메뉴 건너뛰기




Volumn 54, Issue 9-10, 2011, Pages 2338-2347

A royalty negotiation model for BOT (build-operate-transfer) projects: The operational revenue-based model

Author keywords

Bi level programming; BOT project; Negotiation; Royalty

Indexed keywords

BI-LEVEL PROGRAMMING; BOT PROJECT; BUILD , OPERATE AND TRANSFERS; BUILD OPERATE TRANSFERS; CONCESSION CONTRACTS; CONTAINER LOGISTICS; DISCOUNT RATES; ITERATIVE ALGORITHM; LEARNING RATES; MATLAB PROGRAMMING; NEGOTIATION; NEGOTIATION MODELS; NEGOTIATION PROCESS; OBJECTIVE FUNCTION VALUES; OPERATING REVENUES; PRIVATE SECTORS; RECOVERY RATE; ROYALTY; TIME VALUES;

EID: 80051593457     PISSN: 08957177     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.mcm.2011.05.042     Document Type: Article
Times cited : (11)

References (23)
  • 2
    • 9544233567 scopus 로고    scopus 로고
    • Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach
    • Kang C.C., Feng C.M., Haider A.Khan. Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach. Computers and Operations Research 2005, 32(6):1633-1654.
    • (2005) Computers and Operations Research , vol.32 , Issue.6 , pp. 1633-1654
    • Kang, C.C.1    Feng, C.M.2    Haider, A.3
  • 4
    • 85009578770 scopus 로고    scopus 로고
    • The royalty models for transport infrastructure BOT projects
    • Chiou Y.C., Lan W.L. The royalty models for transport infrastructure BOT projects. Transpormetrica 2006, 2(3):175-197.
    • (2006) Transpormetrica , vol.2 , Issue.3 , pp. 175-197
    • Chiou, Y.C.1    Lan, W.L.2
  • 5
    • 80051597111 scopus 로고    scopus 로고
    • Public Construction Commission, Report of Financial Planning of the Private Participation in Infrastructure, Department of Public Construction Commission
    • Public Construction Commission, Report of Financial Planning of the Private Participation in Infrastructure, Department of Public Construction Commission, 2001.
    • (2001)
  • 6
    • 34247222582 scopus 로고    scopus 로고
    • Using bargaining-game theory for negotiating concession period for BOT-type contract
    • Shen L.Y., Bao H.J., Lu W.S. Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of Construction Engineering and Management 2007, 133(5):385-392.
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.5 , pp. 385-392
    • Shen, L.Y.1    Bao, H.J.2    Lu, W.S.3
  • 7
    • 0035283986 scopus 로고    scopus 로고
    • A game-theoretical model of private power production
    • Xing W., Wu F.F. A game-theoretical model of private power production. Electric Power and Energy Systems 2001, 23:213-218.
    • (2001) Electric Power and Energy Systems , vol.23 , pp. 213-218
    • Xing, W.1    Wu, F.F.2
  • 8
    • 0034080942 scopus 로고    scopus 로고
    • Highway pricing and capacity in a road network under a build-operate-transfer scheme
    • Yang H., Meng Q. Highway pricing and capacity in a road network under a build-operate-transfer scheme. Transportation Research Part A 2000, 34:207-222.
    • (2000) Transportation Research Part A , vol.34 , pp. 207-222
    • Yang, H.1    Meng, Q.2
  • 10
    • 40649125315 scopus 로고    scopus 로고
    • A new financial engineering model for analyzing the royalty of BOT projects: the Taiwan case. CD-ROMP, in: IEEE International Conference on Industrial Engineering and Engineering Management, Singapore
    • C.C. Kang, C.M. Feng, S.C. Huang, A new financial engineering model for analyzing the royalty of BOT projects: the Taiwan case. CD-ROMP, in: IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2007, pp. 277-281.
    • (2007) , pp. 277-281
    • Kang, C.C.1    Feng, C.M.2    Huang, S.C.3
  • 11
    • 0032695416 scopus 로고    scopus 로고
    • Private sector participation in infrastructure projects: a methodology to analyze viability of BOT
    • Ranasinghe M. Private sector participation in infrastructure projects: a methodology to analyze viability of BOT. Construction Management and Economics 1999, 17:613-623.
    • (1999) Construction Management and Economics , vol.17 , pp. 613-623
    • Ranasinghe, M.1
  • 13
    • 0142225970 scopus 로고    scopus 로고
    • Financial engineering in project management
    • Farrell M. Financial engineering in project management. Project Management Journal 2001, 33(1):27-36.
    • (2001) Project Management Journal , vol.33 , Issue.1 , pp. 27-36
    • Farrell, M.1
  • 14
    • 0035730325 scopus 로고    scopus 로고
    • Assessing financial feasibility of build-operate-transfer project under uncertain demand
    • Chen A., Subprasom K., Chootinan P. Assessing financial feasibility of build-operate-transfer project under uncertain demand. Transportation Research Record 2001, 1771:124-131.
    • (2001) Transportation Research Record , vol.1771 , pp. 124-131
    • Chen, A.1    Subprasom, K.2    Chootinan, P.3
  • 15
    • 62949084274 scopus 로고    scopus 로고
    • A study of nonlinear negotiation model for build-operate-transfer infrastructure projects: the case of negative utility resource distribution
    • (in Chinese)
    • Lin Y.S., Chang Y.H. A study of nonlinear negotiation model for build-operate-transfer infrastructure projects: the case of negative utility resource distribution. Journal of the Chinese Institute of Transportation 2005, 17(1):27-64. (in Chinese).
    • (2005) Journal of the Chinese Institute of Transportation , vol.17 , Issue.1 , pp. 27-64
    • Lin, Y.S.1    Chang, Y.H.2
  • 16
    • 0039276320 scopus 로고
    • A theory of the bargaining process
    • Cross J.G. A theory of the bargaining process. American Economic Review 1965, 55(1):67-94.
    • (1965) American Economic Review , vol.55 , Issue.1 , pp. 67-94
    • Cross, J.G.1
  • 17
    • 33847709994 scopus 로고    scopus 로고
    • Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty
    • Chen A., Subprasom K. Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty. Transportation Research Part A 2007, 41:537-558.
    • (2007) Transportation Research Part A , vol.41 , pp. 537-558
    • Chen, A.1    Subprasom, K.2
  • 21
    • 0028374414 scopus 로고
    • Characterizing an optimal solution to the linear bi-level programming problem
    • Liu Y.H., Stephen M.H. Characterizing an optimal solution to the linear bi-level programming problem. European Journal of Operational Research 1994, 73(1):164-166.
    • (1994) European Journal of Operational Research , vol.73 , Issue.1 , pp. 164-166
    • Liu, Y.H.1    Stephen, M.H.2
  • 22
    • 37449000904 scopus 로고    scopus 로고
    • A new approach for solving linear bi-level problems using genetic algorithm
    • Calvete H.I., Gale C., Mateo P.M. A new approach for solving linear bi-level problems using genetic algorithm. European Journal of Operation Research 2008, 188:14-28.
    • (2008) European Journal of Operation Research , vol.188 , pp. 14-28
    • Calvete, H.I.1    Gale, C.2    Mateo, P.M.3
  • 23
    • 80051599769 scopus 로고    scopus 로고
    • Terms of Reference (TOR) of Concessions of the Container Terminal in Taipei Port issued by Keelung Harbor Bureau in 2000, MOTC, Taipei
    • Terms of Reference (TOR) of Concessions of the Container Terminal in Taipei Port issued by Keelung Harbor Bureau in 2000, MOTC, Taipei, 2000.
    • (2000)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.