-
1
-
-
0024108191
-
Economic design of x-Chart under weibull shock models
-
Banerjee, P.K., and Rahim, M.A. (1998), 'Economic Design of x-Chart Under Weibull Shock Models', Technometrics, 30, 407-414.
-
(1998)
Technometrics
, vol.30
, pp. 407-414
-
-
Banerjee, P.K.1
Rahim, M.A.2
-
2
-
-
0032627437
-
Integrated production maintenance and quality model using the imperfect maintenance concept
-
Ben-Daya, M. (1999), 'Integrated Production Maintenance and Quality Model Using the Imperfect Maintenance Concept', IIE Transactions, 31, 491-501.
-
(1999)
IIE Transactions
, vol.31
, pp. 491-501
-
-
Ben-Daya, M.1
-
3
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production process and imperfect maintenance
-
Ben-Daya, M. (2002), 'The Economic Production Lot-sizing Problem With Imperfect Production Process and Imperfect Maintenance', International Journal of Production Economics, 76, 257-264.
-
(2002)
International Journal of Production Economics
, vol.76
, pp. 257-264
-
-
Ben-Daya, M.1
-
4
-
-
0032138493
-
Integrated production and quality model under various preventive maintenance policies
-
Ben-Daya, M., and Makhdoum, M. (1998), 'Integrated Production and Quality Model Under Various Preventive Maintenance Policies', Journal of the Operational Research Society, 49, 840-853.
-
(1998)
Journal of the Operational Research Society
, vol.49
, pp. 840-853
-
-
Ben-Daya, M.1
Makhdoum, M.2
-
5
-
-
0032096710
-
Note: The economic manufacturing lot-sizing problem with imperfect production process: Bounds and optimal solutions
-
Hariga, M., and Ben-Daya, M. (1998), 'Note: The Economic Manufacturing Lot-sizing Problem With Imperfect Production Process: Bounds and Optimal Solutions', Naval Research Logistics, 45, 423-432.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 423-432
-
-
Hariga, M.1
Ben-Daya, M.2
-
6
-
-
0024914068
-
A production and maintenance planning model with restoration cost dependent on detection delay
-
Lee, H.L., and Rosenblatt, M.J. (1989), 'A Production and Maintenance Planning Model With Restoration Cost Dependent on Detection Delay', IIE Transactions, 21(4), 368-375.
-
(1989)
IIE Transactions
, vol.21
, Issue.4
, pp. 368-375
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
7
-
-
0002899872
-
Optimal inspection schedule in the imperfect production system under general shift distribution
-
Lin, T.M., Tseng, S.T., and Liou, M.J. (1991), 'Optimal Inspection Schedule in the Imperfect Production System Under General Shift Distribution', Journal of Chinese Institute of Industrial Engineers, 8(2), 73-81.
-
(1991)
Journal of Chinese Institute of Industrial Engineers
, vol.8
, Issue.2
, pp. 73-81
-
-
Lin, T.M.1
Tseng, S.T.2
Liou, M.J.3
-
8
-
-
0016070581
-
Inspection Policies When Duration of Checkings Is Non-negligible
-
Luss, H., and Kander, Z. (1974), 'Inspection Policies When Duration of Checkings is Non-negligible', Operational Research Quarterly, 25(2), 299-309.
-
(1974)
Operational Research Quarterly
, vol.25
, Issue.2
, pp. 299-309
-
-
Luss, H.1
Kander, Z.2
-
9
-
-
0021581827
-
A stepwise partial enumeration algorithm for the economic lot scheduling problem
-
Park, K.S., and Yun, D.K. (1984), 'A Stepwise Partial Enumeration Algorithm for the Economic Lot Scheduling Problem', IIE Transactions, 16(4), 363-370.
-
(1984)
IIE Transactions
, vol.16
, Issue.4
, pp. 363-370
-
-
Park, K.S.1
Yun, D.K.2
-
10
-
-
0030575689
-
Imperfect maintenance
-
Pham, H., and Wang, H. (1996), 'Imperfect Maintenance', European Journal of Operational Research, 94, 425-438.
-
(1996)
European Journal of Operational Research
, vol.94
, pp. 425-438
-
-
Pham, H.1
Wang, H.2
-
11
-
-
0022613610
-
Optimal Lot Sizing, process quality improvement and setup cost reduction
-
Porteus, E.L. (1986), 'Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction', Operation Research, 34, 137-144.
-
(1986)
Operation Research
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
12
-
-
0031648198
-
A generalized economic model for joint determination of production run, inspection schedule and control chart design
-
Rahim, M.A., and Ben-Daya, M. (1998), 'A Generalized Economic Model for Joint Determination of Production Run, Inspection Schedule and Control Chart Design', International Journal of Production Research, 36, 277-289.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 277-289
-
-
Rahim, M.A.1
Ben-Daya, M.2
-
13
-
-
0022676316
-
Economic production cycles with imperfect production process
-
Rosenblatt, M.J., and Lee, H.L. (1986), 'Economic Production Cycles With Imperfect Production Process', IIE Transactions, 18, 48-55.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
14
-
-
1642301525
-
Optimal lot-sizing problem with imperfect maintenance and imperfect production
-
Sheu, S.H., and Chen, J.A. (2004), 'Optimal Lot-sizing Problem With Imperfect Maintenance and Imperfect Production', International Journal of Systems Science, 35(1), 69-77.
-
(2004)
International Journal of Systems Science
, vol.35
, Issue.1
, pp. 69-77
-
-
Sheu, S.H.1
Chen, J.A.2
-
15
-
-
13844280450
-
Optimal periodic replacement policy with checking time
-
Sheu, S.H., Chen, Y.C., and Teng, L.H. (2005), 'Optimal Periodic Replacement Policy With Checking Time', International Journal of Reliability, Quality and Safety Engineering, 12(1), 19-29.
-
(2005)
International Journal of Reliability, Quality and Safety Engineering
, vol.12
, Issue.1
, pp. 19-29
-
-
Sheu, S.H.1
Chen, Y.C.2
Teng, L.H.3
-
16
-
-
0032117210
-
Imperfect maintenance for deteriorating production systems
-
Tseng, S.T., Yeh, R.H., and Ho, W.T. (1998), 'Imperfect Maintenance for Deteriorating Production Systems', International Journal of Production Economics, 55, 191-201.
-
(1998)
International Journal of Production Economics
, vol.55
, pp. 191-201
-
-
Tseng, S.T.1
Yeh, R.H.2
Ho, W.T.3
-
17
-
-
10444289915
-
Integrated production and product inspection policy for a deteriorating production system
-
Wang, C.H. (2005), 'Integrated Production and Product Inspection Policy for a Deteriorating Production System', International Journal of Production Economics, 95, 123-134.
-
(2005)
International Journal of Production Economics
, vol.95
, pp. 123-134
-
-
Wang, C.H.1
|