-
1
-
-
0242401874
-
an analysis of exact U-shaped line balancing procedures
-
U-OPT
-
Aase, G.R., Schniederjans, M.J. and Olson, J.R., U-OPT: an analysis of exact U-shaped line balancing procedures. Int. J. Prod. Res., 2003, 41(17), 4185-4210.
-
(2003)
Int. J. Prod. Res
, vol.41
, Issue.17
, pp. 4185-4210
-
-
Aase, G.R.1
Schniederjans, M.J.2
Olson, J.R.3
-
2
-
-
25144450992
-
A survey on problems and methods in generalized assembly line balancing
-
Becker, C. and Scholl, A., A survey on problems and methods in generalized assembly line balancing. Euro. J. Oper. Res., 2006, 168, 694-715.
-
(2006)
Euro. J. Oper. Res
, vol.168
, pp. 694-715
-
-
Becker, C.1
Scholl, A.2
-
3
-
-
20844456697
-
-
Productivity Press: New York, NY
-
Dennis, P., Lean Production Simplified, pp. 57-58, 2002 (Productivity Press: New York, NY).
-
(2002)
Lean Production Simplified
, pp. 57-58
-
-
Dennis, P.1
-
4
-
-
0035840757
-
Balancing of U-type assembly systems using simulated annealing
-
Erel, E., Sabuncuoglu, I. and Aksu, B.A., Balancing of U-type assembly systems using simulated annealing. Int. J. Prod. Res., 2001, 39(13), 3003-3015.
-
(2001)
Int. J. Prod. Res
, vol.39
, Issue.13
, pp. 3003-3015
-
-
Erel, E.1
Sabuncuoglu, I.2
Aksu, B.A.3
-
5
-
-
28244475042
-
A goal programming approach to simple U-line balancing problem
-
Gökçen, H. and Aǧpak, K., A goal programming approach to simple U-line balancing problem. Euro. J. Oper. Res., 2006, 171(2), 577-585.
-
(2006)
Euro. J. Oper. Res
, vol.171
, Issue.2
, pp. 577-585
-
-
Gökçen, H.1
Aǧpak, K.2
-
7
-
-
0028531312
-
The U-line line balancing problem
-
Miltenburg, G.J. and Wijngaard, J., The U-line line balancing problem. Manage. Sci., 1994, 40(10), 1378-1388.
-
(1994)
Manage. Sci
, vol.40
, Issue.10
, pp. 1378-1388
-
-
Miltenburg, G.J.1
Wijngaard, J.2
-
8
-
-
0035906303
-
U-shaped production lines: A review of theory and practice
-
Miltenburg, J., U-shaped production lines: a review of theory and practice. Int. J. Prod. Econ., 2001, 70(3), 201-214.
-
(2001)
Int. J. Prod. Econ
, vol.70
, Issue.3
, pp. 201-214
-
-
Miltenburg, J.1
-
9
-
-
0003449926
-
-
Institute of Industrial Engineers: Norcross
-
Monden, Y., Toyota Production System, 1998 (Institute of Industrial Engineers: Norcross).
-
(1998)
Toyota Production System
-
-
Monden, Y.1
-
10
-
-
0001207094
-
Analysis and optimization of a U-shaped production line
-
Ohno, K. and Nakade, K., Analysis and optimization of a U-shaped production line. J. Oper. Res. Soc. Japan, 1997, 40(1), 90-104.
-
(1997)
J. Oper. Res. Soc. Japan
, vol.40
, Issue.1
, pp. 90-104
-
-
Ohno, K.1
Nakade, K.2
-
11
-
-
0032624742
-
An optimal worker allocation problem for a U-shaped production line
-
Nakade, K. and Ohno, K., An optimal worker allocation problem for a U-shaped production line. Int. J. Prod. Econ., 1999, 60-61, 353-358.
-
(1999)
Int. J. Prod. Econ
, vol.60-61
, pp. 353-358
-
-
Nakade, K.1
Ohno, K.2
-
12
-
-
0033101693
-
optimally balancing U-shaped JIT assembly lines
-
ULINDO
-
Scholl, A. and Klein, R., ULINDO: optimally balancing U-shaped JIT assembly lines. Int. J. Prod. Res., 1999, 37(4), 721-736.
-
(1999)
Int. J. Prod. Res
, vol.37
, Issue.4
, pp. 721-736
-
-
Scholl, A.1
Klein, R.2
-
14
-
-
0032070937
-
Optimal Balancing of U-Shaped Assembly Lines
-
Urban, T.L., Optimal Balancing of U-Shaped Assembly Lines. Manage. Sci., 1998, 44(4), 738-741.
-
(1998)
Manage. Sci
, vol.44
, Issue.4
, pp. 738-741
-
-
Urban, T.L.1
|