-
1
-
-
0004083533
-
-
Irwin, Homewood, IL
-
Chase, R., and Aquilano, J. (1985), Production/Operations Management, 4th ed., Irwin, Homewood, IL.
-
(1985)
Production/Operations Management, 4th Ed.
-
-
Chase, R.1
Aquilano, J.2
-
2
-
-
0003811667
-
-
Working Paper No. 294, Faculty of Business, McMaster University, Hamilton, Ont.
-
Goldstein, T., and Miltenburg, J. (1988), "The effects of pegging in the scheduling of just-in-time production systems", Working Paper No. 294, Faculty of Business, McMaster University, Hamilton, Ont.
-
(1988)
The Effects of Pegging in the Scheduling of Just-in-time Production Systems
-
-
Goldstein, T.1
Miltenburg, J.2
-
3
-
-
0004102424
-
-
Dow Jones-Irwin, Homewood, IL
-
Hall, R. (1983), Zero Inventories, Dow Jones-Irwin, Homewood, IL.
-
(1983)
Zero Inventories
-
-
Hall, R.1
-
4
-
-
85029972988
-
MRP models and extensions: Getting MRP to work
-
Faculty of Business, McMaster University, Hamilton, Ont.
-
Karmarkar, U. (1992), "MRP models and extensions: Getting MRP to work", Presented at the Department of Management Science and Information Systems Seminar Series, Faculty of Business, McMaster University, Hamilton, Ont.
-
(1992)
Department of Management Science and Information Systems Seminar Series
-
-
Karmarkar, U.1
-
5
-
-
0041671257
-
-
Working Paper QM 91-06, William E. Simon School of Business, University of Rochester, Rochester, NY
-
Karmarkar, U., and Nambimadom, R. (1992), "Material allocation in MRP with tardiness penalties", Working Paper QM 91-06, William E. Simon School of Business, University of Rochester, Rochester, NY.
-
(1992)
Material Allocation in MRP with Tardiness Penalties
-
-
Karmarkar, U.1
Nambimadom, R.2
-
6
-
-
0027595182
-
Minimizing variation of production rates in just-in-time systems: A survey
-
Kubiak, W. (1993), "Minimizing variation of production rates in just-in-time systems: A survey", European Journal of Operational Research 66, 259-271.
-
(1993)
European Journal of Operational Research
, vol.66
, pp. 259-271
-
-
Kubiak, W.1
-
7
-
-
0025868004
-
A note on 'Level schedules for mixed-model assembly lines in just-in-time production systems'
-
Kubiak, W., and Sethi, S. (1991), "A note on 'Level schedules for mixed-model assembly lines in just-in-time production systems'", Management Science 37/1, 121-122.
-
(1991)
Management Science
, vol.37
, Issue.1
, pp. 121-122
-
-
Kubiak, W.1
Sethi, S.2
-
8
-
-
0028409837
-
Optimal level schedules for flexible assembly lines in JIT production systems
-
Kubiak, W., and Sethi, S. (1994), "Optimal level schedules for flexible assembly lines in JIT production systems", International Journal of Flexible Manufacturing Systems 6, 137-154.
-
(1994)
International Journal of Flexible Manufacturing Systems
, vol.6
, pp. 137-154
-
-
Kubiak, W.1
Sethi, S.2
-
9
-
-
85029991630
-
-
Working Paper, Faculty of Administrative Studies, York University, North York, Ont.
-
Kubiak, W., Steiner, G., and Yeomans, S. (1993), "Optimal level schedules for mixed-model, multi-level just-in-time assembly systems", Working Paper, Faculty of Administrative Studies, York University, North York, Ont.
-
(1993)
Optimal Level Schedules for Mixed-model, Multi-level Just-in-time Assembly Systems
-
-
Kubiak, W.1
Steiner, G.2
Yeomans, S.3
-
10
-
-
0001360372
-
Level schedules for mixed-model assembly lines in just-in-time production systems
-
Miltenburg, J. (1989), "Level schedules for mixed-model assembly lines in just-in-time production systems", Management Science 32/2, 192-207.
-
(1989)
Management Science
, vol.32
, Issue.2
, pp. 192-207
-
-
Miltenburg, J.1
-
11
-
-
84989692636
-
Developing production schedules which balance part usage and smooth production loads in just-in-time production systems
-
Miltenburg, J., and Goldstein, T. (1991), "Developing production schedules which balance part usage and smooth production loads in just-in-time production systems", Naval Research Logistics 38/6, 893-910.
-
(1991)
Naval Research Logistics
, vol.38
, Issue.6
, pp. 893-910
-
-
Miltenburg, J.1
Goldstein, T.2
-
12
-
-
0024731470
-
Scheduling mixed-model, multilevel assembly lines in just-in-time production systems
-
Miltenburg, J., and Sinnamon, G. (1989), "Scheduling mixed-model, multilevel assembly lines in just-in-time production systems", International Journal of Production Research 27, 1487-1509.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1487-1509
-
-
Miltenburg, J.1
Sinnamon, G.2
-
13
-
-
0025251040
-
A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
-
Miltenburg, J., Steiner, G., and Yeomans, S. (1990), "A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems", Mathematical and Computer Modelling 13/3, 57-66.
-
(1990)
Mathematical and Computer Modelling
, vol.13
, Issue.3
, pp. 57-66
-
-
Miltenburg, J.1
Steiner, G.2
Yeomans, S.3
-
14
-
-
0003449926
-
-
Industrial Engineering & Management Press, Norcross, GA
-
Monden, Y. (1983), Toyota Production Systems, Industrial Engineering & Management Press, Norcross, GA.
-
(1983)
Toyota Production Systems
-
-
Monden, Y.1
-
15
-
-
0018469357
-
A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor
-
Okamura, K., and Yamashita, H. (1979), "A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor", International Journal of Production Research 17, 233-247.
-
(1979)
International Journal of Production Research
, vol.17
, pp. 233-247
-
-
Okamura, K.1
Yamashita, H.2
-
17
-
-
0027614669
-
Level schedules for mixed-model, just-in-time assembly processes
-
Steiner, G., and Yeomans, S. (1993), "Level schedules for mixed-model, just-in-time assembly processes", Management Science 36/6, 728-735.
-
(1993)
Management Science
, vol.36
, Issue.6
, pp. 728-735
-
-
Steiner, G.1
Yeomans, S.2
|