메뉴 건너뛰기




Volumn 40, Issue 10, 2009, Pages 1051-1061

An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length

Author keywords

Economic production quantity; EOQ models; Imperfect PM; Imperfect process; Inspection time; Inventory

Indexed keywords

ECONOMIC PRODUCTION QUANTITY; EOQ MODELS; IMPERFECT PM; IMPERFECT PROCESS; INSPECTION TIME; INVENTORY;

EID: 70449120714     PISSN: 00207721     EISSN: 14645319     Source Type: Journal    
DOI: 10.1080/00207720902974645     Document Type: Article
Times cited : (17)

References (17)
  • 1
    • 0024108191 scopus 로고    scopus 로고
    • Economic design of x-Chart under weibull shock models
    • Banerjee, P.K., and Rahim, M.A. (1998), 'Economic Design of x-Chart Under Weibull Shock Models', Technometrics, 30, 407-414.
    • (1998) Technometrics , vol.30 , pp. 407-414
    • Banerjee, P.K.1    Rahim, M.A.2
  • 2
    • 0032627437 scopus 로고    scopus 로고
    • Integrated production maintenance and quality model using the imperfect maintenance concept
    • Ben-Daya, M. (1999), 'Integrated Production Maintenance and Quality Model Using the Imperfect Maintenance Concept', IIE Transactions, 31, 491-501.
    • (1999) IIE Transactions , vol.31 , pp. 491-501
    • Ben-Daya, M.1
  • 3
    • 0037061529 scopus 로고    scopus 로고
    • The economic production lot-sizing problem with imperfect production process and imperfect maintenance
    • Ben-Daya, M. (2002), 'The Economic Production Lot-sizing Problem With Imperfect Production Process and Imperfect Maintenance', International Journal of Production Economics, 76, 257-264.
    • (2002) International Journal of Production Economics , vol.76 , pp. 257-264
    • Ben-Daya, M.1
  • 4
    • 0032138493 scopus 로고    scopus 로고
    • Integrated production and quality model under various preventive maintenance policies
    • Ben-Daya, M., and Makhdoum, M. (1998), 'Integrated Production and Quality Model Under Various Preventive Maintenance Policies', Journal of the Operational Research Society, 49, 840-853.
    • (1998) Journal of the Operational Research Society , vol.49 , pp. 840-853
    • Ben-Daya, M.1    Makhdoum, M.2
  • 5
    • 0032096710 scopus 로고    scopus 로고
    • Note: The economic manufacturing lot-sizing problem with imperfect production process: Bounds and optimal solutions
    • Hariga, M., and Ben-Daya, M. (1998), 'Note: The Economic Manufacturing Lot-sizing Problem With Imperfect Production Process: Bounds and Optimal Solutions', Naval Research Logistics, 45, 423-432.
    • (1998) Naval Research Logistics , vol.45 , pp. 423-432
    • Hariga, M.1    Ben-Daya, M.2
  • 6
    • 0024914068 scopus 로고
    • A production and maintenance planning model with restoration cost dependent on detection delay
    • Lee, H.L., and Rosenblatt, M.J. (1989), 'A Production and Maintenance Planning Model With Restoration Cost Dependent on Detection Delay', IIE Transactions, 21(4), 368-375.
    • (1989) IIE Transactions , vol.21 , Issue.4 , pp. 368-375
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 7
    • 0002899872 scopus 로고
    • Optimal inspection schedule in the imperfect production system under general shift distribution
    • Lin, T.M., Tseng, S.T., and Liou, M.J. (1991), 'Optimal Inspection Schedule in the Imperfect Production System Under General Shift Distribution', Journal of Chinese Institute of Industrial Engineers, 8(2), 73-81.
    • (1991) Journal of Chinese Institute of Industrial Engineers , vol.8 , Issue.2 , pp. 73-81
    • Lin, T.M.1    Tseng, S.T.2    Liou, M.J.3
  • 8
    • 0016070581 scopus 로고
    • Inspection Policies When Duration of Checkings Is Non-negligible
    • Luss, H., and Kander, Z. (1974), 'Inspection Policies When Duration of Checkings is Non-negligible', Operational Research Quarterly, 25(2), 299-309.
    • (1974) Operational Research Quarterly , vol.25 , Issue.2 , pp. 299-309
    • Luss, H.1    Kander, Z.2
  • 9
    • 0021581827 scopus 로고
    • A stepwise partial enumeration algorithm for the economic lot scheduling problem
    • Park, K.S., and Yun, D.K. (1984), 'A Stepwise Partial Enumeration Algorithm for the Economic Lot Scheduling Problem', IIE Transactions, 16(4), 363-370.
    • (1984) IIE Transactions , vol.16 , Issue.4 , pp. 363-370
    • Park, K.S.1    Yun, D.K.2
  • 11
    • 0022613610 scopus 로고
    • Optimal Lot Sizing, process quality improvement and setup cost reduction
    • Porteus, E.L. (1986), 'Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction', Operation Research, 34, 137-144.
    • (1986) Operation Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 12
    • 0031648198 scopus 로고    scopus 로고
    • A generalized economic model for joint determination of production run, inspection schedule and control chart design
    • Rahim, M.A., and Ben-Daya, M. (1998), 'A Generalized Economic Model for Joint Determination of Production Run, Inspection Schedule and Control Chart Design', International Journal of Production Research, 36, 277-289.
    • (1998) International Journal of Production Research , vol.36 , pp. 277-289
    • Rahim, M.A.1    Ben-Daya, M.2
  • 13
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production process
    • Rosenblatt, M.J., and Lee, H.L. (1986), 'Economic Production Cycles With Imperfect Production Process', IIE Transactions, 18, 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 14
    • 1642301525 scopus 로고    scopus 로고
    • Optimal lot-sizing problem with imperfect maintenance and imperfect production
    • Sheu, S.H., and Chen, J.A. (2004), 'Optimal Lot-sizing Problem With Imperfect Maintenance and Imperfect Production', International Journal of Systems Science, 35(1), 69-77.
    • (2004) International Journal of Systems Science , vol.35 , Issue.1 , pp. 69-77
    • Sheu, S.H.1    Chen, J.A.2
  • 17
    • 10444289915 scopus 로고    scopus 로고
    • Integrated production and product inspection policy for a deteriorating production system
    • Wang, C.H. (2005), 'Integrated Production and Product Inspection Policy for a Deteriorating Production System', International Journal of Production Economics, 95, 123-134.
    • (2005) International Journal of Production Economics , vol.95 , pp. 123-134
    • Wang, C.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.