메뉴 건너뛰기




Volumn , Issue , 2010, Pages

Monte-Carlo tree search for a reentrant scheduling problem

Author keywords

[No Author keywords available]

Indexed keywords

BEST FIRST SEARCH; COMBINATORIAL OPTIMIZATION PROBLEMS; COMPUTER GO; EVALUATION FUNCTION; INFORMATION GAME; META HEURISTIC ALGORITHM; MONTE CARLO; NUMERICAL EXPERIMENTS; OBJECTIVE FUNCTIONS; PRACTICAL PROBLEMS; PSEUDO RANDOM; SCHEDULING PROBLEM; SEARCH SPACES; SIMULATION STRATEGIES; TREE SEARCH; TWO-PLAYER GAMES;

EID: 78651429601     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICCIE.2010.5668320     Document Type: Conference Paper
Times cited : (11)

References (24)
  • 2
    • 78649867027 scopus 로고
    • Generation of a New Dispatching Rule for the Mean Tardiness Job Shop Scheduling Problem through the Application of Machine Learning Concepts
    • In Japanese
    • D. Huang, T. Enkawa and M. Akiba, "Generation of a New Dispatching Rule for the Mean Tardiness Job Shop Scheduling Problem through the Application of Machine Learning Concepts", Journal of Japan Industrial Management Association, Vol.41(6), pp.383-389, 1991 (In Japanese).
    • (1991) Journal of Japan Industrial Management Association , vol.41 , Issue.6 , pp. 383-389
    • Huang, D.1    Enkawa, T.2    Akiba, M.3
  • 4
    • 0034690558 scopus 로고    scopus 로고
    • Analytical Models to Predict the Performance of Single-Machine System under Periodic and Event-Driven Rescheduling Strategies
    • G. Vieira, J. Herrmann and E. Lin, "Analytical Models to Predict the Performance of Single-Machine System under Periodic and Event-Driven Rescheduling Strategies", International Journal of Production Research, Vol.38, No.8, pp.1899-1915, 2000!%
    • (2000) International Journal of Production Research , vol.38 , Issue.8 , pp. 1899-1915
    • Vieira, G.1    Herrmann, J.2    Lin, E.3
  • 5
    • 0242485199 scopus 로고    scopus 로고
    • Reactive Scheduling in a Dynamic and Stochastic FMS Environment
    • I. Sabuncuoglu and O. Kizililsik, "Reactive Scheduling in a Dynamic and Stochastic FMS Environment," International journal of production research, Vol.41, No. 17, pp.4211-4231, 2003.
    • (2003) International Journal of Production Research , vol.41 , Issue.17 , pp. 4211-4231
    • Sabuncuoglu, I.1    Kizililsik, O.2
  • 7
    • 67651165551 scopus 로고    scopus 로고
    • Two Proposed Algorithms for Re-Entrant Flow Shop Problem
    • In Japanese
    • K. Abe and K. Ida, "Two Proposed Algorithms for Re-Entrant Flow Shop Problem", Transactions on Electronics, Information and Systems, Vol. 129(4), pp.720-725, 2009 (In Japanese).
    • (2009) Transactions on Electronics, Information and Systems , vol.129 , Issue.4 , pp. 720-725
    • Abe, K.1    Ida, K.2
  • 8
    • 78649872155 scopus 로고    scopus 로고
    • Genetics-Based Machine Learning Approach for Flexible Shop Scheduling Problems: Rule Acquisition for Real-time Scheduling
    • In Japanese
    • K. Sakakibara, H. Tamaki, H. Murao and S. Kitamura, "Genetics-Based Machine Learning Approach for Flexible Shop Scheduling Problems: Rule Acquisition for Real-time Scheduling ", IPSJ Journal, Vol.45, No.2, pp.91-98 2004 (In Japanese).
    • (2004) IPSJ Journal , vol.45 , Issue.2 , pp. 91-98
    • Sakakibara, K.1    Tamaki, H.2    Murao, H.3    Kitamura, S.4
  • 10
    • 78651412780 scopus 로고    scopus 로고
    • Studies on Imperfect-Information Games
    • In Japanese
    • M. Sakuta, "Studies on Imperfect-Information Games," Operations Research, Vol.52, No.l, pp.27-34, 2007 (In Japanese).
    • (2007) Operations Research , vol.52 , Issue.50 , pp. 27-34
    • Sakuta, M.1
  • 13
    • 78649892475 scopus 로고    scopus 로고
    • Tree Based Algorithm for the Flow-shop Model to Maximize Number of Just-In-Time Jobs
    • N. Honda, H. Ishii and T. Masuda, "Tree Based Algorithm for the Flow-shop Model to Maximize Number of Just-In-Time Jobs", Scienliae Malhematicae Japonicae, Vol.61(2), pp.371-378, 2005.
    • (2005) Scienliae Malhematicae Japonicae , vol.61 , Issue.2 , pp. 371-378
    • Honda, N.1    Ishii, H.2    Masuda, T.3
  • 15
    • 38049037928 scopus 로고    scopus 로고
    • Efficient Selectivity and Backup Operators in Monte-Carlo Tree Search
    • R. Coulom, "Efficient Selectivity and Backup Operators in Monte-Carlo Tree Search," Computers and Games, Vol.4630, pp.72-83, 2007.
    • (2007) Computers and Games , vol.4630 , pp. 72-83
    • Coulom, R.1
  • 16
    • 78649864466 scopus 로고
    • An Acquisition of Scheduling Rules Based on Information of Task Location
    • In Japanese
    • S. Fujii, H. Suwa and H. Morita, "An Acquisition of Scheduling Rules Based on Information of Task Location", IPSJ SIG Technical Report , Vol.95(4), pp.1-8 1995 (In Japanese).
    • (1995) IPSJ SIG Technical Report , vol.95 , Issue.4 , pp. 1-8
    • Fujii, S.1    Suwa, H.2    Morita, H.3
  • 20
    • 71149113327 scopus 로고    scopus 로고
    • Design of Knowledge-Based Scheduling Solution Based on Expert's Technical Knowledge in Printing Process and Proposal of its Improvement
    • S Matsumoto, N Ueno, K Okuhara and H Ishii, "Design of Knowledge-Based Scheduling Solution Based on Expert's Technical Knowledge in Printing Process and Proposal of its Improvement", International Journal of Innovative Computing, Information and Control, Vol.5, No.11(B), pp.4125-4143, 2009.
    • (2009) International Journal of Innovative Computing, Information and Control , vol.5 , Issue.11 B , pp. 4125-4143
    • Matsumoto, S.1    Ueno, N.2    Okuhara, K.3    Ishii, H.4
  • 23
    • 78649861725 scopus 로고    scopus 로고
    • Bi-criteria Scheduling for Meeting Due-dates and Minimizing Setup Times Using the Mixture of a Genetic Algorithm and a Priority Rule: An Efficient Search Method by Changing the Characteristic of Priority rule
    • In Japanese
    • T. Eguchi, H. Kawai and F. Oba, "Bi-criteria Scheduling for Meeting Due-dates and Minimizing Setup Times Using the Mixture of a Genetic Algorithm and a Priority Rule: An Efficient Search Method by Changing the Characteristic of Priority rule", Journal of the Japan Society for Precision Engineering, Vol.72(3) pp.342-347 2006 (In Japanese).
    • (2006) Journal of the Japan Society for Precision Engineering , vol.72 , Issue.3 , pp. 342-347
    • Eguchi, T.1    Kawai, H.2    Oba, F.3
  • 24
    • 33244460071 scopus 로고    scopus 로고
    • Genetic Algorithm Based Reactive Scheduling: 2nd Report, Modification of Production Schedule for Additional Jobs
    • In Japanese
    • T. Sakaguchi, Y. Tanimizu and N. Sugimura, "Genetic Algorithm Based Reactive Scheduling : 2nd Report, Modification of Production Schedule for Additional Jobs," Transactions of the Japan Society of Mechanical Engineers. C, Vol.71(711), pp.3299-3305, 2005 (In Japanese).
    • (2005) Transactions of the Japan Society of Mechanical Engineers. C , vol.71 , Issue.711 , pp. 3299-3305
    • Sakaguchi, T.1    Tanimizu, Y.2    Sugimura, N.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.