메뉴 건너뛰기




Volumn 4, Issue 4, 2011, Pages 420-439

Strategic quality management: The role of process ownership, management and improvement

Author keywords

Business excellence; Competitive advantage; Key performance indicators; Process improvement; Process management; Process ownership; Process stakeholders; Quality; Strategic quality management

Indexed keywords


EID: 79959940736     PISSN: 17560047     EISSN: 17560055     Source Type: Journal    
DOI: 10.1504/IJBEX.2011.041060     Document Type: Article
Times cited : (10)

References (42)
  • 1
    • 41349097697 scopus 로고    scopus 로고
    • Long live work measurement
    • from ABI/INFORM Global, Document ID: 145630101, accessed on 14 July
    • Badiru, A. (2008) 'Long live work measurement', Industrial Engineer, Vol. 40, No. 3, p. 24, from ABI/INFORM Global, (Document ID: 145630101), (accessed on 14 July 2010).
    • (2008) Industrial Engineer , vol.40 , Issue.3 , pp. 24
    • Badiru, A.1
  • 2
    • 79960021944 scopus 로고    scopus 로고
    • Lean Six Sigma: Red hot relevance
    • available at, accessed on 16 July 2010
    • Burgess, D. (2010) 'Lean Six Sigma: red hot relevance', Quality, pp. 42-45, available at http://www.qualitymag.com/Articles/Feature-Article/BNP-GUID- 9-5-2006-A-10000000000000834725 (accessed on 16 July 2010).
    • (2010) Quality , pp. 42-45
    • Burgess, D.1
  • 3
    • 78650448448 scopus 로고    scopus 로고
    • Systems thinking in quality management
    • Conti, T. (2010) 'Systems thinking in quality management', The TQM Journal, Vol. 22, No. 4, pp. 352-368.
    • (2010) The TQM Journal , vol.22 , Issue.4 , pp. 352-368
    • Conti, T.1
  • 4
    • 79959963526 scopus 로고    scopus 로고
    • The disconnected company
    • Copacino, W. C. (2003) 'The disconnected company', Logistics Management, Vol. 42, No. 8, p. 88.
    • (2003) Logistics Management , vol.42 , Issue.8 , pp. 88
    • Copacino, W.C.1
  • 5
    • 0003964033 scopus 로고
    • 2nd ed., MIT Center for Advanced Engineering Study, Cambridge, Massachusetts
    • Deming, W. E. (1986) Out of the Crisis, 2nd ed., MIT Center for Advanced Engineering Study, Cambridge, Massachusetts.
    • (1986) Out of the Crisis
    • Deming, W.E.1
  • 6
    • 69249111411 scopus 로고    scopus 로고
    • Finding value in lean
    • Doerman, S. (2009) 'Finding value in lean', Industrial Engineer, Vol. 41, No. 8, pp. 30-33.
    • (2009) Industrial Engineer , vol.41 , Issue.8 , pp. 30-33
    • Doerman, S.1
  • 7
    • 79960010442 scopus 로고    scopus 로고
    • Six Sigma survey: Breaking through the Six Sigma hype
    • available at, accessed on 16 July 2010
    • Dusharme, D. (2009) 'Six Sigma survey: breaking through the Six Sigma hype', Quality Digest, available at http://www.qualitydigest.com/nov01/html/ sixsigmaarticle.html (accessed on 16 July 2010).
    • (2009) Quality Digest
    • Dusharme, D.1
  • 8
    • 72049087280 scopus 로고    scopus 로고
    • European Foundation for Quality Management EFQM, available at, accessed on 14 July 2010
    • European Foundation for Quality Management (EFQM) EFQM Excellence Award, available at http://www.efqm.org (accessed on 14 July 2010).
    • EFQM Excellence Award
  • 9
    • 33746492572 scopus 로고    scopus 로고
    • Building frameworks for Six Sigma success
    • available at, accessed on 16 July 2010
    • Gale, S. F. (2003) 'Building frameworks for Six Sigma success', Workforce, Vol. 82, No. 5, pp. 64-68, available at http://workforce.com (accessed on 16 July 2010).
    • (2003) Workforce , vol.82 , Issue.5 , pp. 64-68
    • Gale, S.F.1
  • 10
    • 79959961263 scopus 로고    scopus 로고
    • Amping up ROI in process improvement
    • available at, accessed on 16 July 2010
    • Giannetto, D. F. (2009) 'Amping up ROI in process improvement', Business Performance Management Magazine, p. 12, available at http://bpmmag.net/mag/ amping-roi-process/ (accessed on 16 July 2010).
    • (2009) Business Performance Management Magazine , pp. 12
    • Giannetto, D.F.1
  • 11
    • 70249135247 scopus 로고    scopus 로고
    • Proposal of a strategy model planning aligned to the balanced scorecard and quality environments
    • Goncalves, H. S. (2009) 'Proposal of a strategy model planning aligned to the balanced scorecard and quality environments', The TQM Journal, Vol. 21, No. 5, pp. 462-472.
    • (2009) The TQM Journal , vol.21 , Issue.5 , pp. 462-472
    • Goncalves, H.S.1
  • 12
    • 77953479945 scopus 로고    scopus 로고
    • Integration of strategic management, process improvement and quantitative measurement for managing the competitiveness of software engineering organizations
    • from ABI/INFORM Global, Document ID: 2053824361, accessed on 7 July 2010
    • Guzmán, J., Mitre, H., Amescua, A. and Velasco, M. (2010) 'Integration of strategic management, process improvement and quantitative measurement for managing the competitiveness of software engineering organizations', Software Quality Journal, Vol. 18, No. 3, pp. 341-359, from ABI/INFORM Global, (Document ID: 2053824361), (accessed on 7 July 2010).
    • (2010) Software Quality Journal , vol.18 , Issue.3 , pp. 341-359
    • Guzmán, J.1    Mitre, H.2    Amescua, A.3    Velasco, M.4
  • 13
    • 34047142082 scopus 로고    scopus 로고
    • The process audit
    • Hammer, M. (2007) 'The process audit', Harvard Business Review, Vol. 85, No. 4, p. 111.
    • (2007) Harvard Business Review , vol.85 , Issue.4 , pp. 111
    • Hammer, M.1
  • 18
    • 79960020775 scopus 로고    scopus 로고
    • Using time series on the production floor
    • Hunter, J. S. (2007) 'Using time series on the production floor', ASQ Six Sigma Forum Magazine, Vol. 6, No. 3, pp. 10-16.
    • (2007) ASQ Six Sigma Forum Magazine , vol.6 , Issue.3 , pp. 10-16
    • Hunter, J.S.1
  • 20
    • 79959983102 scopus 로고    scopus 로고
    • Kaizen as a strategy: Continuous improvement re-evaluates every part of an organization
    • available at, accessed on 16 July 2010
    • Imai, M. (2008) 'Kaizen as a strategy: continuous improvement re-evaluates every part of an organization', Kaizen Forum, available at http://www.kaizen.com/publications.html (accessed on 16 July 2010).
    • (2008) Kaizen Forum
    • Imai, M.1
  • 21
    • 0004047901 scopus 로고
    • 2nd revised ed., Asian Productivity Organization, Tokyo, Japan
    • Ishikawa, K. (1982) Guide to Quality Control, 2nd revised ed., Asian Productivity Organization, Tokyo, Japan.
    • (1982) Guide to Quality Control
    • Ishikawa, K.1
  • 22
    • 0003645081 scopus 로고
    • Free Press, a Division of Simon & Schuster, New York
    • Juran, J. M. (1988) Juran on Planning for Quality, The Free Press, a Division of Simon & Schuster, New York.
    • (1988) Juran on Planning for Quality
    • Juran, J.M.1
  • 24
    • 77649259017 scopus 로고    scopus 로고
    • Process improvement is the key
    • from ABI/INFORM Global, Document ID: 2054947701, accessed on 7 July 2010
    • Keller, R. (2010) 'Process improvement is the key', Industry Week, Vol. 259, No. 6, p. 14, from ABI/INFORM Global, (Document ID: 2054947701), (accessed on 7 July 2010).
    • (2010) Industry Week , vol.259 , Issue.6 , pp. 14
    • Keller, R.1
  • 25
    • 84993047746 scopus 로고    scopus 로고
    • Customers first: Using process improvement to improve service quality and efficiency
    • Larson, C. A. (1998) 'Customers first: using process improvement to improve service quality and efficiency', Reference Services Review, Vol. 25, No. 1, pp. 51-60.
    • (1998) Reference Services Review , vol.25 , Issue.1 , pp. 51-60
    • Larson, C.A.1
  • 27
    • 77955082961 scopus 로고    scopus 로고
    • The missing link: Lean leadership
    • from ABI/INFORM Global, accessed on 16 July 2010
    • Mann, D. (2009) 'The missing link: lean leadership', Frontiers of Health Services Management, Vol. 26, No. 1, pp. 15-26, from ABI/INFORM Global, (accessed on 16 July 2010).
    • (2009) Frontiers of Health Services Management , vol.26 , Issue.1 , pp. 15-26
    • Mann, D.1
  • 28
    • 0141685716 scopus 로고    scopus 로고
    • Why good projects fail anyway
    • Matta, N. E. and Ashkenas, R. N. (2003) 'Why good projects fail anyway', Harvard Business Review, Vol. 81, No. 9, pp. 109-114.
    • (2003) Harvard Business Review , vol.81 , Issue.9 , pp. 109-114
    • Matta, N.E.1    Ashkenas, R.N.2
  • 29
    • 79960029523 scopus 로고    scopus 로고
    • Process ownership - The most overlooked part of quality in the 1980's
    • Now CMA Management Magazine, available at, accessed on 16 July 2010
    • Merril, P. (1997) 'Process ownership - the most overlooked part of quality in the 1980's', CMA Magazine, Vol. 71, No. 3, p. 26, (Now CMA Management Magazine), available at http://www.managementmag.com/ (accessed on 16 July 2010).
    • (1997) CMA Magazine , vol.71 , Issue.3 , pp. 26
    • Merril, P.1
  • 30
    • 66149185130 scopus 로고    scopus 로고
    • Business excellence through a world-class organizational structure: Experience from the Baldrige national quality program
    • Miguel, P. A. C. (2008) 'Business excellence through a world-class organizational structure: experience from the Baldrige national quality program', International Journal of Business Excellence, Vol. 1, Nos. 1/2, pp. 175-192.
    • (2008) International Journal of Business Excellence , vol.1 , Issue.1-2 , pp. 175-192
    • Miguel, P.A.C.1
  • 31
    • 84986098720 scopus 로고    scopus 로고
    • Design and implementation of self-directed process teams
    • from ABI/INFORM Global, Document ID: 117543220, accessed on 16 July 2010
    • Mohsen, A. and Nguyen, T. T. (1999) 'Design and implementation of self-directed process teams', Management Decision, Vol. 37, No. 7, pp. 553-560, from ABI/INFORM Global, (Document ID: 117543220), (accessed on 16 July 2010).
    • (1999) Management Decision , vol.37 , Issue.7 , pp. 553-560
    • Mohsen, A.1    Nguyen, T.T.2
  • 32
    • 79960016531 scopus 로고    scopus 로고
    • Career update: Positive actions aid positive attitudes
    • available at, accessed on 16 July 2010
    • Montague, J. (2000) 'Career update: positive actions aid positive attitudes', Control Engineering, Vol. 47, No. 2, pp. 20-21, available at http://Controleng.com (accessed on 16 July 2010).
    • (2000) Control Engineering , vol.47 , Issue.2 , pp. 20-21
    • Montague, J.1
  • 33
    • 34247593778 scopus 로고    scopus 로고
    • Strategic management of lean
    • Nash, M. and Poling, S. R. (2007) 'Strategic management of lean', Quality, Vol. 46, No. 4, pp. 46-49.
    • (2007) Quality , vol.46 , Issue.4 , pp. 46-49
    • Nash, M.1    Poling, S.R.2
  • 34
    • 0010853644 scopus 로고    scopus 로고
    • National Institute of Standards and Technology NIST, available at, accessed on 12 July 2010
    • National Institute of Standards and Technology (NIST) Baldrige National Quality Award, available at http://www.nist.gov/baldrige (accessed on 12 July 2010).
    • Baldrige National Quality Award
  • 35
    • 79960014116 scopus 로고    scopus 로고
    • The whatchamacallit process
    • available at, accessed on 12 July 2010
    • Nichols, F. (2010) 'The whatchamacallit process', Training Journal, pp. 38-41, available at http://www.trainingjournal.com (accessed on 12 July 2010).
    • (2010) Training Journal , pp. 38-41
    • Nichols, F.1
  • 36
    • 72249096261 scopus 로고    scopus 로고
    • On becoming a process-enabled organization: How to seed a culture of quality in a postacquisition
    • Parker, C. (2010) 'On becoming a process-enabled organization: how to seed a culture of quality in a postacquisition', Global Business and Organizational Excellence, Vol. 29, No. 2, pp. 26-39.
    • (2010) Global Business and Organizational Excellence , vol.29 , Issue.2 , pp. 26-39
    • Parker, C.1
  • 40
    • 79959923717 scopus 로고    scopus 로고
    • Developing a lean performance score
    • Searcy, D. L. (2009) 'Developing a lean performance score', Strategic Finance, Vol. 91, No. 3, pp. 34-39.
    • (2009) Strategic Finance , vol.91 , Issue.3 , pp. 34-39
    • Searcy, D.L.1
  • 42
    • 79960000043 scopus 로고    scopus 로고
    • The quality journey: What I saw, what I heard, what I learned
    • Winter, R. S. (1998) 'The quality journey: what I saw, what I heard, what I learned', Total Quality Management, Vol. 9, Nos. 2/3, pp. 378-386.
    • (1998) Total Quality Management , vol.9 , Issue.2-3 , pp. 378-386
    • Winter, R.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.