-
1
-
-
0022667867
-
Optimal control of production rate in a failure-prone manufacturing system
-
Akella R., and Kumar P.R. Optimal control of production rate in a failure-prone manufacturing system. IEEE Transactions on Automatic Control AC 31 (1986) 116-126
-
(1986)
IEEE Transactions on Automatic Control
, vol.AC 31
, pp. 116-126
-
-
Akella, R.1
Kumar, P.R.2
-
5
-
-
0025481509
-
Manufacturing flow control and preventive maintenance: A stochastic control approach
-
Boukas E.K., and Haurie A. Manufacturing flow control and preventive maintenance: A stochastic control approach. IEEE Transactions on Automatic Control 33 (1990) 1024-1031
-
(1990)
IEEE Transactions on Automatic Control
, vol.33
, pp. 1024-1031
-
-
Boukas, E.K.1
Haurie, A.2
-
8
-
-
0033737583
-
Production and preventive maintenance rates control for a manufacturing system: An experimental design approach
-
Gharbi A., and Kenne J.P. Production and preventive maintenance rates control for a manufacturing system: An experimental design approach. Intentional Journal of Production Economics 65 (2000) 275-287
-
(2000)
Intentional Journal of Production Economics
, vol.65
, pp. 275-287
-
-
Gharbi, A.1
Kenne, J.P.2
-
9
-
-
0041417619
-
Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems
-
Gharbi A., and Kenne J.P. Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems. IIE Transactions 35 (2003) 941-952
-
(2003)
IIE Transactions
, vol.35
, pp. 941-952
-
-
Gharbi, A.1
Kenne, J.P.2
-
10
-
-
0142043493
-
Stochastic models and numerical solutions for production planning with applications to the paper industry
-
Karen K.Y., Liu H., and Yin G.G. Stochastic models and numerical solutions for production planning with applications to the paper industry. Computers and Chemical Engineering 27 (2003) 1693-1706
-
(2003)
Computers and Chemical Engineering
, vol.27
, pp. 1693-1706
-
-
Karen, K.Y.1
Liu, H.2
Yin, G.G.3
-
11
-
-
0037278646
-
Hierarchical control of production and maintenance rates in manufacturing systems
-
Kenne J.P., and Boukas E.K. Hierarchical control of production and maintenance rates in manufacturing systems. Journal of Quality in Maintenance Engineering 9 (2003) 66-82
-
(2003)
Journal of Quality in Maintenance Engineering
, vol.9
, pp. 66-82
-
-
Kenne, J.P.1
Boukas, E.K.2
-
12
-
-
0033079907
-
Experimental design in production and maintenance control problem of a single machine, single product manufacturing system
-
Kenne J.P., and Gharbi A. Experimental design in production and maintenance control problem of a single machine, single product manufacturing system. International Journal of Production Research 37 (1999) 621-637
-
(1999)
International Journal of Production Research
, vol.37
, pp. 621-637
-
-
Kenne, J.P.1
Gharbi, A.2
-
13
-
-
0141504179
-
Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system
-
Kenne J.P., Boukas E.K., and Gharbi A. Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system. Mathematical and Computer Modelling 38 (2003) 351-365
-
(2003)
Mathematical and Computer Modelling
, vol.38
, pp. 351-365
-
-
Kenne, J.P.1
Boukas, E.K.2
Gharbi, A.3
-
15
-
-
0019240915
-
-
Older, G.J., Suri, R., 1980. Time optimal of part-routing in a manufacturing system with failure prone machines. In: Proceedings of the 19th IEEE Conference on Decision Control, vol. 5, pp. 722-727.
-
-
-
-
17
-
-
0016498087
-
Control of systems with jump Markov disturbances
-
Rishel R. Control of systems with jump Markov disturbances. IEEE Transactions on Automatic Control 13 (1975) 241-244
-
(1975)
IEEE Transactions on Automatic Control
, vol.13
, pp. 241-244
-
-
Rishel, R.1
-
19
-
-
0031259285
-
A numerical method in optimal production and setup scheduling to stochastic manufacturing systems
-
Yan H., and Zhang Q. A numerical method in optimal production and setup scheduling to stochastic manufacturing systems. IEEE Transactions on Automatic Control 42 (1997) 1452-1455
-
(1997)
IEEE Transactions on Automatic Control
, vol.42
, pp. 1452-1455
-
-
Yan, H.1
Zhang, Q.2
|