-
1
-
-
0035709976
-
Evaluation of transportation infrastructure projects beyond cost-benefit analysis: An application to Barcelona’s 4th Ring Road
-
Asensio, J. and Roca, O. (2001) Evaluation of transportation infrastructure projects beyond cost-benefit analysis: an application to Barcelona’s 4th Ring Road. International Journal of Transport Economics, 28, 387-402.
-
(2001)
International Journal of Transport Economics
, vol.28
, pp. 387-402
-
-
Asensio, J.1
Roca, O.2
-
2
-
-
0032382195
-
Risk sharing in licensing
-
Bousquet, A., Cremer, H., Ivaldi, M. and Wolkowica, M. (1998) Risk sharing in licensing. International Journal of Industrial Organization, 16, 535-554.
-
(1998)
International Journal of Industrial Organization
, vol.16
, pp. 535-554
-
-
Bousquet, A.1
Cremer, H.2
Ivaldi, M.3
Wolkowica, M.4
-
3
-
-
0001514927
-
The fuzzy mathematics of finance
-
Buckley, J.J. (1987) The fuzzy mathematics of finance. Fuzzy Sets and Systems, 21, 257-273.
-
(1987)
Fuzzy Sets and Systems
, vol.21
, pp. 257-273
-
-
Buckley, J.J.1
-
4
-
-
0004696256
-
Joint solution to fuzzy programming problems
-
Buckley, J.J. (1995) Joint solution to fuzzy programming problems. Fuzzy Sets and Systems, 72, 215-220.
-
(1995)
Fuzzy Sets and Systems
, vol.72
, pp. 215-220
-
-
Buckley, J.J.1
-
5
-
-
0001788426
-
Evolutionary algorithm solution to fuzzy problems: Fuzzy linear programming
-
Buckley, J.J. and Feuring, T. (2000) Evolutionary algorithm solution to fuzzy problems: fuzzy linear programming. Fuzzy Sets and Systems, 109, 35-53.
-
(2000)
Fuzzy Sets and Systems
, vol.109
, pp. 35-53
-
-
Buckley, J.J.1
Feuring, T.2
-
7
-
-
85009584173
-
Financial sustainability for transport infrastructure BOT projects: Royalty models. Proceedings of the 9th HKSTS Post-Conference Workshop on Sustainable Urban Transportation: Concepts, Theories and Methodology, December 13
-
Chiou, Y.C. and Lan, L.W. (2004), Financial sustainability for transport infrastructure BOT projects: royalty models. Proceedings of the 9th HKSTS Post-Conference Workshop on Sustainable Urban Transportation: Concepts, Theories and Methodology, December 13, The University of Hong Kong, pp. 15-34.
-
(2004)
The University of Hong Kong
, pp. 15-34
-
-
Chiou, Y.C.1
Lan, L.W.2
-
8
-
-
0028500315
-
Fuzzy cash flow analysis using present worth criterion
-
Chui, C. and Park, C.S. (1994) Fuzzy cash flow analysis using present worth criterion. The Engineering Economist, 39, 113-138.
-
(1994)
The Engineering Economist
, vol.39
, pp. 113-138
-
-
Chui, C.1
Park, C.S.2
-
9
-
-
0036123777
-
Benefit-cost analysis of airport infrastructure: The case of taxiways
-
Daniel, J.I. (2002) Benefit-cost analysis of airport infrastructure: the case of taxiways. Journal of Air Transportation Management, 8, 149-164.
-
(2002)
Journal of Air Transportation Management
, vol.8
, pp. 149-164
-
-
Daniel, J.I.1
-
10
-
-
16344361939
-
Cost-benefit analysis, benefit account and fuzzy decisions
-
Dompere, K.K. (1997) Cost-benefit analysis, benefit account and fuzzy decisions. Fuzzy Sets and Systems, 92, 275-287.
-
(1997)
Fuzzy Sets and Systems
, vol.92
, pp. 275-287
-
-
Dompere, K.K.1
-
11
-
-
0007072404
-
Solving fuzzy inequalities with concave membership functions
-
Hu, C.F. and Fang, S.C. (1998) Solving fuzzy inequalities with concave membership functions. Fuzzy Sets and Systems, 99, 233-240.
-
(1998)
Fuzzy Sets and Systems
, vol.99
, pp. 233-240
-
-
Hu, C.F.1
Fang, S.C.2
-
12
-
-
0001862777
-
Possibilistic linear programming: A brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem
-
Inuiguchi, M. and Ramik, J. (2000) Possibilistic linear programming: a brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem. Fuzzy Sets and Systems, 111, 3-28.
-
(2000)
Fuzzy Sets and Systems
, vol.111
, pp. 3-28
-
-
Inuiguchi, M.1
Ramik, J.2
-
14
-
-
85009628459
-
The IRR, NPV and payback period and their relative performance in common capital budgeting decision procedures for dealing with risk
-
Lohmann, J.R. and Baksh, S.N. (1996) The IRR, NPV and payback period and their relative performance in common capital budgeting decision procedures for dealing with risk. The Engineering Economist, 42, 1-31.
-
(1996)
The Engineering Economist
, vol.42
, pp. 1-31
-
-
Lohmann, J.R.1
Baksh, S.N.2
-
15
-
-
0004675440
-
User oriented ranking criteria and its application to fuzzy mathematical programming problems
-
Nakahara, Y. (1998) User oriented ranking criteria and its application to fuzzy mathematical programming problems. Fuzzy Sets and Systems, 94, 275-286.
-
(1998)
Fuzzy Sets and Systems
, vol.94
, pp. 275-286
-
-
Nakahara, Y.1
-
17
-
-
0344339142
-
Solving the multiobjective possibilistic linear programming problem
-
Parra, M.A., Terol, A.B. and Rodriguez, U.M.V. (1999) Solving the multiobjective possibilistic linear programming problem. European Journal of Operational Research, 117, 175-182.
-
(1999)
European Journal of Operational Research
, vol.117
, pp. 175-182
-
-
Parra, M.A.1
Terol, A.B.2
Rodriguez, U.M.V.3
-
18
-
-
0002298005
-
Fuzzy mathematical programming based on some new inequality relations
-
Ramik, J. and Rommelfanger, H. (1996) Fuzzy mathematical programming based on some new inequality relations. Fuzzy Sets and Systems, 81, 77-87.
-
(1996)
Fuzzy Sets and Systems
, vol.81
, pp. 77-87
-
-
Ramik, J.1
Rommelfanger, H.2
-
20
-
-
0037117663
-
Interactive fuzzy programming for two-level nonconvex programming problems with fuzzy parameters through genetic algorithms
-
Sakawa, M. and Nishizaki, I. (2002) Interactive fuzzy programming for two-level nonconvex programming problems with fuzzy parameters through genetic algorithms. Fuzzy Sets and Systems, 127, 185-197.
-
(2002)
Fuzzy Sets and Systems
, vol.127
, pp. 185-197
-
-
Sakawa, M.1
Nishizaki, I.2
-
23
-
-
85009563417
-
-
Fuzzy and Neural Approaches in Engineering, John Wiley & Sons Inc., New York
-
Tsoukalas, L.H. and Uhrig, R.E. (1997) Fuzzy and Neural Approaches in Engineering. John Wiley & Sons Inc., New York.
-
(1997)
-
-
Tsoukalas, L.H.1
Uhrig, R.E.2
-
24
-
-
0029318695
-
Benefit/cost analysis using fuzzy concept
-
Wang, M.J. and Liang, G.S. (1995) Benefit/cost analysis using fuzzy concept. The Engineering Economist, 40, 359-376.
-
(1995)
The Engineering Economist
, vol.40
, pp. 359-376
-
-
Wang, M.J.1
Liang, G.S.2
|