-
2
-
-
9544233567
-
Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach
-
Kang C.C., Feng C.M., Haider A.Khan. Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach. Computers and Operations Research 2005, 32(6):1633-1654.
-
(2005)
Computers and Operations Research
, vol.32
, Issue.6
, pp. 1633-1654
-
-
Kang, C.C.1
Feng, C.M.2
Haider, A.3
-
4
-
-
85009578770
-
The royalty models for transport infrastructure BOT projects
-
Chiou Y.C., Lan W.L. The royalty models for transport infrastructure BOT projects. Transpormetrica 2006, 2(3):175-197.
-
(2006)
Transpormetrica
, vol.2
, Issue.3
, pp. 175-197
-
-
Chiou, Y.C.1
Lan, W.L.2
-
5
-
-
80051597111
-
-
Public Construction Commission, Report of Financial Planning of the Private Participation in Infrastructure, Department of Public Construction Commission
-
Public Construction Commission, Report of Financial Planning of the Private Participation in Infrastructure, Department of Public Construction Commission, 2001.
-
(2001)
-
-
-
6
-
-
34247222582
-
Using bargaining-game theory for negotiating concession period for BOT-type contract
-
Shen L.Y., Bao H.J., Lu W.S. Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of Construction Engineering and Management 2007, 133(5):385-392.
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.5
, pp. 385-392
-
-
Shen, L.Y.1
Bao, H.J.2
Lu, W.S.3
-
7
-
-
0035283986
-
A game-theoretical model of private power production
-
Xing W., Wu F.F. A game-theoretical model of private power production. Electric Power and Energy Systems 2001, 23:213-218.
-
(2001)
Electric Power and Energy Systems
, vol.23
, pp. 213-218
-
-
Xing, W.1
Wu, F.F.2
-
8
-
-
0034080942
-
Highway pricing and capacity in a road network under a build-operate-transfer scheme
-
Yang H., Meng Q. Highway pricing and capacity in a road network under a build-operate-transfer scheme. Transportation Research Part A 2000, 34:207-222.
-
(2000)
Transportation Research Part A
, vol.34
, pp. 207-222
-
-
Yang, H.1
Meng, Q.2
-
10
-
-
40649125315
-
-
A new financial engineering model for analyzing the royalty of BOT projects: the Taiwan case. CD-ROMP, in: IEEE International Conference on Industrial Engineering and Engineering Management, Singapore
-
C.C. Kang, C.M. Feng, S.C. Huang, A new financial engineering model for analyzing the royalty of BOT projects: the Taiwan case. CD-ROMP, in: IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2007, pp. 277-281.
-
(2007)
, pp. 277-281
-
-
Kang, C.C.1
Feng, C.M.2
Huang, S.C.3
-
11
-
-
0032695416
-
Private sector participation in infrastructure projects: a methodology to analyze viability of BOT
-
Ranasinghe M. Private sector participation in infrastructure projects: a methodology to analyze viability of BOT. Construction Management and Economics 1999, 17:613-623.
-
(1999)
Construction Management and Economics
, vol.17
, pp. 613-623
-
-
Ranasinghe, M.1
-
13
-
-
0142225970
-
Financial engineering in project management
-
Farrell M. Financial engineering in project management. Project Management Journal 2001, 33(1):27-36.
-
(2001)
Project Management Journal
, vol.33
, Issue.1
, pp. 27-36
-
-
Farrell, M.1
-
14
-
-
0035730325
-
Assessing financial feasibility of build-operate-transfer project under uncertain demand
-
Chen A., Subprasom K., Chootinan P. Assessing financial feasibility of build-operate-transfer project under uncertain demand. Transportation Research Record 2001, 1771:124-131.
-
(2001)
Transportation Research Record
, vol.1771
, pp. 124-131
-
-
Chen, A.1
Subprasom, K.2
Chootinan, P.3
-
15
-
-
62949084274
-
A study of nonlinear negotiation model for build-operate-transfer infrastructure projects: the case of negative utility resource distribution
-
(in Chinese)
-
Lin Y.S., Chang Y.H. A study of nonlinear negotiation model for build-operate-transfer infrastructure projects: the case of negative utility resource distribution. Journal of the Chinese Institute of Transportation 2005, 17(1):27-64. (in Chinese).
-
(2005)
Journal of the Chinese Institute of Transportation
, vol.17
, Issue.1
, pp. 27-64
-
-
Lin, Y.S.1
Chang, Y.H.2
-
16
-
-
0039276320
-
A theory of the bargaining process
-
Cross J.G. A theory of the bargaining process. American Economic Review 1965, 55(1):67-94.
-
(1965)
American Economic Review
, vol.55
, Issue.1
, pp. 67-94
-
-
Cross, J.G.1
-
17
-
-
33847709994
-
Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty
-
Chen A., Subprasom K. Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty. Transportation Research Part A 2007, 41:537-558.
-
(2007)
Transportation Research Part A
, vol.41
, pp. 537-558
-
-
Chen, A.1
Subprasom, K.2
-
21
-
-
0028374414
-
Characterizing an optimal solution to the linear bi-level programming problem
-
Liu Y.H., Stephen M.H. Characterizing an optimal solution to the linear bi-level programming problem. European Journal of Operational Research 1994, 73(1):164-166.
-
(1994)
European Journal of Operational Research
, vol.73
, Issue.1
, pp. 164-166
-
-
Liu, Y.H.1
Stephen, M.H.2
-
23
-
-
80051599769
-
-
Terms of Reference (TOR) of Concessions of the Container Terminal in Taipei Port issued by Keelung Harbor Bureau in 2000, MOTC, Taipei
-
Terms of Reference (TOR) of Concessions of the Container Terminal in Taipei Port issued by Keelung Harbor Bureau in 2000, MOTC, Taipei, 2000.
-
(2000)
-
-
|