-
2
-
-
78649867027
-
Generation of a New Dispatching Rule for the Mean Tardiness Job Shop Scheduling Problem through the Application of Machine Learning Concepts
-
In Japanese
-
D. Huang, T. Enkawa and M. Akiba, "Generation of a New Dispatching Rule for the Mean Tardiness Job Shop Scheduling Problem through the Application of Machine Learning Concepts", Journal of Japan Industrial Management Association, Vol.41(6), pp.383-389, 1991 (In Japanese).
-
(1991)
Journal of Japan Industrial Management Association
, vol.41
, Issue.6
, pp. 383-389
-
-
Huang, D.1
Enkawa, T.2
Akiba, M.3
-
3
-
-
67650687540
-
Progressive Strategies for Monte Carlo Tree Search
-
G. Chaslot, M. Winands, J. Uiterwijk and H. Van der Herik, "Progressive Strategies for Monte Carlo Tree Search", Proc. of the 10th Joint Conference on Information Sciences, pp.655-661, 2007.
-
(2007)
Proc. of the 10th Joint Conference on Information Sciences
, pp. 655-661
-
-
Chaslot, G.1
Winands, M.2
Uiterwijk, J.3
Van Der Herik, H.4
-
4
-
-
0034690558
-
Analytical Models to Predict the Performance of Single-Machine System under Periodic and Event-Driven Rescheduling Strategies
-
G. Vieira, J. Herrmann and E. Lin, "Analytical Models to Predict the Performance of Single-Machine System under Periodic and Event-Driven Rescheduling Strategies", International Journal of Production Research, Vol.38, No.8, pp.1899-1915, 2000!%
-
(2000)
International Journal of Production Research
, vol.38
, Issue.8
, pp. 1899-1915
-
-
Vieira, G.1
Herrmann, J.2
Lin, E.3
-
5
-
-
0242485199
-
Reactive Scheduling in a Dynamic and Stochastic FMS Environment
-
I. Sabuncuoglu and O. Kizililsik, "Reactive Scheduling in a Dynamic and Stochastic FMS Environment," International journal of production research, Vol.41, No. 17, pp.4211-4231, 2003.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.17
, pp. 4211-4231
-
-
Sabuncuoglu, I.1
Kizililsik, O.2
-
7
-
-
67651165551
-
Two Proposed Algorithms for Re-Entrant Flow Shop Problem
-
In Japanese
-
K. Abe and K. Ida, "Two Proposed Algorithms for Re-Entrant Flow Shop Problem", Transactions on Electronics, Information and Systems, Vol. 129(4), pp.720-725, 2009 (In Japanese).
-
(2009)
Transactions on Electronics, Information and Systems
, vol.129
, Issue.4
, pp. 720-725
-
-
Abe, K.1
Ida, K.2
-
8
-
-
78649872155
-
Genetics-Based Machine Learning Approach for Flexible Shop Scheduling Problems: Rule Acquisition for Real-time Scheduling
-
In Japanese
-
K. Sakakibara, H. Tamaki, H. Murao and S. Kitamura, "Genetics-Based Machine Learning Approach for Flexible Shop Scheduling Problems: Rule Acquisition for Real-time Scheduling ", IPSJ Journal, Vol.45, No.2, pp.91-98 2004 (In Japanese).
-
(2004)
IPSJ Journal
, vol.45
, Issue.2
, pp. 91-98
-
-
Sakakibara, K.1
Tamaki, H.2
Murao, H.3
Kitamura, S.4
-
10
-
-
78651412780
-
Studies on Imperfect-Information Games
-
In Japanese
-
M. Sakuta, "Studies on Imperfect-Information Games," Operations Research, Vol.52, No.l, pp.27-34, 2007 (In Japanese).
-
(2007)
Operations Research
, vol.52
, Issue.50
, pp. 27-34
-
-
Sakuta, M.1
-
11
-
-
78649814982
-
Addressing NP-Complete Puzzles with Monte-Carlo Methods
-
M. Schadd, M. Winands, H. van den Herik and H. Aldewereld, "Addressing NP-Complete Puzzles with Monte-Carlo Methods." Proc. of the AISB 2008 Symposium on Logic and the Simulation of Interaction and Reasoning, Vol. 9, pp.55-61, 2008.
-
(2008)
Proc. of the AISB 2008 Symposium on Logic and the Simulation of Interaction and Reasoning
, vol.9
, pp. 55-61
-
-
Schadd, M.1
Winands, M.2
Van Den Herik, H.3
Aldewereld, H.4
-
12
-
-
55249099113
-
Monte-Carlo Tree Search Solver
-
M. Winands, Y. Bjornsson and J. Saito, "Monte-Carlo Tree Search Solver," Computers and Games, Vol.5131, pp.25-36, 2008.
-
(2008)
Computers and Games
, vol.5131
, pp. 25-36
-
-
Winands, M.1
Bjornsson, Y.2
Saito, J.3
-
13
-
-
78649892475
-
Tree Based Algorithm for the Flow-shop Model to Maximize Number of Just-In-Time Jobs
-
N. Honda, H. Ishii and T. Masuda, "Tree Based Algorithm for the Flow-shop Model to Maximize Number of Just-In-Time Jobs", Scienliae Malhematicae Japonicae, Vol.61(2), pp.371-378, 2005.
-
(2005)
Scienliae Malhematicae Japonicae
, vol.61
, Issue.2
, pp. 371-378
-
-
Honda, N.1
Ishii, H.2
Masuda, T.3
-
15
-
-
38049037928
-
Efficient Selectivity and Backup Operators in Monte-Carlo Tree Search
-
R. Coulom, "Efficient Selectivity and Backup Operators in Monte-Carlo Tree Search," Computers and Games, Vol.4630, pp.72-83, 2007.
-
(2007)
Computers and Games
, vol.4630
, pp. 72-83
-
-
Coulom, R.1
-
16
-
-
78649864466
-
An Acquisition of Scheduling Rules Based on Information of Task Location
-
In Japanese
-
S. Fujii, H. Suwa and H. Morita, "An Acquisition of Scheduling Rules Based on Information of Task Location", IPSJ SIG Technical Report , Vol.95(4), pp.1-8 1995 (In Japanese).
-
(1995)
IPSJ SIG Technical Report
, vol.95
, Issue.4
, pp. 1-8
-
-
Fujii, S.1
Suwa, H.2
Morita, H.3
-
18
-
-
34250659969
-
-
Technical Report RR-6062, INRIA
-
S. Gelly, Y. Wang, R. Munos and O. Teytaud, "Modification of UCT with Patterns in Monte-Carlo Go," Technical Report RR-6062, INRIA, 2006.
-
(2006)
Modification of UCT with Patterns in Monte-Carlo Go
-
-
Gelly, S.1
Wang, Y.2
Munos, R.3
Teytaud, O.4
-
19
-
-
54949095854
-
Business Process Analysis to Obtain Empirical Lot Sizing Rule in Printing Process
-
S. Matsumoto, N. Ueno, K. Okuhara and H. Ishii, "Business Process Analysis to Obtain Empirical Lot Sizing Rule in Printing Process", Proc. of 2008 IEEE Conference on Automation Science and Engineering, pp.59l-596, 2008.
-
(2008)
Proc. of 2008 IEEE Conference on Automation Science and Engineering
-
-
Matsumoto, S.1
Ueno, N.2
Okuhara, K.3
Ishii, H.4
-
20
-
-
71149113327
-
Design of Knowledge-Based Scheduling Solution Based on Expert's Technical Knowledge in Printing Process and Proposal of its Improvement
-
S Matsumoto, N Ueno, K Okuhara and H Ishii, "Design of Knowledge-Based Scheduling Solution Based on Expert's Technical Knowledge in Printing Process and Proposal of its Improvement", International Journal of Innovative Computing, Information and Control, Vol.5, No.11(B), pp.4125-4143, 2009.
-
(2009)
International Journal of Innovative Computing, Information and Control
, vol.5
, Issue.11 B
, pp. 4125-4143
-
-
Matsumoto, S.1
Ueno, N.2
Okuhara, K.3
Ishii, H.4
-
21
-
-
0026172827
-
Knowledge-based approaches for scheduling problems: A survey
-
S. Noronha and V Sarma, "Knowledge-based approaches for scheduling problems: a survey", IEEE Transactions on Knowledge and Data Engineering, Vol.3(2), pp.160-171, 2002.
-
(2002)
IEEE Transactions on Knowledge and Data Engineering
, vol.3
, Issue.2
, pp. 160-171
-
-
Noronha, S.1
Sarma, V.2
-
22
-
-
42949099160
-
The Complexity of Clickomania
-
T. Biedl, E. Demaine, M. Demaine, R. Fleischer, L. Jacobsen and J Munro, "The Complexity of Clickomania", Proc. ofMSRI Workshop on Combinatorial Games, pp.389-404, 2002.
-
(2002)
Proc. OfMSRI Workshop on Combinatorial Games
, pp. 389-404
-
-
Biedl, T.1
Demaine, E.2
Demaine, M.3
Fleischer, R.4
Jacobsen, L.5
Munro, J.6
-
23
-
-
78649861725
-
Bi-criteria Scheduling for Meeting Due-dates and Minimizing Setup Times Using the Mixture of a Genetic Algorithm and a Priority Rule: An Efficient Search Method by Changing the Characteristic of Priority rule
-
In Japanese
-
T. Eguchi, H. Kawai and F. Oba, "Bi-criteria Scheduling for Meeting Due-dates and Minimizing Setup Times Using the Mixture of a Genetic Algorithm and a Priority Rule: An Efficient Search Method by Changing the Characteristic of Priority rule", Journal of the Japan Society for Precision Engineering, Vol.72(3) pp.342-347 2006 (In Japanese).
-
(2006)
Journal of the Japan Society for Precision Engineering
, vol.72
, Issue.3
, pp. 342-347
-
-
Eguchi, T.1
Kawai, H.2
Oba, F.3
-
24
-
-
33244460071
-
Genetic Algorithm Based Reactive Scheduling: 2nd Report, Modification of Production Schedule for Additional Jobs
-
In Japanese
-
T. Sakaguchi, Y. Tanimizu and N. Sugimura, "Genetic Algorithm Based Reactive Scheduling : 2nd Report, Modification of Production Schedule for Additional Jobs," Transactions of the Japan Society of Mechanical Engineers. C, Vol.71(711), pp.3299-3305, 2005 (In Japanese).
-
(2005)
Transactions of the Japan Society of Mechanical Engineers. C
, vol.71
, Issue.711
, pp. 3299-3305
-
-
Sakaguchi, T.1
Tanimizu, Y.2
Sugimura, N.3
|