메뉴 건너뛰기




Volumn 14, Issue 2, 2010, Pages 53-78

The impact of walking time on U-shaped assembly line worker allocation problems

Author keywords

Coincidence algorithm; Multiple objectives; U shaped assembly lines; Walking time; Worker allocation

Indexed keywords


EID: 78751686186     PISSN: 01258281     EISSN: None     Source Type: Journal    
DOI: 10.4186/ej.2010.14.2.53     Document Type: Article
Times cited : (33)

References (37)
  • 2
    • 0003449926 scopus 로고
    • Norcross, Georgia: Engineering and Management Press
    • Y. Monden, Toyota Production System. Norcross, Georgia: Engineering and Management Press, 1993.
    • (1993) Toyota Production System
    • Monden, Y.1
  • 3
    • 0035311608 scopus 로고    scopus 로고
    • One-piece flow manufacturing on U-shaped production lines: A tutorial
    • J. Miltenburg, "One-piece flow manufacturing on U-shaped production lines: A tutorial, " IIE Transactions, vol. 33, no. 4, pp. 303-321, 2001.
    • (2001) IIE Transactions , vol.33 , Issue.4 , pp. 303-321
    • Miltenburg, J.1
  • 6
    • 0032070937 scopus 로고    scopus 로고
    • Note. Optimal Balancing of U-shaped Assembly Lines
    • T. L. Urban, "Note. Optimal Balancing of U-shaped Assembly Lines, " Management Science, vol. 44, no. 5, pp. 738-741, 1998.
    • (1998) Management Science , vol.44 , Issue.5 , pp. 738-741
    • Urban, T.L.1
  • 7
    • 0033101693 scopus 로고    scopus 로고
    • ULINO: Optimally balancing U-shaped JIT assembly lines
    • A. Scholl and R. Klein, "ULINO: Optimally balancing U-shaped JIT assembly lines, " International Journal of Production Research, vol. 37, no. 4, pp. 721-736, 1999.
    • (1999) International Journal of Production Research , vol.37 , Issue.4 , pp. 721-736
    • Scholl, A.1    Klein, R.2
  • 8
    • 46649115541 scopus 로고    scopus 로고
    • U-shaped assembly line balancing problem with genetic algorithm
    • R. K. Hwang, H. Katayama, and M. Gen, "U-shaped assembly line balancing problem with genetic algorithm, " International Journal of Production Research, vol. 46, no. 16, pp. 4637-4649, 2008.
    • (2008) International Journal of Production Research , vol.46 , Issue.16 , pp. 4637-4649
    • Hwang, R.K.1    Katayama, H.2    Gen, M.3
  • 9
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • C. Becker and A. Scholl, "A survey on problems and methods in generalized assembly line balancing, " European Journal of Operational Research, vol. 168, no. 3, pp. 694-715, 2006.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 10
    • 0028531312 scopus 로고
    • The U-line balancing problem
    • G. J. Miltenburg and J. Wijngaard, "The U-line balancing problem, " Management Science, vol. 40, no. 10, pp. 1378-1388, 1994.
    • (1994) Management Science , vol.40 , Issue.10 , pp. 1378-1388
    • Miltenburg, G.J.1    Wijngaard, J.2
  • 11
  • 12
    • 1642587683 scopus 로고    scopus 로고
    • U-shaped assembly line layouts and their impact on labour productivity: An experimental study
    • G. R. Aase, J. R. Olson, and M. J. Chniederjans, "U-shaped assembly line layouts and their impact on labour productivity: An experimental study, " European Journal of Operational Research, vol. 156, no. 3, pp. 698-711, 2004.
    • (2004) European Journal of Operational Research , vol.156 , Issue.3 , pp. 698-711
    • Aase, G.R.1    Olson, J.R.2    Chniederjans, M.J.3
  • 13
    • 70449632610 scopus 로고    scopus 로고
    • A multi-decision genetic approach for workload balancing of mixed-model U-shaped assembly line systems
    • R. K. Hwang and H. Katayama, "A multi-decision genetic approach for workload balancing of mixed-model U-shaped assembly line systems, " International Journal of Production Research, vol. 47, no. 14, pp. 3797-3822, 2009.
    • (2009) International Journal of Production Research , vol.47 , Issue.14 , pp. 3797-3822
    • Hwang, R.K.1    Katayama, H.2
  • 14
    • 0002134614 scopus 로고    scopus 로고
    • Balancing U-lines in a multiple U-line facility
    • J. Miltenburg, "Balancing U-lines in a multiple U-line facility, " European Journal of Operational Research, vol. 109, no. 1, pp. 1-23, 1998.
    • (1998) European Journal of Operational Research , vol.109 , Issue.1 , pp. 1-23
    • Miltenburg, J.1
  • 16
    • 0035906303 scopus 로고    scopus 로고
    • U-shaped production lines: A review of theory and practice
    • J. Miltenburg, "U-shaped production lines: A review of theory and practice, " International Journal of Production Economics, vol. 70, no. 3, pp. 201-214, 2001.
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 201-214
    • Miltenburg, J.1
  • 17
    • 42649083687 scopus 로고    scopus 로고
    • Worker allocation in lean U-shaped production lines
    • J. P. Shewchuk, "Worker allocation in lean U-shaped production lines, " International Journal of Production Research, vol. 46, no. 13, pp. 3485-3502, 2008.
    • (2008) International Journal of Production Research , vol.46 , Issue.13 , pp. 3485-3502
    • Shewchuk, J.P.1
  • 18
    • 0022699406 scopus 로고
    • A comparative evaluation of heuristic line balancing techniques
    • F. B. Talbot, J. H. Patterson, and W. V. Gehrlein, "A comparative evaluation of heuristic line balancing techniques, " Management Science, vol. 32, no. 4, pp. 430-454, 1986.
    • (1986) Management Science , vol.32 , Issue.4 , pp. 430-454
    • Talbot, F.B.1    Patterson, J.H.2    Gehrlein, W.V.3
  • 20
    • 38049000847 scopus 로고    scopus 로고
    • Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled
    • C. Miralles, J. P. Garcia-Sabater, C. Andres, and M. Cardos, "Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled, " Discrete Applied Mathematics vol. 156, no. 3, pp. 352-367, 2008.
    • (2008) Discrete Applied Mathematics , vol.156 , Issue.3 , pp. 352-367
    • Miralles, C.1    Garcia-Sabater, J.P.2    Andres, C.3    Cardos, M.4
  • 21
    • 0031118769 scopus 로고    scopus 로고
    • Heuristics for operator allocation and sequencing in product-line-cells with manually operated machines
    • S. Vembu and G. Srinivasan, " Heuristics for operator allocation and sequencing in product-line-cells with manually operated machines, " Computers & Industrial Engineering, vol. 32, no. 2, pp. 265-279,1997.
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.2 , pp. 265-279
    • Vembu, S.1    Srinivasan, G.2
  • 22
    • 0032624742 scopus 로고    scopus 로고
    • An optimal worker allocation problem for a U-shaped production line
    • K. Nakade and K. Ohno, "An optimal worker allocation problem for a U-shaped production line, "International Journal of Production Economics, vol. 60-61, no. 1, pp. 353-358, 1999.
    • (1999) International Journal of Production Economics , vol.60-61 , Issue.1 , pp. 353-358
    • Nakade, K.1    Ohno, K.2
  • 23
    • 0037332862 scopus 로고    scopus 로고
    • Separate and carousel type allocations of workers in a U-shaped production line
    • K. Nakade and K. Ohno, "Separate and carousel type allocations of workers in a U-shaped production line, " European Journal of Operational Research, vol. 145, no. 2, pp. 403-424, 2003.
    • (2003) European Journal of Operational Research , vol.145 , Issue.2 , pp. 403-424
    • Nakade, K.1    Ohno, K.2
  • 24
    • 12244251454 scopus 로고    scopus 로고
    • Data envelopment analysis based decision model for optimal operator allocation in CMS
    • T. Ertay and D. Ruan, "Data envelopment analysis based decision model for optimal operator allocation in CMS, " European Journal of Operational Research, vol. 164, no. 3, pp. 800-810, 2005.
    • (2005) European Journal of Operational Research , vol.164 , Issue.3 , pp. 800-810
    • Ertay, T.1    Ruan, D.2
  • 27
    • 38849099717 scopus 로고    scopus 로고
    • Optimal allocation of heterogeneous workers in a U-shaped production line
    • K. Nakade and R. Nishiwaki, "Optimal allocation of heterogeneous workers in a U-shaped production line, " Computers & Industrial Engineering, vol. 54, no. 3, pp. 432-440, 2008.
    • (2008) Computers & Industrial Engineering , vol.54 , Issue.3 , pp. 432-440
    • Nakade, K.1    Nishiwaki, R.2
  • 29
    • 34648816957 scopus 로고    scopus 로고
    • Optimization of mixed-skill multi-line operator allocation problem
    • Y. Kuo and T. Yang, "Optimization of mixed-skill multi-line operator allocation problem, " Computers and Industrial Engineering, vol. 53, no. 3, pp. 386-393, 2007.
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.3 , pp. 386-393
    • Kuo, Y.1    Yang, T.2
  • 30
    • 1442313001 scopus 로고    scopus 로고
    • Learning and labor assignment in a dual resource constrained cellular shop
    • V. R. Kannan and J. B. Jensen, "Learning and labor assignment in a dual resource constrained cellular shop, " International Journal of Production Research, vol. 42, no. 7, pp. 1455-1470, 2004.
    • (2004) International Journal of Production Research , vol.42 , Issue.7 , pp. 1455-1470
    • Kannan, V.R.1    Jensen, J.B.2
  • 31
    • 84877790821 scopus 로고    scopus 로고
    • An investigation of local searches in Memetic Algorithms for multi-objective sequencing problems on mixed-model assembly lines
    • Beijing, China
    • P. Chutima and P. Pinkoompee, "An investigation of local searches in Memetic Algorithms for multi-objective sequencing problems on mixed-model assembly lines, " Proceedings of Computers and Industrial Engineering, Beijing, China, 2008.
    • (2008) Proceedings of Computers and Industrial Engineering
    • Chutima, P.1    Pinkoompee, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.