메뉴 건너뛰기




Volumn 2, Issue 2, 2009, Pages 217-237

Formulation of robust strategies for project manufacturing business

Author keywords

Production process; Project planning; Strategic manufacturing

Indexed keywords


EID: 79952370304     PISSN: 17538378     EISSN: 17538386     Source Type: Journal    
DOI: 10.1108/17538370910949275     Document Type: Article
Times cited : (24)

References (40)
  • 1
    • 0027659459 scopus 로고
    • A multiproject perspective of single-project dynamics
    • (), “” , -
    • Abdel-Hamid, T.K. (1993), “A multiproject perspective of single-project dynamics”, Journal of Systems and Software, Vol. 22 No. 3, pp. 151-65.
    • (1993) Journal of Systems and Software , vol.22 , Issue.3 , pp. 151-165
    • Abdel-Hamid, T.K.1
  • 2
    • 84976842520 scopus 로고
    • Lessons learned from modeling the dynamics of software development
    • (), “” , -
    • Abdel-Hamid, T.K. and Madnick, S.E. (1989), “Lessons learned from modeling the dynamics of software development”, Communications of the ACM, Vol. 32 No. 12, pp. 1426-38.
    • (1989) Communications of the ACM , vol.32 , Issue.12 , pp. 1426-1438
    • Abdel-Hamid, T.K.1    Madnick, S.E.2
  • 7
    • 0032143327 scopus 로고    scopus 로고
    • The role of system dynamics in understanding the impact of changes to key project personnel on design production within construction projects
    • (), “” , -
    • Chapman, R.J. (1998), “The role of system dynamics in understanding the impact of changes to key project personnel on design production within construction projects”, International Journal of Project Management, Vol. 16 No. 4, pp. 235-47.
    • (1998) International Journal of Project Management , vol.16 , Issue.4 , pp. 235-247
    • Chapman, R.J.1
  • 10
    • 0002132859 scopus 로고    scopus 로고
    • Dynamic modeling of product development processes
    • (), “” , -
    • Ford, D.N. and Sterman, J.D. (1998), “Dynamic modeling of product development processes”, System Dynamics Review, Vol. 14 No. 1, pp. 31-68.
    • (1998) System Dynamics Review , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.N.1    Sterman, J.D.2
  • 11
    • 0000618550 scopus 로고
    • Link manufacturing processes and product life-cycles
    • (), “” , -
    • Hayes, R.H. and Wheelwright, S.C. (1979), “Link manufacturing processes and product life-cycles”, Harvard Business Review, Vol. 57 No. 1, pp. 133-40.
    • (1979) Harvard Business Review , vol.57 , Issue.1 , pp. 133-140
    • Hayes, R.H.1    Wheelwright, S.C.2
  • 14
    • 3543085679 scopus 로고    scopus 로고
    • Multi-project management in software engineering using simulation modelling
    • (), “”
    • Lee, B. and Miller, J. (2004), “Multi-project management in software engineering using simulation modelling”, Software Quality Journal, Vol. 12 No. 1.
    • (2004) Software Quality Journal , vol.12 , Issue.1
    • Lee, B.1    Miller, J.2
  • 15
    • 84980124930 scopus 로고
    • Action research and minority problems
    • (), “” , -
    • Lewin, K. (1946), “Action research and minority problems”, Journal of Social Issues, Vol. 2, pp. 34-6.
    • (1946) Journal of Social Issues , vol.2 , pp. 34-36
    • Lewin, K.1
  • 16
    • 0034075778 scopus 로고    scopus 로고
    • System dynamics for market forecasting and structural analysis
    • (), “” , -
    • Lyneis, J. (2000), “System dynamics for market forecasting and structural analysis”, System Dynamics Review, Vol. 16 No. 1, pp. 3-25.
    • (2000) System Dynamics Review , vol.16 , Issue.1 , pp. 3-25
    • Lyneis, J.1
  • 17
    • 36349001859 scopus 로고    scopus 로고
    • System dynamics applied to project management: a survey, assessment, and directions for future research
    • (), “” , -
    • Lyneis, J. and Ford, D.N. (2007), “System dynamics applied to project management: a survey, assessment, and directions for future research”, System Dynamics Review, Vol. 23 No. 2, pp. 157-89.
    • (2007) System Dynamics Review , vol.23 , Issue.2 , pp. 157-189
    • Lyneis, J.1    Ford, D.N.2
  • 18
    • 84948212052 scopus 로고
    • Lessons learned from organizational systematics and biological taxonomy
    • (), “” , -
    • McCarthy, I. (1995), “Lessons learned from organizational systematics and biological taxonomy”, Integrated Manufacturing Systems, Vol. 6 No. 6, pp. 37-48.
    • (1995) Integrated Manufacturing Systems , vol.6 , Issue.6 , pp. 37-48
    • McCarthy, I.1
  • 21
    • 0033878684 scopus 로고    scopus 로고
    • Vision and quality improvement
    • (), “” , -
    • Panayiotou, P. and Ridgeway, K. (2000), “Vision and quality improvement”, Manufacturing Engineer, Vol. 79 No. 2, pp. 83-5.
    • (2000) Manufacturing Engineer , vol.79 , Issue.2 , pp. 83-85
    • Panayiotou, P.1    Ridgeway, K.2
  • 22
    • 0142025004 scopus 로고    scopus 로고
    • Dynamic change management for construction: introducing the change cycle into model-based project management
    • (), “” , -
    • Park, M. and Peña-Mora, F. (2003), “Dynamic change management for construction: introducing the change cycle into model-based project management”, System Dynamics Review, Vol. 19 No. 3, pp. 213-42.
    • (2003) System Dynamics Review , vol.19 , Issue.3 , pp. 213-242
    • Park, M.1    Peña-Mora, F.2
  • 24
    • 84986059467 scopus 로고    scopus 로고
    • The need for a new product development framework for engineer-to-order products
    • (), “” , -
    • Rahim, A.R.A. and Baksh, M.S.N. (2003), “The need for a new product development framework for engineer-to-order products”, European Journal of Innovation Management, Vol. 6 No. 3, pp. 182-96.
    • (2003) European Journal of Innovation Management , vol.6 , Issue.3 , pp. 182-196
    • Rahim, A.R.A.1    Baksh, M.S.N.2
  • 25
    • 0041010783 scopus 로고    scopus 로고
    • A dynamic model of resource allocation in multi-project research and development systems
    • (), “” , -
    • Repenning, N.P. (2000), “A dynamic model of resource allocation in multi-project research and development systems”, System Dynamics Review, Vol. 16 No. 3, pp. 173-212.
    • (2000) System Dynamics Review , vol.16 , Issue.3 , pp. 173-212
    • Repenning, N.P.1
  • 28
    • 0031365006 scopus 로고    scopus 로고
    • Production planning and control in a virtual one-of-a-kind production company
    • (), “” , -
    • Tu, Y. (1997), “Production planning and control in a virtual one-of-a-kind production company”, Computers in Industry, Vol. 34 No. 3, pp. 271-83.
    • (1997) Computers in Industry , vol.34 , Issue.3 , pp. 271-283
    • Tu, Y.1
  • 32
    • 0037411034 scopus 로고    scopus 로고
    • Structuring a delay and disruption claim: an application of cause-mapping and system dynamics
    • (), “” , -
    • Williams, T., Ackermann, F. and Eden, C. (2003), “Structuring a delay and disruption claim: an application of cause-mapping and system dynamics”, European Journal of Operational Research, Vol. 148, pp. 192-204.
    • (2003) European Journal of Operational Research , vol.148 , pp. 192-204
    • Williams, T.1    Ackermann, F.2    Eden, C.3
  • 34
    • 84958590006 scopus 로고    scopus 로고
    • Out of this world
    • (), “” August/September
    • Williamson, M. (2003), “Out of this world”, Engineering Management, August/September.
    • (2003) Engineering Management
    • Williamson, M.1
  • 36
    • 83755202997 scopus 로고
    • Naval ship production: a claim settled and framework built
    • (), “” , -
    • Cooper, K.G. (1980), “Naval ship production: a claim settled and framework built”, Interfaces, Vol. 10 No. 6, pp. 20-31.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 20-31
    • Cooper, K.G.1
  • 37
    • 12444315100 scopus 로고    scopus 로고
    • Analysing project cost overruns: comparing the ‘measured mile’ analysis and system dynamics modelling
    • (), “” , -
    • Eden, C., Williams, T. and Ackermann, F. (2005), “Analysing project cost overruns: comparing the ‘measured mile’ analysis and system dynamics modelling”, International Journal of Project Management, Vol. 23 No. 2, pp. 135-9.
    • (2005) International Journal of Project Management , vol.23 , Issue.2 , pp. 135-139
    • Eden, C.1    Williams, T.2    Ackermann, F.3
  • 38
    • 0001446357 scopus 로고    scopus 로고
    • Strategic management of complex projects: a case study using system dynamics
    • (), “” , -
    • Lyneis, J.M., Cooper, K.G. and Els, S.A. (2001), “Strategic management of complex projects: a case study using system dynamics”, System Dynamics Review, Vol. 17 No. 3, pp. 237-60.
    • (2001) System Dynamics Review , vol.17 , Issue.3 , pp. 237-260
    • Lyneis, J.M.1    Cooper, K.G.2    Els, S.A.3
  • 40
    • 0003391719 scopus 로고
    • (),Sloan School of Management, Massachusetts Institute of Technology, Cambridge, MA:
    • Sterman, J.D. (1992), System Dynamics Modelling for Project Management, Sloan School of Management, Massachusetts Institute of Technology, Cambridge, MA.
    • (1992) System Dynamics Modelling for Project Management
    • Sterman, J.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.