메뉴 건너뛰기




Volumn 131, Issue 1, 2011, Pages 399-406

Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept

Author keywords

Order release; Production planning; Queueing theory; Workload control

Indexed keywords

BALANCE EQUATIONS; CLEARING FUNCTIONS; FUNCTIONAL RELATIONSHIP; MATERIAL FLOW; MAXIMUM OUTPUT; ORDER RELEASE; ORDER RELEASE PLANNING; PRODUCTION PLANNING; PRODUCTION PLANNING AND CONTROL; PRODUCTION UNITS; RESEARCH DIRECTIONS; STOCHASTIC PROPERTIES; WORKLOAD CONTROL;

EID: 79952591769     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2009.09.003     Document Type: Article
Times cited : (31)

References (34)
  • 1
    • 0002982029 scopus 로고
    • Transient behavior of the M/M/1 queue: Starting at the origin
    • J. Abate, and W. Whitt Transient behavior of the M/M/1 queue: starting at the origin Queueing Systems: Theory and Applications 2 1 1987 41 65
    • (1987) Queueing Systems: Theory and Applications , vol.2 , Issue.1 , pp. 41-65
    • Abate, J.1    Whitt, W.2
  • 2
    • 0000233862 scopus 로고
    • Transient behavior of regulated Brownian motion, II: Non-zero initial conditions
    • J. Abate, and W. Whitt Transient behavior of regulated Brownian motion, II: non-zero initial conditions Advances in Applied Probability 19 3 1987 599 631
    • (1987) Advances in Applied Probability , vol.19 , Issue.3 , pp. 599-631
    • Abate, J.1    Whitt, W.2
  • 3
    • 0001191115 scopus 로고
    • Transient behavior of the M/M/1 queue via Laplace transforms
    • J. Abate, and W. Whitt Transient behavior of the M/M/1 queue via Laplace transforms Advances in Applied Probability 20 1 1988 145 178
    • (1988) Advances in Applied Probability , vol.20 , Issue.1 , pp. 145-178
    • Abate, J.1    Whitt, W.2
  • 4
    • 0028460939 scopus 로고
    • Transient behavior of the M/G/1 workload process
    • J. Abate, and W. Whitt Transient behavior of the M/G/1 workload process Operations Research 42 4 1994 750 764
    • (1994) Operations Research , vol.42 , Issue.4 , pp. 750-764
    • Abate, J.1    Whitt, W.2
  • 6
    • 33144460387 scopus 로고    scopus 로고
    • Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
    • DOI 10.1109/TSM.2005.863214
    • J.M. Asmundsson, R.L. Rardin, and R. Uzsoy Tractable nonlinear production planning models for semiconductor wafer fabrication facilities IEEE Transactions on Semiconductor Manufacturing 19 2006 95 111 (Pubitemid 43269770)
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.1 , pp. 95-111
    • Asmundsson, J.1    Rardin, R.L.2    Uzsoy, R.3
  • 9
    • 0031078124 scopus 로고    scopus 로고
    • Order review and release strategies in a job shop environment: A review and a classification
    • D. Bergamaschi, R. Cigolini, M. Perona, and A. Portoli Order review and release strategies in a job shop environment: a review and a classification International Journal of Production Research 35 1997 399 420 (Pubitemid 127564055)
    • (1997) International Journal of Production Research , vol.35 , Issue.2 , pp. 399-420
    • Bergamaschi, D.1    Cigolini, R.2    Perona, M.3    Portioli, A.4
  • 12
    • 0038183358 scopus 로고    scopus 로고
    • From fluid relaxations to practical algorithms for job shop scheduling: The makespan objective
    • DOI 10.1007/s101070100272
    • D. Bertsimas, and J. Sethuraman From fluid relaxations to practical algorithms for job shop scheduling: the makespan objective Mathematical Programming, Series A 92 2002 61 102 (Pubitemid 44769741)
    • (2002) Mathematical Programming, Series B , vol.92 , Issue.1 , pp. 61-102
    • Bertsimas, D.1    Sethuraman, J.2
  • 15
    • 0022741221 scopus 로고
    • A tactical planning model for a job shop
    • S.C. Graves A tactical planning model for a job shop Operations Research 34 4 1986 522 533
    • (1986) Operations Research , vol.34 , Issue.4 , pp. 522-533
    • Graves, S.C.1
  • 16
    • 0000204502 scopus 로고
    • A general framework for modeling production
    • S.T. Hackman, and R.C. Leachman A general framework for modeling production Management Science 35 1989 478 495
    • (1989) Management Science , vol.35 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 17
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • PII S0894650796032678
    • Y.F. Hung, and R.C. Leachman A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations IEEE Transactions on Semiconductor Manufacturing 9 2 1996 257 269 (Pubitemid 126774120)
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.-F.1    Leachman, R.C.2
  • 19
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-in-progress (WIP) and leadtimes
    • U.S. Karmarkar Capacity loading and release planning with work-in-progress (WIP) and leadtimes Journal of Manufacturing and Operations Management 2 1989 105 123
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , pp. 105-123
    • Karmarkar, U.S.1
  • 23
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate order release planning for time-varying demand
    • DOI 10.1080/00207540110090939
    • H. Missbauer Aggregate order release planning for time-varying demand International Journal of Production Research 40 3 2002 699 718 (Pubitemid 34593822)
    • (2002) International Journal of Production Research , vol.40 , Issue.3 , pp. 699-718
    • Missbauer, H.1
  • 25
    • 63149103431 scopus 로고    scopus 로고
    • Models of the transient behaviour of production units to optimize the aggregate material flow
    • H. Missbauer Models of the transient behaviour of production units to optimize the aggregate material flow International Journal of Production Economics 118 2 2009 387 397
    • (2009) International Journal of Production Economics , vol.118 , Issue.2 , pp. 387-397
    • Missbauer, H.1
  • 30
    • 33748750890 scopus 로고    scopus 로고
    • Aggregate load-oriented workload control: A review and a re-classification of a key approach
    • DOI 10.1016/j.ijpe.2005.05.022, PII S092552730500215X
    • M. Stevenson, and L.C. Hendry Aggregate load-oriented workload control: a review and a re-classification of a key approach International Journal of Production Economics 104 2 2006 676 693 (Pubitemid 44403076)
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 676-693
    • Stevenson, M.1    Hendry, L.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.