-
1
-
-
0000229534
-
Matchup scheduling with multiple resources, release dates and disruptions
-
Bean J.C., Birge J.R., Mittenthal J., and Noon C.E. Matchup scheduling with multiple resources, release dates and disruptions. Operations Research 39 3 (1991) 470-483
-
(1991)
Operations Research
, vol.39
, Issue.3
, pp. 470-483
-
-
Bean, J.C.1
Birge, J.R.2
Mittenthal, J.3
Noon, C.E.4
-
2
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Bean J.C. Genetic algorithms and random keys for sequencing and optimization. ORSA Journal on Computing 6 2 (1994) 154-160
-
(1994)
ORSA Journal on Computing
, vol.6
, Issue.2
, pp. 154-160
-
-
Bean, J.C.1
-
3
-
-
0033093715
-
Production scheduling and rescheduling with genetic algorithms
-
Bierwirth C., and Mattfeld D.C. Production scheduling and rescheduling with genetic algorithms. Evolutionary Computation 7 1 (1999) 1-17
-
(1999)
Evolutionary Computation
, vol.7
, Issue.1
, pp. 1-17
-
-
Bierwirth, C.1
Mattfeld, D.C.2
-
5
-
-
32444438365
-
-
Chen, K. J., & Ji, P. (2004). A mixed integer programming model for integrating MRP and job shop scheduling. In Proceedings of the fourth international conference on e-engineering and digital enterprise technology, Leeds, UK (pp. 145-150).
-
-
-
-
6
-
-
0030242695
-
A tutorial survey of job-shop scheduling problems using genetic algorithms - I: Representation
-
Cheng R.W., Gen M., and Tsujimura Y. A tutorial survey of job-shop scheduling problems using genetic algorithms - I: Representation. Computers and Industrial Engineering 30 4 (1996) 983-997
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 983-997
-
-
Cheng, R.W.1
Gen, M.2
Tsujimura, Y.3
-
7
-
-
0032599591
-
A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: Hybrid genetic search strategies
-
Cheng R.W., Gen M., and Tsujimura Y. A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: Hybrid genetic search strategies. Computers and Industrial Engineering 37 1-2 (1999) 51-55
-
(1999)
Computers and Industrial Engineering
, vol.37
, Issue.1-2
, pp. 51-55
-
-
Cheng, R.W.1
Gen, M.2
Tsujimura, Y.3
-
9
-
-
0030688633
-
A genetic algorithm for the multiple-choice integer program
-
Hadj-Alouane A.B., and Bean J.C. A genetic algorithm for the multiple-choice integer program. Operations Research 45 1 (1997) 92-101
-
(1997)
Operations Research
, vol.45
, Issue.1
, pp. 92-101
-
-
Hadj-Alouane, A.B.1
Bean, J.C.2
-
10
-
-
19744366708
-
Rescheduling for new orders
-
Hall N.G., and Potts C.N. Rescheduling for new orders. Operations Research 52 3 (2004) 440-453
-
(2004)
Operations Research
, vol.52
, Issue.3
, pp. 440-453
-
-
Hall, N.G.1
Potts, C.N.2
-
11
-
-
0030244109
-
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
-
Kim J.U., and Kim Y.D. Simulated annealing and genetic algorithms for scheduling products with multi-level product structure. Computers and Operations Research 23 9 (1996) 857-868
-
(1996)
Computers and Operations Research
, vol.23
, Issue.9
, pp. 857-868
-
-
Kim, J.U.1
Kim, Y.D.2
-
12
-
-
0036642595
-
Advanced planning and scheduling with outsourcing in manufacturing supply chain
-
Lee Y.H., Jeong C.S., and Moon C. Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering 43 1-2 (2002) 351-374
-
(2002)
Computers and Industrial Engineering
, vol.43
, Issue.1-2
, pp. 351-374
-
-
Lee, Y.H.1
Jeong, C.S.2
Moon, C.3
-
13
-
-
0028401193
-
The effects of environmental factors on the design of master production scheduling systems
-
Lin N.P., Krajewski L., Leong G.K., and Benton W.C. The effects of environmental factors on the design of master production scheduling systems. Journal of Operations Management 11 4 (1994) 367-384
-
(1994)
Journal of Operations Management
, vol.11
, Issue.4
, pp. 367-384
-
-
Lin, N.P.1
Krajewski, L.2
Leong, G.K.3
Benton, W.C.4
-
14
-
-
3142777327
-
Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
-
Moon C., Kim J.S., and Gen M. Advanced planning and scheduling based on precedence and resource constraints for e-plant chains. International Journal of Production Research 42 15 (2004) 2941-2954
-
(2004)
International Journal of Production Research
, vol.42
, Issue.15
, pp. 2941-2954
-
-
Moon, C.1
Kim, J.S.2
Gen, M.3
-
15
-
-
0001027563
-
A computational study on design and performance issues of multi-agent intelligent systems for dynamic scheduling environments
-
Pendharkar P.C. A computational study on design and performance issues of multi-agent intelligent systems for dynamic scheduling environments. Expert Systems with Applications 16 2 (1999) 121-133
-
(1999)
Expert Systems with Applications
, vol.16
, Issue.2
, pp. 121-133
-
-
Pendharkar, P.C.1
-
17
-
-
0034326104
-
Analysis of reactive scheduling problems in a job shop environment
-
Sabuncuoglu I., and Bayiz M. Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research 126 3 (2000) 567-586
-
(2000)
European Journal of Operational Research
, vol.126
, Issue.3
, pp. 567-586
-
-
Sabuncuoglu, I.1
Bayiz, M.2
-
18
-
-
0344320671
-
A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources
-
Sun J., and Xue D. A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources. Computers in Industry 46 2 (2001) 189-207
-
(2001)
Computers in Industry
, vol.46
, Issue.2
, pp. 189-207
-
-
Sun, J.1
Xue, D.2
-
20
-
-
0242703954
-
Rescheduling manufacturing systems: A framework of strategies, policies, and methods
-
Vieira G.E., Herrmann J.W., and Lin E. Rescheduling manufacturing systems: A framework of strategies, policies, and methods. Journal of Scheduling 6 1 (2003) 39-62
-
(2003)
Journal of Scheduling
, vol.6
, Issue.1
, pp. 39-62
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
21
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
Wu S.D., Storer R.H., and Chang P.C. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research 20 1 (1993) 1-14
-
(1993)
Computers and Operations Research
, vol.20
, Issue.1
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.C.3
|