1
-
-
20444473526
-
Analysis methodologies
-
A. G. Cannon and A. Bendell, eds., Galliard Ltd., London
-
Bendell, A. (1991). Analysis methodologies.. Reliability data banks, A. G. Cannon, and, A. Bendell, eds., Galliard Ltd., London.
-
(1991)
Reliability Data Banks
-
-
Bendell, A.1
-
2
-
-
13944249154
-
Case study of obsolescence and equipment productivity
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(357)
-
Bhurisith, I., and Touran, A. (2002). Case study of obsolescence and equipment productivity.. J. Constr. Eng. Manage., 128 (4), 357-361. 0733-9364 10.1061/(ASCE)0733-9364(2002)128:4(357) (Pubitemid 40265541)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 357-361
-
-
Bhurisith, I.1
Touran, A.2
-
3
-
-
34249040596
-
-
Caterpillar.., 29th Ed., Peoria, IL
-
Caterpillar. (1998). Caterpillar performance handbook, 29th Ed., Peoria, IL.
-
(1998)
Caterpillar Performance Handbook
-
-
-
4
-
-
20444466385
-
Poisson model of construction incident occurrence
-
DOI 10.1061/(ASCE)0733-9364(2005)131:6(715)
-
Chua, D. K. H., and Goh, Y. M. (2005). Poisson model of construction incident occurrence.. J. Constr. Eng. Manage., 131 (6), 715-722. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:6(715) (Pubitemid 40818739)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.6
, pp. 715-722
-
-
Chua, D.K.H.1
Goh, Y.M.2
-
5
-
-
0036464756
-
The particle swarm-explosion, stability, and convergence in a multidimensional complex space
-
DOI 10.1109/4235.985692, PII S1089778X02022099
-
Clerc, M., and Kennedy, J. (2002). The particle swarm-explosion, stability, and convergence in a multidimensional complex space.. IEEE Trans. Evol. Comput., 6 (1), 58-73. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:1(72) (Pubitemid 34404564)
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.1
, pp. 58-73
-
-
Clerc, M.1
Kennedy, J.2
-
6
-
-
0032654594
-
Genetic algorithms application and testing for equipment selection
-
0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(32)
-
Haidar, A., Naoum, S., Howes, R., and Tah, J. (1999). Genetic algorithms application and testing for equipment selection.. J. Constr. Eng. Manage., 125 (1), 32-38. 0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(32)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 32-38
-
-
Haidar, A.1
Naoum, S.2
Howes, R.3
Tah, J.4
-
7
-
-
33846291054
-
Delay time analysis in microtunneling projects
-
DOI 10.1061/(ASCE)0733-9364(2007)133:2(191)
-
Hegab, M. Y., and Smith, G. R. (2007). Delay time analysis in microtunneling projects.. J. Constr. Eng. Manage., 133 (2), 191-195. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:2(191) (Pubitemid 46121728)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.2
, pp. 191-195
-
-
Hegab, M.Y.1
Smith, G.R.2
-
8
-
-
29744438237
-
Maintenance strategy based on a multicriterion classification of equipments
-
DOI 10.1016/j.ress.2005.03.001, PII S0951832005000803
-
Hijes, F. G., and Cartagena, J. J. (2006). Maintenance strategy based on a multicriterion classification of equipments.. Reliab. Eng. Syst. Saf., 91 (4), 444-451. 0951-8320 10.1016/j.ress.2005.03.001 (Pubitemid 43031347)
-
(2006)
Reliability Engineering and System Safety
, vol.91
, Issue.4
, pp. 444-451
-
-
Gomez De Leon Hijes, F.C.1
Cartagena, J.J.R.2
-
9
-
-
64249094231
-
Present situation and future prospect of hydropower in China
-
1364-0321 10.1016/j.rser.2008.08.013
-
Huang, H., and Yan, Z. (2009). Present situation and future prospect of hydropower in China.. Renew. Sustain. Energ. Rev., 13 (6-7), 1652-1656. 1364-0321 10.1016/j.rser.2008.08.013
-
(2009)
Renew. Sustain. Energ. Rev.
, vol.13
, Issue.67
, pp. 1652-1656
-
-
Huang, H.1
Yan, Z.2
-
10
-
-
33845270417
-
Optimal preventive maintenance of leased equipment with corrective minimal repairs
-
DOI 10.1016/j.ejor.2005.01.049, PII S0377221705002006
-
Jaturonnatee, J., Murthy, D. N. P., and Boondiskulchok, R. (2006). Optimal preventive maintenance of leased equipment with corrective minimal repairs.. Eur. J. Oper. Res., 174 (1), 201-215. 0377-2217 10.1016/j.ejor.2005. 01.049 (Pubitemid 44866832)
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.1
, pp. 201-215
-
-
Jaturonnatee, J.1
Murthy, D.N.P.2
Boondiskulchok, R.3
-
11
-
-
26844442692
-
Models and algorithm for stochastic shortest path problem
-
DOI 10.1016/j.amc.2004.12.015, PII S0096300304009646
-
Ji, X. (2005). Models and algorithm for stochastic shortest path problem.. Appl. Math. Comput., 170 (1), 503-514. 0096-3003 10.1016/j.amc.2004. 12.015 (Pubitemid 41454827)
-
(2005)
Applied Mathematics and Computation
, vol.170
, Issue.1
, pp. 503-514
-
-
Ji, X.1
-
12
-
-
0029535737
-
Particle swarm optimization
-
Institute of Electrical and Electronics Engineers, New York
-
Kennedy, J., and Eberhart, R. C. (1995). Particle swarm optimization.. Proc., IEEE Conf. on Neural Networks, Institute of Electrical and Electronics Engineers, New York, 1942-1948.
-
(1995)
Proc., IEEE Conf. on Neural Networks
, pp. 1942-1948
-
-
Kennedy, J.1
Eberhart, R.C.2
-
13
-
-
42949174752
-
Prediction of relative crest settlement of concrete-faced rockfill dams analyzed using an artificial neural network model
-
DOI 10.1016/j.compgeo.2007.09.006, PII S0266352X07001061
-
Kim, Y. S., and Kim, B. T. (2008). Prediction of relative crest settlement of concrete-faced rockfill dams analyzed using an artificial neural network model.. Comput. Geotech., 35 (3), 313-322. 0266-352X 10.1016/j.compgeo.2007.09.006 (Pubitemid 351618088)
-
(2008)
Computers and Geotechnics
, vol.35
, Issue.3
, pp. 313-322
-
-
Kim, Y.-S.1
Kim, B.-T.2
-
14
-
-
34948868342
-
Evolving problems to learn about particle swarm optimizers and other search algorithms
-
DOI 10.1109/TEVC.2006.886448
-
Langdon, W. B., and Poli, R. (2007). Evolving problems to learn about particle swarm optimizers and other search algorithms.. IEEE Trans. Evol. Comput., 11 (5), 561-578. 0040-1706 10.1198/004017005000000544 (Pubitemid 47527990)
-
(2007)
IEEE Transactions on Evolutionary Computation
, vol.11
, Issue.5
, pp. 561-578
-
-
Langdon, W.B.1
Poli, R.2
-
15
-
-
0003754441
-
-
2nd Ed., Wiley, Singapore
-
Montgomery, D. C., and Runger, G. C. (1999). Applied statistics and probability for engineers, 2nd Ed., Wiley, Singapore.
-
(1999)
Applied Statistics and Probability for Engineers
-
-
Montgomery, D.C.1
Runger, G.C.2
-
16
-
-
33846303577
-
Optimal preventive maintenance for equipment with two quality states and general failure time distributions
-
DOI 10.1016/j.ejor.2006.04.014, PII S0377221706002803
-
Panagiotidou, S., and Tagaras, G. (2007). Optimal preventive maintenance for equipment with two quality states and general failure time distributions.. Eur. J. Oper. Res., 180 (1), 329-353. 0377-2217 10.1016/j.ejor.2006.04.014 (Pubitemid 46123861)
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.1
, pp. 329-353
-
-
Panagiotidou, S.1
Tagaras, G.2
-
17
-
-
0010355729
-
Effects of warranty execution on warranty reserve costs
-
0025-1909 10.1287/mnsc.41.3.395
-
Patankar, J., and Mitra, A. (1995). Effects of warranty execution on warranty reserve costs.. Manage. Sci., 41 (3), 395-400. 0025-1909 10.1287/mnsc.41.3.395
-
(1995)
Manage. Sci.
, vol.41
, Issue.3
, pp. 395-400
-
-
Patankar, J.1
Mitra, A.2
-
18
-
-
33645242898
-
Optimal periodic preventive maintenance policy for leased equipment
-
0951-8320 10.1016/j.ress.2005.07.005
-
Pongpech, J., and Murthy, D. N. P. (2006). Optimal periodic preventive maintenance policy for leased equipment.. Reliab. Eng. Syst. Saf., 91 (7), 772-777. 0951-8320 10.1016/j.ress.2005.07.005
-
(2006)
Reliab. Eng. Syst. Saf.
, vol.91
, Issue.7
, pp. 772-777
-
-
Pongpech, J.1
Murthy, D.N.P.2
-
19
-
-
70349334594
-
Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors
-
(a). ., 0733-9364 10.1061/(ASCE)CO.1943-7862.0000076
-
Prasertrungruang, T., and Hadikusumo, B. H. W. (2009 a). Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors.. J. Constr. Eng. Manage., 135 (10), 939-947. 0733-9364 10.1061/(ASCE)CO.1943-7862.0000076
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.10
, pp. 939-947
-
-
Prasertrungruang, T.1
Hadikusumo, B.H.W.2
-
20
-
-
58149233753
-
Study of factors influencing the efficient management and downtime consequences of highway construction equipment in Thailand
-
(b). ., 0733-9364 10.1061/(ASCE)0733-9364(2009)135:1(2)
-
Prasertrungruang, T., and Hadikusumo, B. H. W. (2009 b). Study of factors influencing the efficient management and downtime consequences of highway construction equipment in Thailand.. J. Constr. Eng. Manage., 135 (1), 2-11. 0733-9364 10.1061/(ASCE)0733-9364(2009)135:1(2)
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.1
, pp. 2-11
-
-
Prasertrungruang, T.1
Hadikusumo, B.H.W.2
-
22
-
-
0001326556
-
Reliability analysis of shovel machines used in an open cast coal mine
-
DOI 10.1142/S0950609801000610
-
Samanta, B., Sarkar, B., and Mukherjee, S. (2001). Reliability analysis of shovel machines used in an open cast coal mine.. Miner. Resour. Eng. 0950-6098, 10 (2), 219-231. 10.1142/S0950609801000610 (Pubitemid 33691814)
-
(2001)
Mineral Resources Engineering
, vol.10
, Issue.2
, pp. 219-231
-
-
Samanta, B.1
Sarkar, B.2
Mukherjee, S.K.3
-
23
-
-
30944464890
-
Zur statistik in der betriebsfestigkeit
-
DOI 10.1002/mawe.200300722
-
Seifried, A. (2004). About statistics in fatigue strength.. Materialwissenschaft und Werkstofftechnik, 35 (2), 93-111. 0933-5137 10.1002/mawe.200300722 (Pubitemid 44616103)
-
(2004)
Materialwissenschaft und Werkstofftechnik
, vol.35
, Issue.2
, pp. 93-108
-
-
Seifried, A.1
-
24
-
-
0005690198
-
Graphical control interface for construction and maintenance equipment
-
0733-9364 10.1061/(ASCE)0733-9364(2000)126:3(210)
-
Seo, J., Haas, C. T., Saidi, K., and Sreenivasan, S. V. (2000). Graphical control interface for construction and maintenance equipment.. J. Constr. Eng. Manage., 126 (3), 210-218. 0733-9364 10.1061/(ASCE)0733-9364(2000)126:3(210)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.3
, pp. 210-218
-
-
Seo, J.1
Haas, C.T.2
Saidi, K.3
Sreenivasan, S.V.4
-
25
-
-
29044433463
-
AHP-based equipment selection model for construction projects
-
DOI 10.1061/(ASCE)0733-9364(2005)131:12(1263)
-
Shapira, A., and Goldenberg, M. (2005). AHP-based equipment selection model for construction projects.. J. Constr. Eng. Manage., 131 (12), 1263-1273. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:12(1263) (Pubitemid 41788464)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.12
, pp. 1263-1273
-
-
Shapira, A.1
Goldenberg, M.2
-
26
-
-
34548680971
-
Soft considerations in equipment selection for building construction projects
-
DOI 10.1061/(ASCE)0733-9364(2007)133:10(749)
-
Shapira, A., and Goldenberg, M. (2007). Soft considerations in equipment selection for building construction projects.. J. Constr. Eng. Manage., 133 (10), 749-760. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:10(749) (Pubitemid 47416123)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.10
, pp. 749-760
-
-
Shapira, A.1
Goldenberg, M.2
-
27
-
-
84879015433
-
Parameter selection in particle swarm optimization
-
Evolutionary Programming VII
-
Shi, Y., and Eberhart, R. C. (1998). Parameter selection in particle swarm optimization.. Proc., 7th Annual Conf. on Evolutionary Programming: VII, Springer, New York, 591-600. (Pubitemid 128118969)
-
(1998)
Lecture Notes In Computer Science
, Issue.1447
, pp. 591-600
-
-
Shi, Y.1
Eberhart, R.C.2
-
28
-
-
35348886085
-
Gates' bidding model
-
DOI 10.1061/(ASCE)0733-9364(2007)133:11(855)
-
Skitmore, R. M., Pettitt, A. N., and McVinish, R. (2007). Gates' bidding model.. J. Constr. Eng. Manage., 133 (11), 855-863. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:11(855) (Pubitemid 47587928)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.11
, pp. 855-863
-
-
Skitmore, R.M.1
Pettitt, A.N.2
McVinish, R.3
-
29
-
-
0030851208
-
Rational equipment selection method based on soil conditions
-
0733-9364 10.1061/(ASCE)0733-9364(1997)123:1(85)
-
Touran, A., Sheahan, T. C., and Ozcan, E. (1997). Rational equipment selection method based on soil conditions.. J. Constr. Eng. Manage., 123 (1), 85-88. 0733-9364 10.1061/(ASCE)0733-9364(1997)123:1(85)
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.1
, pp. 85-88
-
-
Touran, A.1
Sheahan, T.C.2
Ozcan, E.3
-
30
-
-
0037475094
-
The particle swarm optimization algorithm: Convergence analysis and parameter selection
-
0020-0190, 10.1016/S0020-0190(02)00447-7
-
Trelea, I. C. (2003). The particle swarm optimization algorithm: Convergence analysis and parameter selection.. Inf. Proc. Lett. 0020-0190, 85 (6), 317-325. 10.1016/S0020-0190(02)00447-7
-
(2003)
Inf. Proc. Lett.
, vol.85
, Issue.6
, pp. 317-325
-
-
Trelea, I.C.1
-
31
-
-
85040879729
-
-
Concrete face rockfill dams-design, construction, and performance
-
Varty, A., Boyle, R., Pritchard, E., and Gill, R. (1985). Construction of concrete face rockfill dams.. Concrete face rockfill dams-design, construction, and performance, 435-458.
-
(1985)
Construction of Concrete Face Rockfill Dams
, pp. 435-458
-
-
Varty, A.1
Boyle, R.2
Pritchard, E.3
Gill, R.4
-
32
-
-
67549098078
-
A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem
-
0020-0255, 10.1016/j.ins.2009.04.009
-
Xu, J., and Zhou, X. (2009). A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem.. Inf. Sci. (N. Y.) 0020-0255, 179 (17), 2997-3017. 10.1016/j.ins.2009.04.009
-
(2009)
Inf. Sci. (N. Y.)
, vol.179
, Issue.17
, pp. 2997-3017
-
-
Xu, J.1
Zhou, X.2
-
33
-
-
36649037843
-
Comparison of new conditional value-at-risk-based management models for optimal allocation of uncertain water supplies
-
DOI 10.1029/2006WR005210
-
Yamout, G. M., Haltfield, K., and Romeijn, H. E. (2007). Comparison of new conditional value-at-risk-based management models for optimal allocation of uncertain water supplies.. Water Resour. Res., 43 (7), W07430. 0043-1397 10.1029/2006WR005210 (Pubitemid 350194482)
-
(2007)
Water Resources Research
, vol.43
, Issue.7
-
-
Yamout, G.M.1
Hatfield, K.2
Romeijn, H.E.3
-
34
-
-
32944474678
-
Particle swarm optimization for preemptive scheduling under break and resource-constraints
-
DOI 10.1061/(ASCE)0733-9364(2006)132:3(259)
-
Zhang, H., Li, H., and Tam, C. M. (2006 a). Particle swarm optimization for preemptive scheduling under break and resource-constraints.. J. Constr. Eng. Manage., 132 (3), 259-267. 0733-9364 10.1061/(ASCE)0733-9364(2006)132:3(259) (Pubitemid 43260126)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.3
, pp. 259-267
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
-
35
-
-
32944459555
-
Permutation-based particle swarm optimization for resource-constrained project scheduling
-
DOI 10.1061/(ASCE)0887-3801(2006)20:2(141)
-
Zhang, H., Li, H., and Tam, C. M. (2006 b). Permutation-based particle swarm optimization for resource-constrained project scheduling.. J. Comput. Civ. Eng., 20 (2), 141-149. 0887-3801 10.1061/(ASCE)0887-3801(2006)20:2(141) (Pubitemid 43260088)
-
(2006)
Journal of Computing in Civil Engineering
, vol.20
, Issue.2
, pp. 141-149
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
-
36
-
-
33751276778
-
Particle swarm optimization-supported simulation for construction operations
-
DOI 10.1061/(ASCE)0733-9364(2006)132:12(1267), 009612QCO
-
Zhang, H., Tam, C. M., Li, H., and Shi, J. J. (2006 c). Particle swarm optimization-supported simulation for construction operations.. J. Constr. Eng. Manage., 132 (12), 1267-1274. 0733-9364 10.1061/(ASCE)0733-9364(2006)132: 12(1267) (Pubitemid 44794266)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.12
, pp. 1267-1274
-
-
Zhang, H.1
Tam, C.M.2
Li, H.3
Shi, J.J.4
-
37
-
-
49749097235
-
Particle swarm optimization for construction site unequal-are layout
-
0733-9364 10.1061/(ASCE)0733-9364(2008)134:9(739)
-
Zhang, H., and Wang, J. (2008). Particle swarm optimization for construction site unequal-are layout.. J. Constr. Eng. Manage., 134 (9), 739-748. 0733-9364 10.1061/(ASCE)0733-9364(2008)134:9(739)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.9
, pp. 739-748
-
-
Zhang, H.1
Wang, J.2
|