메뉴 건너뛰기




Volumn 133, Issue 6, 2007, Pages 404-408

Relating cost growth from the initial estimate to design fee for transportation projects

Author keywords

Bridge; Bridges, highways; Construction costs; Fees; Highways

Indexed keywords

CONSTRUCTION COSTS; ROADWAY PROJECTS; TRANSPORTATION PROJECTS;

EID: 34248547324     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:6(404)     Document Type: Article
Times cited : (35)

References (20)
  • 2
    • 0036350291 scopus 로고    scopus 로고
    • Controlling costs using design quality workshops
    • AACEI, Washington, D.C.
    • Brown, J. T. (2002). " Controlling costs using design quality workshops.. " 2002 transactions, AACEI, Washington, D.C., CSC.10.1-CSC10.9.
    • (2002) 2002 Transactions
    • Brown, J.T.1
  • 4
    • 0026837054 scopus 로고
    • Causes of quality deviations in design and construction
    • Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). " Causes of quality deviations in design and construction.. " J. Constr. Eng. Manage., 118 (1), 34-49.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.1 , pp. 34-49
    • Burati, J.L.1    Farrington, J.J.2    Ledbetter, W.B.3
  • 5
    • 23244461270 scopus 로고    scopus 로고
    • Design fees, the state of the profession, and a time for corrective action
    • Carr, P. G., and Beyor, P. S. (2005). " Design fees, the state of the profession, and a time for corrective action.. " J. Manage. Eng., 21 (3), 110-117.
    • (2005) J. Manage. Eng. , vol.21 , Issue.3 , pp. 110-117
    • Carr, P.G.1    Beyor, P.S.2
  • 7
    • 0036319174 scopus 로고    scopus 로고
    • Underestimating costs in public works projects: Error or lie
    • Flyvbjerg, B., Holm, M., and Buhl, S. (2002). " Underestimating costs in public works projects: Error or lie. ?" J. Am. Plan. Assn., 68 (3), 279-295.
    • (2002) J. Am. Plan. Assn. , vol.68 , Issue.3 , pp. 279-295
    • Flyvbjerg, B.1    Holm, M.2    Buhl, S.3
  • 8
    • 4243231646 scopus 로고    scopus 로고
    • Construction project performance metrics
    • AACEI, Portland, Ore.
    • Gransberg, D. D., and Villarreal, M. E. (2002). " Construction project performance metrics.. " 2002 transactions, AACEI, Portland, Ore., CSC.02.01-CSC.02.05.
    • (2002) 2002 Transactions
    • Gransberg, D.D.1    Villarreal, M.E.2
  • 10
    • 0023978077 scopus 로고
    • Improvements in design review management
    • Kirby, J. G., Furry, D. A., and Hiks, D. K. (1988). " Improvements in design review management.. " J. Constr. Eng. Manage., 114 (1), 69-82.
    • (1988) J. Constr. Eng. Manage. , vol.114 , Issue.1 , pp. 69-82
    • Kirby, J.G.1    Furry, D.A.2    Hiks, D.K.3
  • 11
    • 0032207592 scopus 로고    scopus 로고
    • Comparison of U.S. project delivery systems
    • Konchar, M., and Sanvido, V. (1998). " Comparison of U.S. project delivery systems.. " J. Constr. Eng. Manage., 124 (6), 435-444.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 435-444
    • Konchar, M.1    Sanvido, V.2
  • 12
    • 84993086760 scopus 로고    scopus 로고
    • Some empirical observations of service quality in construction
    • Love, P. E. D., Smith, J., Treloar, G. J., and Li, H. (2000). " Some empirical observations of service quality in construction.. " Eng., Constr., Archit. Manage., 7 (2), 191-196.
    • (2000) Eng., Constr., Archit. Manage. , vol.7 , Issue.2 , pp. 191-196
    • Love, P.E.D.1    Smith, J.2    Treloar, G.J.3    Li, H.4
  • 13
    • 0024088979 scopus 로고
    • Design productivity: Quality problem
    • McGeorge, J. F. (1988). " Design productivity: Quality problem.. " J. Manage. Eng., 4 (4), 350-362.
    • (1988) J. Manage. Eng. , vol.4 , Issue.4 , pp. 350-362
    • McGeorge, J.F.1
  • 15
    • 14544291098 scopus 로고    scopus 로고
    • Programmatic cost risk analysis for highway megaprojects
    • Molenaar, K. R. (2005). " Programmatic cost risk analysis for highway megaprojects.. " J. Constr. Eng. Manage., 131 (3), 343-353.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.3 , pp. 343-353
    • Molenaar, K.R.1
  • 17
    • 84860101519 scopus 로고    scopus 로고
    • 1999
    • National Society of Professional Engineers (NSPE). (1999). " Qualifications based selection issue paper.. " NSPE issue briefs, 〈 http://www.nspe.org/govrel/gr2%2D4022.asp 〉 (July 9, 1999).
    • (1999) Qualifications Based Selection Issue Paper
  • 18
    • 0004285636 scopus 로고
    • 2nd Ed., Prentice-Hall, Englewood Cliffs, N.J.
    • Newbold (1988). Statistics for business and economics, 2nd Ed., Prentice-Hall, Englewood Cliffs, N.J., 462-463.
    • (1988) Statistics for Business and Economics , pp. 462-463
    • Newbold1
  • 19
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates using factor analysis and multivariate regression
    • Trost, S. M., and Oberlender, G. D. (2003). " Predicting accuracy of early cost estimates using factor analysis and multivariate regression.. " J. Constr. Eng. Manage., 129 (2), 198-204.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.2 , pp. 198-204
    • Trost, S.M.1    Oberlender, G.D.2
  • 20
    • 34248520330 scopus 로고    scopus 로고
    • Cost of quality
    • AACEI, Washington, D.C.
    • Venters, V. G. (2004). " Cost of quality.. " 2004 transactions, AACEI, Washington, D.C., EST.04.01-EST.04.07.
    • (2004) 2004 Transactions
    • Venters, V.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.