Volumn 137, Issue 7, 2011, Pages 536-550

Applying optimal control model to dynamic equipment allocation problem: Case study of concrete-faced rockfill dam construction project

Author keywords

Construction equipment; Dynamic models; Optimization

Indexed keywords

CHI-SQUARE GOODNESS-OF-FIT TEST; CONCRETE FACED ROCKFILL DAM; CONSTRAINT CONDITIONS; EQUIPMENT ALLOCATION; EQUIPMENT FAILURES; INITIAL CONDITIONS; OBJECTIVE FUNCTIONS; OPTIMAL CONTROL MODEL; OPTIMAL SOLUTIONS; OPTIMIZATION METHOD; PARTICLE SWARM OPTIMIZATION TECHNIQUE; RELATIONSHIP EQUATIONS; SHUIBUYA HYDROPOWER PROJECT;

EID: 79960214268     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000325     Document Type: Article
Times cited : (27)

References (37)
  • 1
    • 20444473526 scopus 로고
    • Analysis methodologies
    • A. G. Cannon and A. Bendell, eds., Galliard Ltd., London
    • Bendell, A. (1991). Analysis methodologies.. Reliability data banks, A. G. Cannon, and, A. Bendell, eds., Galliard Ltd., London.
    • (1991) Reliability Data Banks
    • Bendell, A.1
  • 2
    • 13944249154 scopus 로고    scopus 로고
    • Case study of obsolescence and equipment productivity
    • DOI 10.1061/(ASCE)0733-9364(2002)128:4(357)
    • Bhurisith, I., and Touran, A. (2002). Case study of obsolescence and equipment productivity.. J. Constr. Eng. Manage., 128 (4), 357-361. 0733-9364 10.1061/(ASCE)0733-9364(2002)128:4(357) (Pubitemid 40265541)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 357-361
    • Bhurisith, I.1    Touran, A.2
  • 3
    • 34249040596 scopus 로고    scopus 로고
    • Caterpillar.., 29th Ed., Peoria, IL
    • Caterpillar. (1998). Caterpillar performance handbook, 29th Ed., Peoria, IL.
    • (1998) Caterpillar Performance Handbook
  • 4
    • 20444466385 scopus 로고    scopus 로고
    • Poisson model of construction incident occurrence
    • DOI 10.1061/(ASCE)0733-9364(2005)131:6(715)
    • Chua, D. K. H., and Goh, Y. M. (2005). Poisson model of construction incident occurrence.. J. Constr. Eng. Manage., 131 (6), 715-722. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:6(715) (Pubitemid 40818739)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.6 , pp. 715-722
    • Chua, D.K.H.1    Goh, Y.M.2
  • 5
    • 0036464756 scopus 로고    scopus 로고
    • The particle swarm-explosion, stability, and convergence in a multidimensional complex space
    • DOI 10.1109/4235.985692, PII S1089778X02022099
    • Clerc, M., and Kennedy, J. (2002). The particle swarm-explosion, stability, and convergence in a multidimensional complex space.. IEEE Trans. Evol. Comput., 6 (1), 58-73. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:1(72) (Pubitemid 34404564)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.1 , pp. 58-73
    • Clerc, M.1    Kennedy, J.2
  • 6
    • 0032654594 scopus 로고    scopus 로고
    • Genetic algorithms application and testing for equipment selection
    • 0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(32)
    • Haidar, A., Naoum, S., Howes, R., and Tah, J. (1999). Genetic algorithms application and testing for equipment selection.. J. Constr. Eng. Manage., 125 (1), 32-38. 0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(32)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 32-38
    • Haidar, A.1    Naoum, S.2    Howes, R.3    Tah, J.4
  • 7
    • 33846291054 scopus 로고    scopus 로고
    • Delay time analysis in microtunneling projects
    • DOI 10.1061/(ASCE)0733-9364(2007)133:2(191)
    • Hegab, M. Y., and Smith, G. R. (2007). Delay time analysis in microtunneling projects.. J. Constr. Eng. Manage., 133 (2), 191-195. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:2(191) (Pubitemid 46121728)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.2 , pp. 191-195
    • Hegab, M.Y.1    Smith, G.R.2
  • 8
    • 29744438237 scopus 로고    scopus 로고
    • Maintenance strategy based on a multicriterion classification of equipments
    • DOI 10.1016/j.ress.2005.03.001, PII S0951832005000803
    • Hijes, F. G., and Cartagena, J. J. (2006). Maintenance strategy based on a multicriterion classification of equipments.. Reliab. Eng. Syst. Saf., 91 (4), 444-451. 0951-8320 10.1016/j.ress.2005.03.001 (Pubitemid 43031347)
    • (2006) Reliability Engineering and System Safety , vol.91 , Issue.4 , pp. 444-451
    • Gomez De Leon Hijes, F.C.1    Cartagena, J.J.R.2
  • 9
    • 64249094231 scopus 로고    scopus 로고
    • Present situation and future prospect of hydropower in China
    • 1364-0321 10.1016/j.rser.2008.08.013
    • Huang, H., and Yan, Z. (2009). Present situation and future prospect of hydropower in China.. Renew. Sustain. Energ. Rev., 13 (6-7), 1652-1656. 1364-0321 10.1016/j.rser.2008.08.013
    • (2009) Renew. Sustain. Energ. Rev. , vol.13 , Issue.67 , pp. 1652-1656
    • Huang, H.1    Yan, Z.2
  • 10
    • 33845270417 scopus 로고    scopus 로고
    • Optimal preventive maintenance of leased equipment with corrective minimal repairs
    • DOI 10.1016/j.ejor.2005.01.049, PII S0377221705002006
    • Jaturonnatee, J., Murthy, D. N. P., and Boondiskulchok, R. (2006). Optimal preventive maintenance of leased equipment with corrective minimal repairs.. Eur. J. Oper. Res., 174 (1), 201-215. 0377-2217 10.1016/j.ejor.2005. 01.049 (Pubitemid 44866832)
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 201-215
    • Jaturonnatee, J.1    Murthy, D.N.P.2    Boondiskulchok, R.3
  • 11
    • 26844442692 scopus 로고    scopus 로고
    • Models and algorithm for stochastic shortest path problem
    • DOI 10.1016/j.amc.2004.12.015, PII S0096300304009646
    • Ji, X. (2005). Models and algorithm for stochastic shortest path problem.. Appl. Math. Comput., 170 (1), 503-514. 0096-3003 10.1016/j.amc.2004. 12.015 (Pubitemid 41454827)
    • (2005) Applied Mathematics and Computation , vol.170 , Issue.1 , pp. 503-514
    • Ji, X.1
  • 12
    • 0029535737 scopus 로고
    • Particle swarm optimization
    • Institute of Electrical and Electronics Engineers, New York
    • Kennedy, J., and Eberhart, R. C. (1995). Particle swarm optimization.. Proc., IEEE Conf. on Neural Networks, Institute of Electrical and Electronics Engineers, New York, 1942-1948.
    • (1995) Proc., IEEE Conf. on Neural Networks , pp. 1942-1948
    • Kennedy, J.1    Eberhart, R.C.2
  • 13
    • 42949174752 scopus 로고    scopus 로고
    • Prediction of relative crest settlement of concrete-faced rockfill dams analyzed using an artificial neural network model
    • DOI 10.1016/j.compgeo.2007.09.006, PII S0266352X07001061
    • Kim, Y. S., and Kim, B. T. (2008). Prediction of relative crest settlement of concrete-faced rockfill dams analyzed using an artificial neural network model.. Comput. Geotech., 35 (3), 313-322. 0266-352X 10.1016/j.compgeo.2007.09.006 (Pubitemid 351618088)
    • (2008) Computers and Geotechnics , vol.35 , Issue.3 , pp. 313-322
    • Kim, Y.-S.1    Kim, B.-T.2
  • 14
    • 34948868342 scopus 로고    scopus 로고
    • Evolving problems to learn about particle swarm optimizers and other search algorithms
    • DOI 10.1109/TEVC.2006.886448
    • Langdon, W. B., and Poli, R. (2007). Evolving problems to learn about particle swarm optimizers and other search algorithms.. IEEE Trans. Evol. Comput., 11 (5), 561-578. 0040-1706 10.1198/004017005000000544 (Pubitemid 47527990)
    • (2007) IEEE Transactions on Evolutionary Computation , vol.11 , Issue.5 , pp. 561-578
    • Langdon, W.B.1    Poli, R.2
  • 16
    • 33846303577 scopus 로고    scopus 로고
    • Optimal preventive maintenance for equipment with two quality states and general failure time distributions
    • DOI 10.1016/j.ejor.2006.04.014, PII S0377221706002803
    • Panagiotidou, S., and Tagaras, G. (2007). Optimal preventive maintenance for equipment with two quality states and general failure time distributions.. Eur. J. Oper. Res., 180 (1), 329-353. 0377-2217 10.1016/j.ejor.2006.04.014 (Pubitemid 46123861)
    • (2007) European Journal of Operational Research , vol.180 , Issue.1 , pp. 329-353
    • Panagiotidou, S.1    Tagaras, G.2
  • 17
    • 0010355729 scopus 로고
    • Effects of warranty execution on warranty reserve costs
    • 0025-1909 10.1287/mnsc.41.3.395
    • Patankar, J., and Mitra, A. (1995). Effects of warranty execution on warranty reserve costs.. Manage. Sci., 41 (3), 395-400. 0025-1909 10.1287/mnsc.41.3.395
    • (1995) Manage. Sci. , vol.41 , Issue.3 , pp. 395-400
    • Patankar, J.1    Mitra, A.2
  • 18
    • 33645242898 scopus 로고    scopus 로고
    • Optimal periodic preventive maintenance policy for leased equipment
    • 0951-8320 10.1016/j.ress.2005.07.005
    • Pongpech, J., and Murthy, D. N. P. (2006). Optimal periodic preventive maintenance policy for leased equipment.. Reliab. Eng. Syst. Saf., 91 (7), 772-777. 0951-8320 10.1016/j.ress.2005.07.005
    • (2006) Reliab. Eng. Syst. Saf. , vol.91 , Issue.7 , pp. 772-777
    • Pongpech, J.1    Murthy, D.N.P.2
  • 19
    • 70349334594 scopus 로고    scopus 로고
    • Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors
    • (a). ., 0733-9364 10.1061/(ASCE)CO.1943-7862.0000076
    • Prasertrungruang, T., and Hadikusumo, B. H. W. (2009 a). Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors.. J. Constr. Eng. Manage., 135 (10), 939-947. 0733-9364 10.1061/(ASCE)CO.1943-7862.0000076
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.10 , pp. 939-947
    • Prasertrungruang, T.1    Hadikusumo, B.H.W.2
  • 20
    • 58149233753 scopus 로고    scopus 로고
    • Study of factors influencing the efficient management and downtime consequences of highway construction equipment in Thailand
    • (b). ., 0733-9364 10.1061/(ASCE)0733-9364(2009)135:1(2)
    • Prasertrungruang, T., and Hadikusumo, B. H. W. (2009 b). Study of factors influencing the efficient management and downtime consequences of highway construction equipment in Thailand.. J. Constr. Eng. Manage., 135 (1), 2-11. 0733-9364 10.1061/(ASCE)0733-9364(2009)135:1(2)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.1 , pp. 2-11
    • Prasertrungruang, T.1    Hadikusumo, B.H.W.2
  • 22
    • 0001326556 scopus 로고    scopus 로고
    • Reliability analysis of shovel machines used in an open cast coal mine
    • DOI 10.1142/S0950609801000610
    • Samanta, B., Sarkar, B., and Mukherjee, S. (2001). Reliability analysis of shovel machines used in an open cast coal mine.. Miner. Resour. Eng. 0950-6098, 10 (2), 219-231. 10.1142/S0950609801000610 (Pubitemid 33691814)
    • (2001) Mineral Resources Engineering , vol.10 , Issue.2 , pp. 219-231
    • Samanta, B.1    Sarkar, B.2    Mukherjee, S.K.3
  • 23
    • 30944464890 scopus 로고    scopus 로고
    • Zur statistik in der betriebsfestigkeit
    • DOI 10.1002/mawe.200300722
    • Seifried, A. (2004). About statistics in fatigue strength.. Materialwissenschaft und Werkstofftechnik, 35 (2), 93-111. 0933-5137 10.1002/mawe.200300722 (Pubitemid 44616103)
    • (2004) Materialwissenschaft und Werkstofftechnik , vol.35 , Issue.2 , pp. 93-108
    • Seifried, A.1
  • 24
    • 0005690198 scopus 로고    scopus 로고
    • Graphical control interface for construction and maintenance equipment
    • 0733-9364 10.1061/(ASCE)0733-9364(2000)126:3(210)
    • Seo, J., Haas, C. T., Saidi, K., and Sreenivasan, S. V. (2000). Graphical control interface for construction and maintenance equipment.. J. Constr. Eng. Manage., 126 (3), 210-218. 0733-9364 10.1061/(ASCE)0733-9364(2000)126:3(210)
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.3 , pp. 210-218
    • Seo, J.1    Haas, C.T.2    Saidi, K.3    Sreenivasan, S.V.4
  • 25
    • 29044433463 scopus 로고    scopus 로고
    • AHP-based equipment selection model for construction projects
    • DOI 10.1061/(ASCE)0733-9364(2005)131:12(1263)
    • Shapira, A., and Goldenberg, M. (2005). AHP-based equipment selection model for construction projects.. J. Constr. Eng. Manage., 131 (12), 1263-1273. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:12(1263) (Pubitemid 41788464)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.12 , pp. 1263-1273
    • Shapira, A.1    Goldenberg, M.2
  • 26
    • 34548680971 scopus 로고    scopus 로고
    • Soft considerations in equipment selection for building construction projects
    • DOI 10.1061/(ASCE)0733-9364(2007)133:10(749)
    • Shapira, A., and Goldenberg, M. (2007). Soft considerations in equipment selection for building construction projects.. J. Constr. Eng. Manage., 133 (10), 749-760. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:10(749) (Pubitemid 47416123)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.10 , pp. 749-760
    • Shapira, A.1    Goldenberg, M.2
  • 27
    • 84879015433 scopus 로고    scopus 로고
    • Parameter selection in particle swarm optimization
    • Evolutionary Programming VII
    • Shi, Y., and Eberhart, R. C. (1998). Parameter selection in particle swarm optimization.. Proc., 7th Annual Conf. on Evolutionary Programming: VII, Springer, New York, 591-600. (Pubitemid 128118969)
    • (1998) Lecture Notes In Computer Science , Issue.1447 , pp. 591-600
    • Shi, Y.1    Eberhart, R.C.2
  • 29
    • 0030851208 scopus 로고    scopus 로고
    • Rational equipment selection method based on soil conditions
    • 0733-9364 10.1061/(ASCE)0733-9364(1997)123:1(85)
    • Touran, A., Sheahan, T. C., and Ozcan, E. (1997). Rational equipment selection method based on soil conditions.. J. Constr. Eng. Manage., 123 (1), 85-88. 0733-9364 10.1061/(ASCE)0733-9364(1997)123:1(85)
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.1 , pp. 85-88
    • Touran, A.1    Sheahan, T.C.2    Ozcan, E.3
  • 30
    • 0037475094 scopus 로고    scopus 로고
    • The particle swarm optimization algorithm: Convergence analysis and parameter selection
    • 0020-0190, 10.1016/S0020-0190(02)00447-7
    • Trelea, I. C. (2003). The particle swarm optimization algorithm: Convergence analysis and parameter selection.. Inf. Proc. Lett. 0020-0190, 85 (6), 317-325. 10.1016/S0020-0190(02)00447-7
    • (2003) Inf. Proc. Lett. , vol.85 , Issue.6 , pp. 317-325
    • Trelea, I.C.1
  • 32
    • 67549098078 scopus 로고    scopus 로고
    • A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem
    • 0020-0255, 10.1016/j.ins.2009.04.009
    • Xu, J., and Zhou, X. (2009). A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem.. Inf. Sci. (N. Y.) 0020-0255, 179 (17), 2997-3017. 10.1016/j.ins.2009.04.009
    • (2009) Inf. Sci. (N. Y.) , vol.179 , Issue.17 , pp. 2997-3017
    • Xu, J.1    Zhou, X.2
  • 33
    • 36649037843 scopus 로고    scopus 로고
    • Comparison of new conditional value-at-risk-based management models for optimal allocation of uncertain water supplies
    • DOI 10.1029/2006WR005210
    • Yamout, G. M., Haltfield, K., and Romeijn, H. E. (2007). Comparison of new conditional value-at-risk-based management models for optimal allocation of uncertain water supplies.. Water Resour. Res., 43 (7), W07430. 0043-1397 10.1029/2006WR005210 (Pubitemid 350194482)
    • (2007) Water Resources Research , vol.43 , Issue.7
    • Yamout, G.M.1    Hatfield, K.2    Romeijn, H.E.3
  • 34
    • 32944474678 scopus 로고    scopus 로고
    • Particle swarm optimization for preemptive scheduling under break and resource-constraints
    • DOI 10.1061/(ASCE)0733-9364(2006)132:3(259)
    • Zhang, H., Li, H., and Tam, C. M. (2006 a). Particle swarm optimization for preemptive scheduling under break and resource-constraints.. J. Constr. Eng. Manage., 132 (3), 259-267. 0733-9364 10.1061/(ASCE)0733-9364(2006)132:3(259) (Pubitemid 43260126)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.3 , pp. 259-267
    • Zhang, H.1    Li, H.2    Tam, C.M.3
  • 35
    • 32944459555 scopus 로고    scopus 로고
    • Permutation-based particle swarm optimization for resource-constrained project scheduling
    • DOI 10.1061/(ASCE)0887-3801(2006)20:2(141)
    • Zhang, H., Li, H., and Tam, C. M. (2006 b). Permutation-based particle swarm optimization for resource-constrained project scheduling.. J. Comput. Civ. Eng., 20 (2), 141-149. 0887-3801 10.1061/(ASCE)0887-3801(2006)20:2(141) (Pubitemid 43260088)
    • (2006) Journal of Computing in Civil Engineering , vol.20 , Issue.2 , pp. 141-149
    • Zhang, H.1    Li, H.2    Tam, C.M.3
  • 36
    • 33751276778 scopus 로고    scopus 로고
    • Particle swarm optimization-supported simulation for construction operations
    • DOI 10.1061/(ASCE)0733-9364(2006)132:12(1267), 009612QCO
    • Zhang, H., Tam, C. M., Li, H., and Shi, J. J. (2006 c). Particle swarm optimization-supported simulation for construction operations.. J. Constr. Eng. Manage., 132 (12), 1267-1274. 0733-9364 10.1061/(ASCE)0733-9364(2006)132: 12(1267) (Pubitemid 44794266)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.12 , pp. 1267-1274
    • Zhang, H.1    Tam, C.M.2    Li, H.3    Shi, J.J.4
  • 37
    • 49749097235 scopus 로고    scopus 로고
    • Particle swarm optimization for construction site unequal-are layout
    • 0733-9364 10.1061/(ASCE)0733-9364(2008)134:9(739)
    • Zhang, H., and Wang, J. (2008). Particle swarm optimization for construction site unequal-are layout.. J. Constr. Eng. Manage., 134 (9), 739-748. 0733-9364 10.1061/(ASCE)0733-9364(2008)134:9(739)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.9 , pp. 739-748
    • Zhang, H.1    Wang, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.