메뉴 건너뛰기




Volumn 33, Issue 4, 2007, Pages 1004-1010

A genetic algorithm for dynamic advanced planning and scheduling (DAPS) with a frozen interval

Author keywords

Dynamic advanced planning and scheduling; Frozen interval; Genetic algorithm

Indexed keywords

EXPERT SYSTEMS; GENETIC ALGORITHMS; STABILITY CRITERIA; STRATEGIC PLANNING;

EID: 33947696136     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2006.08.025     Document Type: Article
Times cited : (44)

References (21)
  • 1
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates and disruptions
    • Bean J.C., Birge J.R., Mittenthal J., and Noon C.E. Matchup scheduling with multiple resources, release dates and disruptions. Operations Research 39 3 (1991) 470-483
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 2
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • Bean J.C. Genetic algorithms and random keys for sequencing and optimization. ORSA Journal on Computing 6 2 (1994) 154-160
    • (1994) ORSA Journal on Computing , vol.6 , Issue.2 , pp. 154-160
    • Bean, J.C.1
  • 3
    • 0033093715 scopus 로고    scopus 로고
    • Production scheduling and rescheduling with genetic algorithms
    • Bierwirth C., and Mattfeld D.C. Production scheduling and rescheduling with genetic algorithms. Evolutionary Computation 7 1 (1999) 1-17
    • (1999) Evolutionary Computation , vol.7 , Issue.1 , pp. 1-17
    • Bierwirth, C.1    Mattfeld, D.C.2
  • 5
    • 32444438365 scopus 로고    scopus 로고
    • Chen, K. J., & Ji, P. (2004). A mixed integer programming model for integrating MRP and job shop scheduling. In Proceedings of the fourth international conference on e-engineering and digital enterprise technology, Leeds, UK (pp. 145-150).
  • 6
    • 0030242695 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using genetic algorithms - I: Representation
    • Cheng R.W., Gen M., and Tsujimura Y. A tutorial survey of job-shop scheduling problems using genetic algorithms - I: Representation. Computers and Industrial Engineering 30 4 (1996) 983-997
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 983-997
    • Cheng, R.W.1    Gen, M.2    Tsujimura, Y.3
  • 7
    • 0032599591 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: Hybrid genetic search strategies
    • Cheng R.W., Gen M., and Tsujimura Y. A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: Hybrid genetic search strategies. Computers and Industrial Engineering 37 1-2 (1999) 51-55
    • (1999) Computers and Industrial Engineering , vol.37 , Issue.1-2 , pp. 51-55
    • Cheng, R.W.1    Gen, M.2    Tsujimura, Y.3
  • 9
    • 0030688633 scopus 로고    scopus 로고
    • A genetic algorithm for the multiple-choice integer program
    • Hadj-Alouane A.B., and Bean J.C. A genetic algorithm for the multiple-choice integer program. Operations Research 45 1 (1997) 92-101
    • (1997) Operations Research , vol.45 , Issue.1 , pp. 92-101
    • Hadj-Alouane, A.B.1    Bean, J.C.2
  • 10
    • 19744366708 scopus 로고    scopus 로고
    • Rescheduling for new orders
    • Hall N.G., and Potts C.N. Rescheduling for new orders. Operations Research 52 3 (2004) 440-453
    • (2004) Operations Research , vol.52 , Issue.3 , pp. 440-453
    • Hall, N.G.1    Potts, C.N.2
  • 11
    • 0030244109 scopus 로고    scopus 로고
    • Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
    • Kim J.U., and Kim Y.D. Simulated annealing and genetic algorithms for scheduling products with multi-level product structure. Computers and Operations Research 23 9 (1996) 857-868
    • (1996) Computers and Operations Research , vol.23 , Issue.9 , pp. 857-868
    • Kim, J.U.1    Kim, Y.D.2
  • 12
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • Lee Y.H., Jeong C.S., and Moon C. Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering 43 1-2 (2002) 351-374
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 13
    • 0028401193 scopus 로고
    • The effects of environmental factors on the design of master production scheduling systems
    • Lin N.P., Krajewski L., Leong G.K., and Benton W.C. The effects of environmental factors on the design of master production scheduling systems. Journal of Operations Management 11 4 (1994) 367-384
    • (1994) Journal of Operations Management , vol.11 , Issue.4 , pp. 367-384
    • Lin, N.P.1    Krajewski, L.2    Leong, G.K.3    Benton, W.C.4
  • 14
    • 3142777327 scopus 로고    scopus 로고
    • Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
    • Moon C., Kim J.S., and Gen M. Advanced planning and scheduling based on precedence and resource constraints for e-plant chains. International Journal of Production Research 42 15 (2004) 2941-2954
    • (2004) International Journal of Production Research , vol.42 , Issue.15 , pp. 2941-2954
    • Moon, C.1    Kim, J.S.2    Gen, M.3
  • 15
    • 0001027563 scopus 로고    scopus 로고
    • A computational study on design and performance issues of multi-agent intelligent systems for dynamic scheduling environments
    • Pendharkar P.C. A computational study on design and performance issues of multi-agent intelligent systems for dynamic scheduling environments. Expert Systems with Applications 16 2 (1999) 121-133
    • (1999) Expert Systems with Applications , vol.16 , Issue.2 , pp. 121-133
    • Pendharkar, P.C.1
  • 17
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu I., and Bayiz M. Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research 126 3 (2000) 567-586
    • (2000) European Journal of Operational Research , vol.126 , Issue.3 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 18
    • 0344320671 scopus 로고    scopus 로고
    • A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources
    • Sun J., and Xue D. A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources. Computers in Industry 46 2 (2001) 189-207
    • (2001) Computers in Industry , vol.46 , Issue.2 , pp. 189-207
    • Sun, J.1    Xue, D.2
  • 20
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • Vieira G.E., Herrmann J.W., and Lin E. Rescheduling manufacturing systems: A framework of strategies, policies, and methods. Journal of Scheduling 6 1 (2003) 39-62
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 21
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu S.D., Storer R.H., and Chang P.C. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research 20 1 (1993) 1-14
    • (1993) Computers and Operations Research , vol.20 , Issue.1 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.