메뉴 건너뛰기




Volumn , Issue , 2010, Pages

Batch sizing with random yield and imperfect inspection and process compressibility

Author keywords

Imperfect production; Inspection; Process compressibility; Random yield; Rework; Scrap

Indexed keywords

IMPERFECT PRODUCTION; PROCESS COMPRESSIBILITY; RANDOM YIELD; REWORK; SCRAP;

EID: 78651453250     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICCIE.2010.5668221     Document Type: Conference Paper
Times cited : (2)

References (14)
  • 1
    • 34447260758 scopus 로고    scopus 로고
    • On optimal manufacturing batch size with rework process at single-stage production system
    • Barron, E.C., "On optimal manufacturing batch size with rework process at single-stage production system", Computers and Industrial Engineering , vol. 53, 2007, pp. 196-198.
    • (2007) Computers and Industrial Engineering , vol.53 , pp. 196-198
    • Barron, E.C.1
  • 2
    • 69649103599 scopus 로고    scopus 로고
    • Economic production quantity with rework process at a single-stage manufacturing system with planned backorders
    • Cárdenas-Barrón, L.E., "Economic production quantity with rework process at a single-stage manufacturing system with planned backorders", Computers and Industrial Engineering, vol. 57, 2009, pp. 1105-1113.
    • (2009) Computers and Industrial Engineering , vol.57 , pp. 1105-1113
    • Cárdenas-Barrón, L.E.1
  • 3
    • 72949118882 scopus 로고    scopus 로고
    • Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
    • Chiu, Y.S.P., Chen, K.K., Cheng, F.T., Wu, M.F., "Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown", Computers and Mathematics with Applications, vol.59, 2010, pp. 919-932.
    • (2010) Computers and Mathematics with Applications , vol.59 , pp. 919-932
    • Chiu, Y.S.P.1    Chen, K.K.2    Cheng, F.T.3    Wu, M.F.4
  • 4
    • 34247863936 scopus 로고    scopus 로고
    • Optimal production lot sizing with rework, scrap rate, and service level constraint
    • Chiu, S.W., Ting, C., Y.P., Chiu, "Optimal production lot sizing with rework, scrap rate, and service level constraint", Mathematical and Computer Modeling, vol. 46, 2007, pp. 535-449.
    • (2007) Mathematical and Computer Modeling , vol.46 , pp. 535-1449
    • Chiu, S.W.1    Ting, C.2    Chiu, Y.P.3
  • 5
    • 59049103474 scopus 로고    scopus 로고
    • A two-warehouse inventory model with imperfect quality production processes
    • Chung, K.J., Chao-Chun, H., Shy-Der, L, "A two-warehouse inventory model with imperfect quality production processes", Computers and Industrial Engineering, vol. 56, 2009, pp. 193-197.
    • (2009) Computers and Industrial Engineering , vol.56 , pp. 193-197
    • Chung, K.J.1    Chao-Chun, H.2    Shy-Der, L.3
  • 7
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek, P.A., Salameh, M.K., "Production lot sizing with the reworking of imperfect quality items produced", Production Planning and Control, vol 12, 2001, pp. 584-590.
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 8
    • 70350566005 scopus 로고    scopus 로고
    • Quality investment and inspection policy in a supplier-manufacturer supply chain
    • Hsieh, C.C., Liu, Y.T., "Quality investment and inspection policy in a supplier-manufacturer supply chain", European Journal of Operational Research, vol. 202, 2009, pp. 717-729.
    • (2009) European Journal of Operational Research , vol.202 , pp. 717-729
    • Hsieh, C.C.1    Liu, Y.T.2
  • 9
    • 10844259870 scopus 로고    scopus 로고
    • A cost / benefit model for investments in inventory and preventive maintenance in an imperfect production system
    • Lee, H.H., "A cost / benefit model for investments in inventory and preventive maintenance in an imperfect production system", Computers and Industrial Engineering, vol. 48, 2005, pp. 55-68.
    • (2005) Computers and Industrial Engineering , vol.48 , pp. 55-68
    • Lee, H.H.1
  • 10
    • 56249098653 scopus 로고    scopus 로고
    • Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
    • Liao, G.L., Chen, Y.H., Sheu, S., "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance", European Journal of Operational Research, vol. 195, 2009, pp. 348-357.
    • (2009) European Journal of Operational Research , vol.195 , pp. 348-357
    • Liao, G.L.1    Chen, Y.H.2    Sheu, S.3
  • 11
    • 69249219084 scopus 로고    scopus 로고
    • A production-inventory model in an imperfect production process
    • Sana, S.S., "A production-inventory model in an imperfect production process", European Journal of Operational Research, vol. 200, 2010, pp. 451-464.
    • (2010) European Journal of Operational Research , vol.200 , pp. 451-464
    • Sana, S.S.1
  • 12
    • 59349105235 scopus 로고    scopus 로고
    • A production-inventory model with remanufacturing for defective and usable items in fuzzyenvironment
    • Roy, A., Maity, K., Maiti, M., "A production-inventory model with remanufacturing for defective and usable items in fuzzyenvironment", Computers and Industrial Engineering, vol. 56, 2009, pp. 87-96.
    • (2009) Computers and Industrial Engineering , vol.56 , pp. 87-96
    • Roy, A.1    Maity, K.2    Maiti, M.3
  • 13
    • 70249126214 scopus 로고    scopus 로고
    • An economic production lot size model in an imperfect production system
    • Sana, S.S, "An economic production lot size model in an imperfect production system", European Journal of Operational Research, vol. 201, 2010, pp. 158-170.
    • (2010) European Journal of Operational Research , vol.201 , pp. 158-170
    • Sana, S.S.1
  • 14
    • 70449120714 scopus 로고    scopus 로고
    • An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length
    • Ming, P.C., Chen, J., "An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length", International Journal of Systems Science, vol. 40, 2009, pp. 1051-1061.
    • (2009) International Journal of Systems Science , vol.40 , pp. 1051-1061
    • Ming, P.C.1    Chen, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.