메뉴 건너뛰기




Volumn 33, Issue 3-4, 2011, Pages 435-455

A fuzzy Petri net-based reasoning method for rescheduling

Author keywords

Fuzzy reasoning; Petri net; Rescheduling; Semiconductor manufacturing

Indexed keywords

DECISION MAKING; FUZZY SYSTEMS; PETRI NETS; SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 79960262631     PISSN: 01423312     EISSN: None     Source Type: Journal    
DOI: 10.1177/0142331208100100     Document Type: Article
Times cited : (22)

References (26)
  • 3
    • 0036681717 scopus 로고    scopus 로고
    • Expert systems in production planning and scheduling: A state-of-the-art survey
    • DOI 10.1023/A:1016064126976
    • Askounis, D., Psarras, J. and Metaxiotis, K.S. 2002: Expert systems in production planning and scheduling: a state-of-the-art survey. Journal of Intelligent Manufacturing 13, 253-60. (Pubitemid 34830273)
    • (2002) Journal of Intelligent Manufacturing , vol.13 , Issue.4 , pp. 253-260
    • Metaxiotis, K.S.1    Askounis, D.2    Psarras, J.3
  • 4
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates, and disruptions
    • Bean, J.C., Birge, J.R., Mittenthal, J. and Noon, C.E. 1991: Matchup scheduling with multiple resources, release dates, and disruptions. Operations Research 39, 470-83.
    • (1991) Operations Research , vol.39 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 5
    • 0033093715 scopus 로고    scopus 로고
    • Production scheduling and rescheduling with genetic algorithms
    • Bierwirth, C. and Dirk, CM. 1999: Production scheduling and rescheduling with genetic algorithms. Evolutionary Computation 7, 1-17.
    • (1999) Evolutionary Computation , vol.7 , pp. 1-17
    • Bierwirth, C.1    Dirk, C.M.2
  • 6
    • 33947696136 scopus 로고    scopus 로고
    • A genetic algorithm for dynamic advanced planning and scheduling (DAPS) with a frozen interval
    • DOI 10.1016/j.eswa.2006.08.025, PII S0957417406002399
    • Chen, K.J. and Ji, P. 2007: A genetic algorithm for dynamic advanced planning and scheduling (DAPS) with a frozen interval. Expert Systems with Applications 33, 1004-10. (Pubitemid 46497772)
    • (2007) Expert Systems with Applications , vol.33 , Issue.4 , pp. 1004-1010
    • Chen, K.J.1    Ji, P.2
  • 9
    • 4844227632 scopus 로고    scopus 로고
    • Intelligent decision making in disassembly process based on fuzzy feasoning Petri nets
    • Gao, M., Zhou, M. and Tang, Y. 2004: Intelligent decision making in disassembly process based on fuzzy feasoning Petri nets. IEEE Transactions on Systems, Man, and Cybernetics Part B 34, 2029-34.
    • (2004) IEEE Transactions on Systems, Man, and Cybernetics Part B , vol.34 , pp. 2029-2034
    • Gao, M.1    Zhou, M.2    Tang, Y.3
  • 11
    • 1842421851 scopus 로고    scopus 로고
    • Fuzzy Petri net based formalized reasoning algorithm with applications
    • Jia, L.X., Xue, J.Y. and Ru, F. 2003: Fuzzy Petri net based formalized reasoning algorithm with applications. Journal of Xi'an Jiaotong University 37, 1263-66.
    • (2003) Journal of xi'An Jiaotong University , vol.37 , pp. 1263-1266
    • Jia, L.X.1    Xue, J.Y.2    Ru, F.3
  • 12
    • 18544389690 scopus 로고    scopus 로고
    • Supervised learning on a fuzzy Petri net
    • DOI 10.1016/j.ins.2004.05.008, PII S0020025504001768
    • Konar, A., Chakraborty, U.K. and Wang, P.P. 2005: Supervised learning on a fuzzy Petri net. Information Sciences 172, 397-416. (Pubitemid 40654870)
    • (2005) Information Sciences , vol.172 , Issue.3-4 , pp. 397-416
    • Konar, A.1    Chakraborty, U.K.2    Wang, P.P.3
  • 14
    • 0034300620 scopus 로고    scopus 로고
    • Adaptive fuzzy Petri nets for dynamic knowledge representation and inference
    • Li, X. and Lara-Rosano, F. 2000: Adaptive fuzzy Petri nets for dynamic knowledge representation and inference. Expert Systems with Applications 19, 235-41.
    • (2000) Expert Systems with Applications , vol.19 , pp. 235-241
    • Li, X.1    Lara-Rosano, F.2
  • 15
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • PII S1042296X98029176
    • Mehta, S.V. and Uzsoy, R.M. 1998: Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation 14, 365-78. (Pubitemid 128752007)
    • (1998) IEEE Transactions on Robotics and Automation , vol.14 , Issue.3 , pp. 365-378
    • Mehta, S.V.1    Uzsoy, R.M.2
  • 18
    • 33744966565 scopus 로고    scopus 로고
    • Disruption management for machine scheduling: The case of SPT schedules
    • DOI 10.1016/j.ijpe.2005.05.021, PII S0925527305002136
    • Qi, X.T., Bard, J.F. and Yu, G. 2006: Disruption management for machine scheduling: the case of SPT schedules. International Journal Production Economics 103, 166-84. (Pubitemid 43866474)
    • (2006) International Journal of Production Economics , vol.103 , Issue.1 , pp. 166-184
    • Qi, X.1    Bard, J.F.2    Yu, G.3
  • 20
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation research
    • Ramasesh, R. 1990: Dynamic job shop scheduling: a survey of simulation research. Omega 18, 43-57.
    • (1990) Omega , vol.18 , pp. 43-57
    • Ramasesh, R.1
  • 22
    • 34548502241 scopus 로고    scopus 로고
    • A new when-to-schedule policy in online scheduling based on cumulative task delays
    • DOI 10.1016/j.ijpe.2007.02.015, PII S0925527307000904, Recent Developments in Operations Strategy, Supply Chain Design and Production Systems
    • Suwa, H. 2007: A new when-to-schedule policy in online scheduling based on cumulative task delays. International Journal Production Economics 110, 175-86. (Pubitemid 47380292)
    • (2007) International Journal of Production Economics , vol.110 , Issue.1-2 , pp. 175-186
    • Suwa, H.1
  • 23
    • 0034690558 scopus 로고    scopus 로고
    • Analytical models to predict the performance of a single-machine system under periodic and event-driven rescheduling strategies
    • DOI 10.1080/002075400188654
    • Vieira, G.E., Herrmann, J.W. and Lin, E. 2000a: Analytical models to predict the performance of a single-machine system under periodic and event-driven rescheduling strategies. International Journal of Production Research 38, 1899-915. (Pubitemid 35395497)
    • (2000) International Journal of Production Research , vol.38 , Issue.8 , pp. 1899-1915
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 24
    • 0040518040 scopus 로고    scopus 로고
    • Predicting the performance of rescheduling strategies for parallel machine systems
    • Vieira, G.E., Herrmann, J.W. and Lin, E. 2000b: Predicting the performance of rescheduling strategies for parallel machine systems. Journal of Manufacturing Systems 19, 256-66.
    • (2000) Journal of Manufacturing Systems , vol.19 , pp. 256-266
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 25
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • Vieira, G.E., Herrmann, J.W. and Lin, E. 2003: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. Journal of Scheduling 6, 39-62.
    • (2003) Journal of Scheduling , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 26
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    • Wu, S.D., Byeon, E.-S. and Storer, R.H. 1999: A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness. Operations Research 47, 113-24. (Pubitemid 129700862)
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 113-124
    • Wu, S.D.1    Byeon, E.-S.2    Storer, R.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.