메뉴 건너뛰기




Volumn 52, Issue 9-12, 2011, Pages 1053-1066

A new approach to solve a mixed-model assembly line with a bypass subline sequencing problem

Author keywords

Bypass subline; Hybrid genetic algorithm; Mixed model assembly line; Sequencing

Indexed keywords

ASSEMBLY OPERATIONS; ASSEMBLY TIME; BYPASS SUBLINE; EVENT-BASED; EXHAUSTIVE ENUMERATION; HYBRID ALGORITHMS; HYBRID GENETIC ALGORITHMS; MANUFACTURING PLANT; MIXED MODEL ASSEMBLY LINE; MIXED-MODEL ASSEMBLY LINES; NEW APPROACHES; OPTIMAL SOLUTIONS; PRODUCT TYPES; PRODUCTION EFFICIENCY; SEQUENCING; SEQUENCING PROBLEMS; TEST PROBLEM; USAGE RATE;

EID: 79951957348     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-2797-x     Document Type: Article
Times cited : (13)

References (33)
  • 1
    • 13444262276 scopus 로고    scopus 로고
    • A beam search heuristic method for mixed-model scheduling with setups
    • DOI 10.1016/j.ijpe.2003.12.010, PII S0925527304002166
    • PR McMullen P Tarasewich 2005 A beam search heuristic method for mixed-model scheduling with setups Int J Prod Econ 96 273 283 10.1016/j.ijpe.2003.12.010 (Pubitemid 40200705)
    • (2005) International Journal of Production Economics , vol.96 , Issue.2 , pp. 273-283
    • McMullen, P.R.1    Tarasewich, P.2
  • 2
    • 33644861570 scopus 로고    scopus 로고
    • Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
    • DOI 10.1016/j.ijpe.2005.02.007, PII S0925527305000630
    • FY Ding J Zhub H Sun 2006 Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives Int J Prod Econ 102 108 131 10.1016/j.ijpe.2005.02.007 (Pubitemid 43374571)
    • (2006) International Journal of Production Economics , vol.102 , Issue.1 , pp. 108-131
    • Ding, F.-Y.1    Zhu, J.2    Sun, H.3
  • 3
    • 13544275547 scopus 로고    scopus 로고
    • A Multi-Objective Genetic Algorithm for mixed-model sequencing on JIT assembly lines
    • DOI 10.1016/j.ejor.2004.07.016, PII S0377221704004734, Multicriteria Scheduling
    • SA Mansouri 2005 A multi objective genetic algorithm for mixed model sequencing on JIT assembly line Eur J Oper Res 167 3 696 716 1077.90027 10.1016/j.ejor.2004.07.016 2157066 (Pubitemid 40220086)
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 696-716
    • Mansouri, S.A.1
  • 5
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • 1157.90405 10.1016/j.ejor.2007.09.013 2454768
    • N Boysen M Fliedner A Scholl 2009 Sequencing mixed-model assembly lines: survey, classification and model critique Eur J Oper Res 192 349 373 1157.90405 10.1016/j.ejor.2007.09.013 2454768
    • (2009) Eur J Oper Res , vol.192 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 6
    • 0003449926 scopus 로고
    • 2 Institute of Industrial Engineers Norcross
    • Monden Y (1993) Toyota production system, 2nd edn. Institute of Industrial Engineers, Norcross
    • (1993) Toyota Production System
    • Monden, Y.1
  • 7
    • 0024731470 scopus 로고
    • Scheduling mixed-model multi-level just-in-time production systems
    • 10.1080/00207548908942636
    • J Miltenburg G Sinnamon 1989 Scheduling mixed-model multi-level just-in-time production systems Int J Prod Res 27 1487 1509 10.1080/ 00207548908942636
    • (1989) Int J Prod Res , vol.27 , pp. 1487-1509
    • Miltenburg, J.1    Sinnamon, G.2
  • 8
    • 0000172494 scopus 로고
    • Algorithms for scheduling multi-level just-in-time production systems
    • 10.1080/07408179208964209
    • J Miltenburg G Sinnamon 1992 Algorithms for scheduling multi-level just-in-time production systems IIE Trans 24 121 130 10.1080/07408179208964209
    • (1992) IIE Trans , vol.24 , pp. 121-130
    • Miltenburg, J.1    Sinnamon, G.2
  • 9
    • 0029345991 scopus 로고
    • Revisiting the mixed-model multi-level just-in-time scheduling problem
    • 0913.90176 10.1080/00207549508904798
    • J Miltenburg G Sinnamon 1995 Revisiting the mixed-model multi-level just-in-time scheduling problem Int J Prod Res 33 2049 2052 0913.90176 10.1080/00207549508904798
    • (1995) Int J Prod Res , vol.33 , pp. 2049-2052
    • Miltenburg, J.1    Sinnamon, G.2
  • 10
    • 0344165833 scopus 로고
    • A note on 'scheduling mixed-model multi-level JIT production systems'
    • 0913.90177 10.1080/00207549508904800
    • MA Morabito ME Kraus 1995 A note on 'scheduling mixed-model multi-level JIT production systems' Int J Prod Res 33 2061 2063 0913.90177 10.1080/00207549508904800
    • (1995) Int J Prod Res , vol.33 , pp. 2061-2063
    • Morabito, M.A.1    Kraus, M.E.2
  • 11
    • 0030288023 scopus 로고    scopus 로고
    • Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
    • DOI 10.1016/0377-2217(95)00254-5
    • G Steiner JS Yeomans 1996 Optimal level schedules in mixed-model, multi-level just in time assembly systems with pegging Eur J Oper Res 95 38 52 0955.90512 10.1016/0377-2217(95)00254-5 (Pubitemid 126391971)
    • (1996) European Journal of Operational Research , vol.95 , Issue.1 , pp. 38-52
    • Steiner, G.1    Yeomans, J.S.2
  • 12
    • 0030290584 scopus 로고    scopus 로고
    • Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication
    • RT Sumichrast ER Clayton 1996 Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication Int J ProdRes 34 3125 3143 0928.90031 10.1080/00207549608905081 (Pubitemid 126713452)
    • (1996) International Journal of Production Research , vol.34 , Issue.11 , pp. 3125-3143
    • Sumichrast, R.T.1    Clayton, E.R.2
  • 13
    • 30244535639 scopus 로고
    • Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems
    • 10.1016/0272-6963(90)90161-6
    • RT Sumichrast RS Russell 1990 Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems J Oper Manag 9 371 389 10.1016/0272-6963(90)90161-6
    • (1990) J Oper Manag , vol.9 , pp. 371-389
    • Sumichrast, R.T.1    Russell, R.S.2
  • 14
    • 0026624344 scopus 로고
    • A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
    • 0825.90482 10.1080/00207549208942887
    • RT Sumichrast RS Russell BW Taylor 1992 A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system Int J Prod Res 30 199 214 0825.90482 10.1080/00207549208942887
    • (1992) Int J Prod Res , vol.30 , pp. 199-214
    • Sumichrast, R.T.1    Russell, R.S.2    Taylor, B.W.3
  • 15
    • 0000298775 scopus 로고
    • Sequencing to minimize work overload in assembly lines with product options
    • 10.1287/mnsc.37.5.572
    • CA Yano R Rachamadugu 1991 Sequencing to minimize work overload in assembly lines with product options Manage Sci 37 572 586 10.1287/mnsc.37.5.572
    • (1991) Manage Sci , vol.37 , pp. 572-586
    • Yano, C.A.1    Rachamadugu, R.2
  • 16
    • 0032664028 scopus 로고    scopus 로고
    • A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass sub-line
    • T Tamura H Long K Ohno 1999 A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass sub-line Int J Prod Res 60-61 557 564
    • (1999) Int J Prod Res , vol.6061 , pp. 557-564
    • Tamura, T.1    Long, H.2    Ohno, K.3
  • 17
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in just-in-time systems: A survey
    • 0771.90051 10.1016/0377-2217(93)90215-9
    • W Kubiak 1993 Minimizing variation of production rates in just-in-time systems: a survey Eur J Oper Res 66 259 271 0771.90051 10.1016/0377-2217(93) 90215-9
    • (1993) Eur J Oper Res , vol.66 , pp. 259-271
    • Kubiak, W.1
  • 18
    • 0030818944 scopus 로고    scopus 로고
    • Algorithms for sequencing mixed models on an assembly line in a JIT production system
    • Z Xiaobo K Ohno 1997 Algorithms for sequencing mixed models on an assembly line in a JIT production system Comput Ind Eng 32 47 56 10.1016/S0360-8352(96)00193-3 (Pubitemid 127422467)
    • (1997) Computers and Industrial Engineering , vol.32 , Issue.1 , pp. 47-56
    • Xiaobo, Z.1    Ohno, K.2
  • 19
    • 0032688594 scopus 로고    scopus 로고
    • A not on Toyota's goal of sequencing mixed model on an assembly line
    • 10.1016/S0360-8352(98)00113-2
    • Z Xiaobo Z Zhou A Asres 1999 A not on Toyota's goal of sequencing mixed model on an assembly line Comput Ind Eng 36 57 65 10.1016/S0360-8352(98)00113-2
    • (1999) Comput Ind Eng , vol.36 , pp. 57-65
    • Xiaobo, Z.1    Zhou, Z.2    Asres, A.3
  • 20
    • 0029276137 scopus 로고
    • Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage
    • 0832.90052 10.1287/mnsc.41.3.485
    • LH Tsai 1995 Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage Manage Sci 41 3 485 495 0832.90052 10.1287/mnsc.41.3.485
    • (1995) Manage Sci , vol.41 , Issue.3 , pp. 485-495
    • Tsai, L.H.1
  • 21
    • 35348847056 scopus 로고    scopus 로고
    • A hybrid multi-objective shuffled frog-leaping algorithm for a mixed-model assembly line sequencing problem
    • DOI 10.1016/j.cie.2007.06.007, PII S0360835207000976
    • A Rahimi-Vahed AH Mirzaei 2007 A hybrid multi-objective shuffled frog-leaping algorithm for a mixed-model assembly line sequencing problem Comput Ind Eng 53 642 666 10.1016/j.cie.2007.06.007 (Pubitemid 47588649)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.4 , pp. 642-666
    • Rahimi-Vahed, A.1    Mirzaei, A.H.2
  • 22
    • 34548303790 scopus 로고    scopus 로고
    • Product sequencing problem in Mixed-Model Assembly Line to minimize unfinished works
    • DOI 10.1016/j.cie.2007.06.011, PII S0360835207001015, Selected Papers from The 27th. International Conference on Computers and Industrial Engineering - Part 2
    • S Kim B Jeong 2007 Product sequencing problem in mixed-model assembly line to minimize unfinished works Comput Ind Eng 53 206 214 10.1016/j.cie.2007. 06.011 (Pubitemid 47337155)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.2 , pp. 206-214
    • Kim, S.1    Jeong, B.2
  • 24
    • 48749110421 scopus 로고    scopus 로고
    • Genetic optimization of order scheduling with multiple uncertainties
    • 10.1016/j.eswa.2007.08.058
    • ZX Guo WK Wong SYS Leung JT Fan SF Chan 2008 Genetic optimization of order scheduling with multiple uncertainties Expert Syst Appl 35 1788 1801 10.1016/j.eswa.2007.08.058
    • (2008) Expert Syst Appl , vol.35 , pp. 1788-1801
    • Guo, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3    Fan, J.T.4    Chan, S.F.5
  • 25
    • 58349103925 scopus 로고    scopus 로고
    • Intelligent production control decision support system for flexible assembly lines
    • 10.1016/j.eswa.2008.03.023
    • ZX Guo WK Wong SYS Leung JT Fan 2009 Intelligent production control decision support system for flexible assembly lines Expert Syst Appl 36 4268 4277 10.1016/j.eswa.2008.03.023
    • (2009) Expert Syst Appl , vol.36 , pp. 4268-4277
    • Guo, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3    Fan, J.T.4
  • 26
    • 33846524366 scopus 로고    scopus 로고
    • Using memetic algorithms with guided local search to solve assembly sequence planning
    • DOI 10.1016/j.eswa.2006.05.025, PII S0957417406001618
    • HW Tseng WP Wang HY Shih 2007 Using memetic algorithms with guided local search to solve assembly sequence planning Expert Syst Appl 33 451 467 10.1016/j.eswa.2006.05.025 (Pubitemid 46164825)
    • (2007) Expert Systems with Applications , vol.33 , Issue.2 , pp. 451-467
    • Tseng, H.-E.1    Wang, W.-P.2    Shih, H.-Y.3
  • 27
    • 70349467760 scopus 로고    scopus 로고
    • A systematic optimization approach for assembly sequence planning using Taguchi method, DOE, and BPNN
    • 10.1016/j.eswa.2009.05.098
    • WC Chen YY Hsu LF Hsieh PH Tai 2010 A systematic optimization approach for assembly sequence planning using Taguchi method, DOE, and BPNN Expert Syst Appl 37 716 726 10.1016/j.eswa.2009.05.098
    • (2010) Expert Syst Appl , vol.37 , pp. 716-726
    • Chen, W.C.1    Hsu, Y.Y.2    Hsieh, L.F.3    Tai, P.H.4
  • 28
    • 0002686137 scopus 로고
    • A sequencing problem for a mixed model assembly line in a JIT production system
    • 10.1016/0360-8352(94)90240-2
    • Z Xiaobo K Ohno 1994 A sequencing problem for a mixed model assembly line in a JIT production system Comput Ind Eng 27 71 74 10.1016/0360-8352(94)90240-2
    • (1994) Comput Ind Eng , vol.27 , pp. 71-74
    • Xiaobo, Z.1    Ohno, K.2
  • 29
    • 0345208890 scopus 로고    scopus 로고
    • A sequencing problem for a mixed-model assembly line with a bypass sub line
    • Tamura T, Long H, Ohno K, (1996) A sequencing problem for a mixed-model assembly line with a bypass sub line. Proceedings of ICC and IEÕ96, pp 413-416
    • (1996) Proceedings of ICC and IEÕ96 , pp. 413-416
    • Tamura, T.1    Long, H.2    Ohno, K.3
  • 30
    • 0028439141 scopus 로고
    • Sequencing jobs on an automobile assembly line: Objectives and procedures
    • 0901.90126 10.1080/00207549408956996
    • A Bolat 1994 Sequencing jobs on an automobile assembly line: objectives and procedures Int J Prod Res 32 1219 1236 0901.90126 10.1080/00207549408956996
    • (1994) Int J Prod Res , vol.32 , pp. 1219-1236
    • Bolat, A.1
  • 31
    • 0026745702 scopus 로고
    • An analytic framework for sequencing mixed model assembly lines
    • 0825.90483 10.1080/00207549208942876
    • J Bard E Dar-El A Shtub 1992 An analytic framework for sequencing mixed model assembly lines Int J Prod Res 30 35 48 0825.90483 10.1080/ 00207549208942876
    • (1992) Int J Prod Res , vol.30 , pp. 35-48
    • Bard, J.1    Dar-El, E.2    Shtub, A.3
  • 32
    • 0001602291 scopus 로고
    • Sequencing JIT mixed-model assembly lines
    • 0729.90672 10.1287/mnsc.37.7.901
    • R Inman R Bulfin 1991 Sequencing JIT mixed-model assembly lines Manage Sci 37 901 904 0729.90672 10.1287/mnsc.37.7.901
    • (1991) Manage Sci , vol.37 , pp. 901-904
    • Inman, R.1    Bulfin, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.