1), 69-82.
-
(1988)
J. Constr. Eng. Manage.
, vol.114
, Issue.1
, pp. 69-82
-
-
Kirby, J.G.1
Furry, D.A.2
Hiks, D.K.3
-
11
-
-
0032207592
-
Comparison of U.S. project delivery systems
-
Konchar, M., and Sanvido, V. (1998). " Comparison of U.S. project delivery systems.. " J. Constr. Eng. Manage., 124 (6), 435-444.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 435-444
-
-
Konchar, M.1
Sanvido, V.2
-
12
-
-
84993086760
-
Some empirical observations of service quality in construction
-
Love, P. E. D., Smith, J., Treloar, G. J., and Li, H. (2000). " Some empirical observations of service quality in construction.. " Eng., Constr., Archit. Manage., 7 (2), 191-196.
-
(2000)
Eng., Constr., Archit. Manage.
, vol.7
, Issue.2
, pp. 191-196
-
-
Love, P.E.D.1
Smith, J.2
Treloar, G.J.3
Li, H.4
-
13
-
-
0024088979
-
Design productivity: Quality problem
-
McGeorge, J. F. (1988). " Design productivity: Quality problem.. " J. Manage. Eng., 4 (4), 350-362.
-
(1988)
J. Manage. Eng.
, vol.4
, Issue.4
, pp. 350-362
-
-
McGeorge, J.F.1
-
14
-
-
34248555785
-
-
McSkimming, J., Peck, B., Hoy, B., and Carr, S. (2005). " The quality of design documents: What can the cm do? " CMAA forum on quality of design documents, 〈 http://cmaanet.org/user_images/forum. quality_of_design_documents_-_mcskimming.pdf 〉 (Jan. 5, 2007).
-
(2005)
The Quality of Design Documents: What Can the Cm Do?
-
-
McSkimming, J.1
Peck, B.2
Hoy, B.3
Carr, S.4
-
15
-
-
14544291098
-
Programmatic cost risk analysis for highway megaprojects
-
Molenaar, K. R. (2005). " Programmatic cost risk analysis for highway megaprojects.. " J. Constr. Eng. Manage., 131 (3), 343-353.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.3
, pp. 343-353
-
-
Molenaar, K.R.1
-
17
-
-
84860101519
-
-
1999
-
National Society of Professional Engineers (NSPE). (1999). " Qualifications based selection issue paper.. " NSPE issue briefs, 〈 http://www.nspe.org/govrel/gr2%2D4022.asp 〉 (July 9, 1999).
-
(1999)
Qualifications Based Selection Issue Paper
-
-
-
18
-
-
0004285636
-
-
2nd Ed., Prentice-Hall, Englewood Cliffs, N.J.
-
Newbold (1988). Statistics for business and economics, 2nd Ed., Prentice-Hall, Englewood Cliffs, N.J., 462-463.
-
(1988)
Statistics for Business and Economics
, pp. 462-463
-
-
Newbold1
-
19
-
-
2642579411
-
Predicting accuracy of early cost estimates using factor analysis and multivariate regression
-
Trost, S. M., and Oberlender, G. D. (2003). " Predicting accuracy of early cost estimates using factor analysis and multivariate regression.. " J. Constr. Eng. Manage., 129 (2), 198-204.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.2
, pp. 198-204
-
-
Trost, S.M.1
Oberlender, G.D.2
-
20
-
-
34248520330
-
Cost of quality
-
AACEI, Washington, D.C.
-
Venters, V. G. (2004). " Cost of quality.. " 2004 transactions, AACEI, Washington, D.C., EST.04.01-EST.04.07.
-
(2004)
2004 Transactions
-
-
Venters, V.G.1
|