메뉴 건너뛰기




Volumn 21, Issue 4, 2011, Pages 397-411

Development of a team workload assessment technique for the main control room of advanced nuclear power plants

Author keywords

Advanced nuclear power plant; Main control room; Team Workload Assessment; Teamwork; Workload

Indexed keywords

ADVANCED NUCLEAR POWER PLANTS; MAIN CONTROL ROOM; TEAM WORKLOAD ASSESSMENT; TEAMWORK; WORKLOAD;

EID: 79957967640     PISSN: 10908471     EISSN: 15206564     Source Type: Journal    
DOI: 10.1002/hfm.20247     Document Type: Article
Times cited : (42)

References (92)
  • 1
    • 0035134117 scopus 로고    scopus 로고
    • Simplified subjective workload assessment technique
    • Ameersing, L., &, Ravindra, S., (2001). Simplified subjective workload assessment technique. Ergonomics, 44 (3), 229-243.
    • (2001) Ergonomics , vol.44 , Issue.3 , pp. 229-243
    • Ameersing, L.1    Ravindra, S.2
  • 5
    • 0002981451 scopus 로고
    • Work teams in industry: A selected review and proposed framework
    • In R. W. Swezy & E. Salas (Eds.), Norwood, NJ: Ablex.
    • Cannon-Bowers, J. A., Oser, R., &, Flanagan, D., (1992). Work teams in industry: A selected review and proposed framework. In, R. W. Swezy, &, E. Salas, (Eds.), Teams: Their training and performance Norwood, NJ: Ablex.
    • (1992) Teams: Their Training and Performance
    • Cannon-Bowers, J.A.1    Oser, R.2    Flanagan, D.3
  • 6
    • 0002912121 scopus 로고
    • Defining team competencies and establishing team training requirements
    • In R. Guzzo & E. Salas (Eds.), (pp.) San Francisco: Jossey-Bass.
    • Cannon-Bowers, J. A., Tannenbaum, S. I., Salas, E., &, Volpe, C. E., (1995). Defining team competencies and establishing team training requirements. In, R. Guzzo, &, E. Salas, (Eds.), Team effectiveness and decision making in organizations (pp. 333-380) San Francisco: Jossey-Bass.
    • (1995) Team Effectiveness and Decision Making in Organizations , pp. 333-380
    • Cannon-Bowers, J.A.1    Tannenbaum, S.I.2    Salas, E.3    Volpe, C.E.4
  • 7
    • 41549093282 scopus 로고    scopus 로고
    • Human factors approach for evaluation and redesign of human-system interfaces of a nuclear power plant simulator
    • DOI 10.1016/j.displa.2007.08.010, PII S0141938207000820
    • Carvalho, P. V. R., Dos Santos, I. L., Gomes, J. O., Borges, M. R. S., &, Guerlain, S., (2008). Human factors approach for evaluation and redesign of human-system interfaces of a nuclear power plant simulator. Displays, 29, 273-284. (Pubitemid 351467724)
    • (2008) Displays , vol.29 , Issue.3 , pp. 273-284
    • Carvalho, P.V.R.1    Dos Santos, I.L.2    Gomes, J.O.3    Borges, M.R.S.4    Guerlain, S.5
  • 8
    • 33746329167 scopus 로고    scopus 로고
    • Measurement of cognitive states in test and evaluation
    • In S. G. Charlton & T. G. O'Brien (Eds.), (pp.) Mahwah, NJ: Lawrence Erlbaum Associates.
    • Charlton, S. G., (2002). Measurement of cognitive states in test and evaluation. In, S. G. Charlton, &, T. G. O'Brien, (Eds.), Handbook of human factors testing and evaluation (pp. 97-126) Mahwah, NJ: Lawrence Erlbaum Associates.
    • (2002) Handbook of Human Factors Testing and Evaluation , pp. 97-126
    • Charlton, S.G.1
  • 9
    • 56249126428 scopus 로고    scopus 로고
    • Project team performance: A study of electronic task and coordination communication
    • Chiocchio, F., (2007). Project team performance: A study of electronic task and coordination communication. Project Management Journal, 38, 97-109.
    • (2007) Project Management Journal , vol.38 , pp. 97-109
    • Chiocchio, F.1
  • 11
    • 0030305484 scopus 로고    scopus 로고
    • From chimneys to cross-functional teams: Developing and validating a diagnostic model
    • Denison, D. R., Hart, S. L., &, Kahn, J. A., (1996). From chimneys to cross-functional teams: Developing and validating a diagnostic model. The Academy of Management Journal, 39, 1005-1026.
    • (1996) The Academy of Management Journal , vol.39 , pp. 1005-1026
    • Denison, D.R.1    Hart, S.L.2    Kahn, J.A.3
  • 14
    • 0032793797 scopus 로고    scopus 로고
    • Adaptive team coordination
    • DOI 10.1518/001872099779591196
    • Entin, E. E., &, Serfaty, D., (1999). Adaptive team coordination. Human Factors, 41, 312-325. (Pubitemid 29330654)
    • (1999) Human Factors , vol.41 , Issue.2 , pp. 312-325
    • Entin, E.E.1    Serfaty, D.2
  • 15
    • 19944400001 scopus 로고    scopus 로고
    • analysis and interpretation methods (No. CARE-integra-TRS-130-02-WP2)
    • Farmer, E., &, Brownson, A., (2003). Review of workload measurement, analysis and interpretation methods (No. CARE-integra-TRS-130-02-WP2).
    • (2003) Review of Workload Measurement
    • Farmer, E.1    Brownson, A.2
  • 16
    • 0034725427 scopus 로고    scopus 로고
    • Emergency response training: Strategies for enhancing real-world performance
    • DOI 10.1016/S0304-3894(00)00180-1, PII S0304389400001801
    • Ford, J. K., &, Schmidt, A. M., (2000). Emergency response training: Strategies for enhancing real-world performance. Journal of Hazardous Materials, 75, 195-215. (Pubitemid 30320948)
    • (2000) Journal of Hazardous Materials , vol.75 , Issue.2-3 , pp. 195-215
    • Ford, J.K.1    Schmidt, A.M.2
  • 17
    • 0000009769 scopus 로고
    • Evaluating structural equation models with unobservable and measurement errors
    • Fornell, C., &, Larcker, D. F., (1981). Evaluating structural equation models with unobservable and measurement errors. Journal of Marketing Research, 18 (1), 39-50.
    • (1981) Journal of Marketing Research , vol.18 , Issue.1 , pp. 39-50
    • Fornell, C.1    Larcker, D.F.2
  • 18
    • 0032677680 scopus 로고    scopus 로고
    • Behavioral simulation of a nuclear power plant operator crew for human-machine system design
    • Furuta, K., Shimada, T., &, Kondo, S., (1999). Behavioral simulation of a nuclear power plant operator crew for human-machine system design. Nuclear Engineering and Design, 188, 97-109.
    • (1999) Nuclear Engineering and Design , vol.188 , pp. 97-109
    • Furuta, K.1    Shimada, T.2    Kondo, S.3
  • 21
    • 0002059668 scopus 로고
    • Current thinking about groups: Setting the stage for new ideas
    • In P. S. Goodman (Ed.), (pp.) San Francisco: Jossey-Bass.
    • Goodman, P. S., Ravlin, E. C., &, Argote, L., (1986). Current thinking about groups: Setting the stage for new ideas. In, P. S. Goodman, (Ed.), Designing effective work groups (pp. 1-33) San Francisco: Jossey-Bass.
    • (1986) Designing Effective Work Groups , pp. 1-33
    • Goodman, P.S.1    Ravlin, E.C.2    Argote, L.3
  • 22
    • 0021687954 scopus 로고
    • On the psychophysics of workload: Why bother with subjective measures?
    • Gopher, D., &, Braune, R., (1984). On the psychophysics of workload: Why bother with subjective measures ? Human Factors, 26, 519-532. (Pubitemid 15167952)
    • (1984) Human Factors , vol.26 , Issue.5 , pp. 519-532
    • Gopher, D.1    Braune, R.2
  • 23
    • 0030979665 scopus 로고    scopus 로고
    • Exploratory factor analysis: Its role in item analysis
    • DOI 10.1207/s15327752jpa6803-5
    • Gorsuch, R. L., (1997). Exploratory factor analysis: Its role in item analysis. Journal of Personality Assessment, 68 (3), 532-560. (Pubitemid 27218206)
    • (1997) Journal of Personality Assessment , vol.68 , Issue.3 , pp. 532-560
    • Gorsuch, R.L.1
  • 24
    • 37249022396 scopus 로고    scopus 로고
    • Development of human performance measures for human factors validation in the advanced MCR of APR-1400
    • DOI 10.1109/TNS.2007.907549
    • Ha, J. S., Seong, P. H., Lee, M. S., &, Hong, J. H., (2007). Development of human performance measures for human factors validation in the advanced MCR of APR-1400. IEEE Transactions on Nuclear Science, 54 (6), 2687-2700. (Pubitemid 350274136)
    • (2007) IEEE Transactions on Nuclear Science , vol.54 , Issue.6 , pp. 2687-2700
    • Ha, J.S.1    Seong, P.H.2    Lee, M.S.3    Hong, J.H.4
  • 26
    • 36448950023 scopus 로고
    • A bibliographic listing of mental workload research
    • In P. A. Hancock & N. Meshkati (Eds.), New York: North-Holland.
    • Hancock, P. A., Mihaly, T., Rahimi, M., &, Meshkati, N., (1988). A bibliographic listing of mental workload research. In, P. A. Hancock, &, N. Meshkati, (Eds.), Human mental workload New York: North-Holland.
    • (1988) Human Mental Workload
    • Hancock, P.A.1    Mihaly, T.2    Rahimi, M.3    Meshkati, N.4
  • 30
    • 58349092103 scopus 로고    scopus 로고
    • Experimental studies of computerized procedures and team size in nuclear power plant operations
    • Huang, F. H., &, Hwang, S. L., (2009). Experimental studies of computerized procedures and team size in nuclear power plant operations. Nuclear Engineering and Design, 239, 373-380.
    • (2009) Nuclear Engineering and Design , vol.239 , pp. 373-380
    • Huang, F.H.1    Hwang, S.L.2
  • 33
  • 35
    • 67349274406 scopus 로고    scopus 로고
    • The implementation of a human factors engineering checklist for humanâsystem interfaces upgrade in nuclear power plants
    • Jou, Y. T., Lin, C. J., Yenn, T. C., Yang, C. W., Yang, L. C., &, Tsai, R. C., (2008). The implementation of a human factors engineering checklist for humanâsystem interfaces upgrade in nuclear power plants. Safety Science, 47, 1016-1025.
    • (2008) Safety Science , vol.47 , pp. 1016-1025
    • Jou, Y.T.1    Lin, C.J.2    Yenn, T.C.3    Yang, C.W.4    Yang, L.C.5    Tsai, R.C.6
  • 36
    • 0000316844 scopus 로고
    • A comparison of one-, two-, and three-man work units under various conditions of workload
    • Kidd, J. S., (1961). A comparison of one-, two-, and three-man work units under various conditions of workload. Journal of Applied Psychology, 45, 195-200.
    • (1961) Journal of Applied Psychology , vol.45 , pp. 195-200
    • Kidd, J.S.1
  • 37
    • 33747131033 scopus 로고    scopus 로고
    • 2): Dynamic model of team effectiveness evaluation under the dynamic and tactical environment at nuclear installation
    • DOI 10.1016/j.ssci.2005.10.002, PII S0925753505001189
    • Kim, S. C., Chang, S. H., &, Heo, G., (2006). Team crystallization (SIO2): Dynamic model of team effectiveness evaluation under the dynamic and tactical environment at nuclear installation. Safety Science, 44, 701-721. (Pubitemid 44224007)
    • (2006) Safety Science , vol.44 , Issue.8 , pp. 701-721
    • Kim, S.C.1    Chang, S.H.2    Heo, G.3
  • 39
    • 0002133343 scopus 로고
    • Staffing for effective group decision-making: Key issues in matching people and teams
    • In R. A. Guzzo & E. Salas (Eds.), (pp.) San Francisco: Jossey-Bass.
    • Klimoski, R., &, Jones, R. G., (1995). Staffing for effective group decision-making: Key issues in matching people and teams. In, R. A. Guzzo, &, E. Salas, (Eds.), Team effectiveness and decision making in organizations (pp. 291-332) San Francisco: Jossey-Bass.
    • (1995) Team Effectiveness and Decision Making in Organizations , pp. 291-332
    • Klimoski, R.1    Jones, R.G.2
  • 40
    • 0033237283 scopus 로고    scopus 로고
    • Stress and team performance: Principles and challenges for intelligent decision aids
    • Kontogiannis, T., &, Kossiavelou, Z., (1999). Stress and team performance: Principles and challenges for intelligent decision aids. Safety Science, 33, 103-128.
    • (1999) Safety Science , vol.33 , pp. 103-128
    • Kontogiannis, T.1    Kossiavelou, Z.2
  • 44
    • 33645730623 scopus 로고    scopus 로고
    • Communication overhead: The hidden cost of team cognition
    • In E. Salas & S. M. Fiore (Eds.), (pp.) Washington, DC: American Psychological Association.
    • MacMillan, J., Entin, E. E., &, Serfaty, D., (2004). Communication overhead: The hidden cost of team cognition. In, E. Salas, &, S. M. Fiore, (Eds.), Team cognition: Understanding the factors that drive process and performance (pp. 61-82) Washington, DC: American Psychological Association.
    • (2004) Team Cognition: Understanding the Factors That Drive Process and Performance , pp. 61-82
    • MacMillan, J.1    Entin, E.E.2    Serfaty, D.3
  • 46
    • 0034758495 scopus 로고    scopus 로고
    • Human and organizational factors in offshore safety
    • DOI 10.1080/026783701102678370110066616
    • Mearns, K., Flin, R., Gordon, R., &, Fleming, M., (2001). Human and organisational factors in offshore safety. Work and Stress, 15 (2), 144-160. (Pubitemid 33021845)
    • (2001) Work and Stress , vol.15 , Issue.2 , pp. 144-160
    • Mearns, K.1    Flin, R.2    Gordon, R.3    Fleming, M.4
  • 47
    • 34548405056 scopus 로고    scopus 로고
    • A neural network based operation guidance system for procedure presentation and operation validation in nuclear power plants
    • DOI 10.1016/j.anucene.2007.04.008, PII S0306454907000965
    • Mo, K., Lee, S. J., &, Seong, P. H., (2007). A neural network based operation guidance system for procedure presentation and operation validation in nuclear power plants. Annals of Nuclear Energy, 34, 813-823. (Pubitemid 47368866)
    • (2007) Annals of Nuclear Energy , vol.34 , Issue.10 , pp. 813-823
    • Mo, K.1    Lee, S.J.2    Seong, P.H.3
  • 51
    • 0033931435 scopus 로고    scopus 로고
    • There is more to monitoring a nuclear power plant than meets the eye
    • Mumaw, R. J., Roth, E. M., Vicente, K. J., &, Burns, C. M., (2000). There is more to monitoring a nuclear power plant than meets the eye. Human Factors, 42 (1), 36-55. (Pubitemid 30456527)
    • (2000) Human Factors , vol.42 , Issue.1 , pp. 36-55
    • Mumaw, R.J.1    Roth, E.M.2    Vicente, K.J.3    Burns, C.M.4
  • 52
    • 28444464471 scopus 로고    scopus 로고
    • Human factors in process control systems: The design of human-machine interfaces
    • DOI 10.1016/j.ssci.2005.09.003, PII S0925753505000949, Safety and Design
    • Nachreiner, F., Nickel, P., &, Meyer, I., (2006). Human factors in process control systems: The design of human-machine interfaces. Safety Science, 44, 5-26. (Pubitemid 41736034)
    • (2006) Safety Science , vol.44 , Issue.1 , pp. 5-26
    • Nachreiner, F.1    Nickel, P.2    Meyer, I.3
  • 53
    • 79957936829 scopus 로고
    • On the economy of the human processing system
    • Navon, D., &, Gopher, D., (1979). On the economy of the human processing system. Psychological Review, 91, 216-234.
    • (1979) Psychological Review , vol.91 , pp. 216-234
    • Navon, D.1    Gopher, D.2
  • 54
    • 0002014554 scopus 로고
    • On data-limited and resource-limited processes
    • Norman, D. A., &, Bobrow, D. G., (1975). On data-limited and resource-limited processes. Cognitive Psychology, 7, 44-64.
    • (1975) Cognitive Psychology , vol.7 , pp. 44-64
    • Norman, D.A.1    Bobrow, D.G.2
  • 55
    • 23044468708 scopus 로고    scopus 로고
    • Performance-based usability evaluation of a safety information and alarm system
    • DOI 10.1016/j.ijhcs.2005.03.004, PII S107158190500039X
    • Norros, L., &, Nuutinen, M., (2005). Performance-based usability evaluation of a safety information and alarm system. International Journal of Human-Computer Studies, 63, 328-361. (Pubitemid 41066446)
    • (2005) International Journal of Human Computer Studies , vol.63 , Issue.3 , pp. 328-361
    • Norros, L.1    Nuutinen, M.2
  • 57
    • 0026114647 scopus 로고
    • Psychometric properties of subjective workload measurement techniques: Implications for their use in the assessment of perceived mental workload
    • Nygren, T. E., (1991). Psychometric properties of subjective workload measurement techniques: Implications for their use in the assessment of perceived mental workload. Human Factors, 33 (1), 17-33.
    • (1991) Human Factors , vol.33 , Issue.1 , pp. 17-33
    • Nygren, T.E.1
  • 58
    • 0035255347 scopus 로고    scopus 로고
    • Site managers and safety leadership in the offshore oil and gas industry
    • O'Dea, A., &, Flin, R., (2001). Site managers and safety leadership in the offshore oil and gas industry. Safety Science, 37, 39-57.
    • (2001) Safety Science , vol.37 , pp. 39-57
    • O'Dea, A.1    Flin, R.2
  • 59
    • 0002106349 scopus 로고
    • Workload assessment methodology
    • In K. Boff, L. Kaufman, & J. P. Thomas (Eds.), (pp.) New York: Wiley-Interscience.
    • O'Donnell, R. D., &, Eggemeier, F. T., (1986). Workload assessment methodology. In, K. Boff, L. Kaufman, &, J. P. Thomas, (Eds.), Handbook of perception and human performance (pp. 42.41-42.49) New York: Wiley-Interscience.
    • (1986) Handbook of Perception and Human Performance , pp. 4241-4249
    • O'Donnell, R.D.1    Eggemeier, F.T.2
  • 60
    • 0026902817 scopus 로고
    • Advanced control rooms and crew performance issues: Implications for human reliability
    • O'Hara, J. M., &, Hall, M. W., (1992). Advanced control rooms and crew performance issues: Implications for human reliability. IEEE Transactions on Nuclear Science, 39, 919-923.
    • (1992) IEEE Transactions on Nuclear Science , vol.39 , pp. 919-923
    • O'Hara, J.M.1    Hall, M.W.2
  • 62
    • 0002437140 scopus 로고
    • Team decision making in complex environments
    • In G. A. Klein, J. Orasanu, & R. Calderwood (Eds.), (pp.) Norwood, NJ: Ablex.
    • Orasanu, J., &, Salas, E., (1993). Team decision making in complex environments. In, G. A. Klein, J. Orasanu, &, R. Calderwood, (Eds.), Decision making in action: Models and methods (pp. 327-345) Norwood, NJ: Ablex.
    • (1993) Decision Making in Action: Models and Methods , pp. 327-345
    • Orasanu, J.1    Salas, E.2
  • 64
    • 0347412038 scopus 로고    scopus 로고
    • Analysis of operators' performance under emergencies using a training simulator of the nuclear power plant
    • Park, J. K., Jung, W. D., Ha, J. J., &, Shin, Y. H., (2004). Analysis of operators' performance under emergencies using a training simulator of the nuclear power plant. Reliability Engineering and System Safety, 83, 179-186.
    • (2004) Reliability Engineering and System Safety , vol.83 , pp. 179-186
    • Park, J.K.1    Jung, W.D.2    Ha, J.J.3    Shin, Y.H.4
  • 65
    • 0242333985 scopus 로고    scopus 로고
    • Examining a curvilinear relationship between communication frequency and team performance in cross-functional project teams
    • Patrashkova-Volzdoska, R., McComb, S. A., Green, S. G., &, Compton, W. D., (2003). Examining a curvilinear relationship between communication frequency and team performance in cross-functional project teams. IEEE Transactions on Engineering Management, 50 (3), 262-269.
    • (2003) IEEE Transactions on Engineering Management , vol.50 , Issue.3 , pp. 262-269
    • Patrashkova-Volzdoska, R.1    McComb, S.A.2    Green, S.G.3    Compton, W.D.4
  • 66
    • 0011997327 scopus 로고
    • Determinants of cross-functional cooperation in the project implementation process
    • Pinto, M. B., &, Pinto, J. K., (1991). Determinants of cross-functional cooperation in the project implementation process. Project Management Journal, 22 (2), 13-21.
    • (1991) Project Management Journal , vol.22 , Issue.2 , pp. 13-21
    • Pinto, M.B.1    Pinto, J.K.2
  • 69
    • 0001940135 scopus 로고    scopus 로고
    • Factors that influence the social dimension of alignment between business and information technology objectives
    • Reich, B. H., &, Benbasat, I., (2000). Factors that influence the social dimension of alignment between business and information technology objectives. MIS Quarterly, 24 (1), 81-103.
    • (2000) MIS Quarterly , vol.24 , Issue.1 , pp. 81-103
    • Reich, B.H.1    Benbasat, I.2
  • 70
    • 21844511022 scopus 로고
    • Managing international interdependence: CEO characteristics in a resource-based framework
    • Roth, K., (1995). Managing international interdependence: CEO characteristics in a resource-based framework. Academy of Management Journal, 38 (1), 200-231.
    • (1995) Academy of Management Journal , vol.38 , Issue.1 , pp. 200-231
    • Roth, K.1
  • 71
    • 0842346759 scopus 로고    scopus 로고
    • Evaluation of Subjective Mental Workload: A Comparison of SWAT, NASA-TLX, and Workload Profile Methods
    • DOI 10.1111/j.1464-0597.2004.00161.x
    • Rubio, S., Diaz, E., Martin, J., &, Puente, J. M., (2004). Evaluation of subjective mental workload: A comparison of SWAT, NASA-TLX, and Workload Profile methods. Applied Psychology: An International Review, 53 (1), 61-86. (Pubitemid 38169984)
    • (2004) Applied Psychology , vol.53 , Issue.1 , pp. 61-86
    • Rubio, S.1    Diaz, E.2    Martin, J.3    Puente, J.M.4
  • 72
    • 0002097043 scopus 로고
    • Toward an understanding of team performance and training
    • In R. W. Swezey & E. Salas (Eds.), (pp.) Norwood, NJ: Ablex.
    • Salas, E., Dickinson, T. L., Converse, S. A., &, Tannenbaum, S. I., (1992). Toward an understanding of team performance and training. In, R. W. Swezey, &, E. Salas, (Eds.), Teams: Their training and performance (pp. 3-29) Norwood, NJ: Ablex.
    • (1992) Teams: Their Training and Performance , pp. 3-29
    • Salas, E.1    Dickinson, T.L.2    Converse, S.A.3    Tannenbaum, S.I.4
  • 75
    • 0033841701 scopus 로고    scopus 로고
    • Team performance in process control: Influences of interface design and staffing levels
    • Sebok, A., (2000). Team performance in process control: Influences of interface design and staffing levels. Ergonomics, 43 (8), 1210-1236. (Pubitemid 30657657)
    • (2000) Ergonomics , vol.43 , Issue.8 , pp. 1210-1236
    • Sebok, A.1
  • 79
    • 0013932691 scopus 로고
    • Models for inferring relationships between group size and potential group productivity
    • Steiner, I. D., (1966). Models for inferring relationships between group size and potential group productivity. Behavioral Science, 11, 273-283.
    • (1966) Behavioral Science , vol.11 , pp. 273-283
    • Steiner, I.D.1
  • 81
    • 0032913992 scopus 로고    scopus 로고
    • Planning, shared mental models, and coordinated performance: An empirical link is established
    • DOI 10.1518/001872099779577273
    • Stout, R. J., Cannon-Bowers, J. A., Salas, E., &, Milanovich, D. M., (1999). Planning, shared mental models, and coordinated performance: An empirical link is established. Human Factors, 41 (1), 61-71. (Pubitemid 29228327)
    • (1999) Human Factors , vol.41 , Issue.1 , pp. 61-71
    • Stout, R.J.1    Cannon-Bowers, J.A.2    Salas, E.3    Milanovich, D.M.4
  • 84
    • 0008171802 scopus 로고
    • Workload, team structure, and communication in team performance
    • Urban, J. M., Bowers, C. A., Monday, S. D., &, Morgan Jr., B. B., (1995). Workload, team structure, and communication in team performance. Military Psychology, 7, 123-139.
    • (1995) Military Psychology , vol.7 , pp. 123-139
    • Urban, J.M.1    Bowers, C.A.2    Monday, S.D.3    Morgan, Jr.B.B.4
  • 85
    • 0030175211 scopus 로고    scopus 로고
    • Effects of workload and structure on team processes and performance: Implications for complex team decision making
    • DOI 10.1518/001872096779048101
    • Urban, J. M., Weaver, J. L., Bowers, C. A., &, Rhodenizer, L., (1996). Effects of workload and structure on team processes and performance: Implications for complex team decision making. Human Factors, 38, 300-310. (Pubitemid 26362371)
    • (1996) Human Factors , vol.38 , Issue.2 , pp. 300-310
    • Urban, J.M.1    Weaver, J.L.2    Bowers, C.A.3    Rhodenizer, L.4
  • 86
    • 0030042177 scopus 로고    scopus 로고
    • Physiological indices of workload in a simulated flight task
    • DOI 10.1016/0301-0511(95)05165-1
    • Veltman, J. A., &, Gaillard, A. W. K., (1996). Physiological indices of workload in a simulated flight task. Biological Psychology, 42, 323-342. (Pubitemid 26068935)
    • (1996) Biological Psychology , vol.42 , Issue.3 , pp. 323-342
    • Veltman, J.A.1    Gaillard, A.W.K.2
  • 88
    • 0035384434 scopus 로고    scopus 로고
    • How do operators monitor a complex, dynamic work domain? the impact on control room technology
    • Vicente, K. J., Roth, E., &, Mumaw, R. J., (2001). How do operators monitor a complex, dynamic work domain? The impact on control room technology. International Journal of Human-Computer Studies, 54, 831-856.
    • (2001) International Journal of Human-Computer Studies , vol.54 , pp. 831-856
    • Vicente, K.J.1    Roth, E.2    Mumaw, R.J.3
  • 89
    • 0030111207 scopus 로고    scopus 로고
    • The impact of cross-training on team functioning: An empirical investigation
    • DOI 10.1518/001872096778940741
    • Volpe, C. E., Cannon-Bowers, J. A., Salas, E., &, Spector, P. E., (1996). The impact of cross-training on team functioning: An empirical investigation. Human Factors, 38, 87-100. (Pubitemid 26185319)
    • (1996) Human Factors , vol.38 , Issue.1 , pp. 87-100
    • Volpe, C.E.1    Cannon-Bowers, J.A.2    Salas, E.3    Spector, P.E.4
  • 92
    • 0033863652 scopus 로고    scopus 로고
    • Review and reappraisal of modeling and predicting mental workload in single-and multi-task environments
    • Xie, B., &, Salvendy, G., (2000). Review and reappraisal of modeling and predicting mental workload in single-and multi-task environments. Work and Stress, 14 (1), 74-99.
    • (2000) Work and Stress , vol.14 , Issue.1 , pp. 74-99
    • Xie, B.1    Salvendy, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.