-
2
-
-
33645857376
-
Regional strategy and performance in the global automotive industry
-
A. Verbeke and P. Brugman, Regional strategy and performance in the global automotive industry, Research in Global Strategic Management, vol.11, pp.97-117, 2005.
-
(2005)
Research in Global Strategic Management
, vol.11
, pp. 97-117
-
-
Verbeke, A.1
Brugman, P.2
-
3
-
-
63649153086
-
A Q-learning system for container transfer scheduling based on shipping order at container terminals
-
Y. Hirashima, A Q-learning system for container transfer scheduling based on shipping order at container terminals, Int. J. of Innovative Computing, Information and Control, vol.4, no.3, pp.547-558, 2008.
-
(2008)
Int. J. of Innovative Computing, Information and Control
, vol.4
, Issue.3
, pp. 547-558
-
-
Hirashima, Y.1
-
4
-
-
48249144997
-
Adaptive genetic algorithms for multi-resource constrained project scheduling problem with multiple Modes
-
K. Kim M. Gen and M. Kim, Adaptive genetic algorithms for multi-resource constrained project scheduling problem with multiple Modes, Int. J. of Innovative Computing, Information and Control, vol.2, no.1, pp.41-49, 2006.
-
(2006)
Int. J. of Innovative Computing, Information and Control
, vol.2
, Issue.1
, pp. 41-49
-
-
Kim, K.1
Gen, M.2
Kim, M.3
-
5
-
-
63649103595
-
Optimal maintenance scheduling by average system availability through appropriate segmentation of maintenance intervals
-
S. Goto, Y. Onizuka and M. Nakamura, Optimal maintenance scheduling by average system availability through appropriate segmentation of maintenance intervals, Int. J. of Innovative Computing, Information and Control, vol.2, no.5, pp.1083-1096, 2006.
-
(2006)
Int. J. of Innovative Computing, Information and Control
, vol.2
, Issue.5
, pp. 1083-1096
-
-
Goto, S.1
Onizuka, Y.2
Nakamura, M.3
-
6
-
-
63549083213
-
Distributed optimization method for simultaneous production scheduling and transportation routing in semiconductor fabrication bays
-
T. Furusho, T. Nishi and M. Konishi, Distributed optimization method for simultaneous production scheduling and transportation routing in semiconductor fabrication bays, Int. J. of Innovative Computing, Information and Control, vol.4, no.3, pp.559-575, 2008.
-
(2008)
Int. J. of Innovative Computing, Information and Control
, vol.4
, Issue.3
, pp. 559-575
-
-
Furusho, T.1
Nishi, T.2
Konishi, M.3
-
7
-
-
63649102095
-
Parametric analysis of bi-criterion single machine scheduling with a learning effect
-
P. Chang, S. Chen and V. Mani, Parametric analysis of bi-criterion single machine scheduling with a learning effect, Int. J. of Innovative Computing, Information and Control, vol.4, no.8, pp.2033-2043, 2008.
-
(2008)
Int. J. of Innovative Computing, Information and Control
, vol.4
, Issue.8
, pp. 2033-2043
-
-
Chang, P.1
Chen, S.2
Mani, V.3
-
8
-
-
64349113361
-
Fuzzy feedback scheduling of resource-constrained embedded control systems
-
F. Xia, Y. Sun, Y. Tian, M. Tade and J. Dong, Fuzzy feedback scheduling of resource-constrained embedded control systems, Int. J. of Innovative Computing, Information and Control, Vol.5, No.2, pp.311-321, 2009.
-
(2009)
Int. J. of Innovative Computing, Information and Control
, vol.5
, Issue.2
, pp. 311-321
-
-
Xia, F.1
Sun, Y.2
Tian, Y.3
Tade, M.4
Dong, J.5
-
9
-
-
71149100306
-
Formulation and approximate solution method of production planning problem for considering lot sizing in actual print process
-
CD-ROM (JL029)
-
N. Ueno, S. Matsumoto, K. Okuhara and T. Tanaka, Formulation and approximate solution method of production planning problem for considering lot sizing in actual print process, Proc. of the JUSFA, CD-ROM (JL029), 2004.
-
(2004)
Proc. of the JUSFA
-
-
Ueno, N.1
Matsumoto, S.2
Okuhara, K.3
Tanaka, T.4
-
10
-
-
19344375183
-
Proposal of heuristic algorithm for scheduling of print process in auto parts supplier
-
Series C
-
S. Matsumoto, K. Okuhara, N. Ueno and H. Ishii, Proposal of heuristic algorithm for scheduling of print process in auto parts supplier, JSME International Journal, Series C, vol.48, no.1, pp.8-14, 2005.
-
(2005)
JSME International Journal
, vol.48
, Issue.1
, pp. 8-14
-
-
Matsumoto, S.1
Okuhara, K.2
Ueno, N.3
Ishii, H.4
-
12
-
-
0029354494
-
The economic lot and delivery scheduling problem : PPPPowers of two policies
-
H. Huho and C. Yano, The economic lot and delivery scheduling problem : Powers of two policies, Journal of Transportation science, vol.29, no.3, pp.222-241, 1995.
-
(1995)
Journal of Transportation Science
, vol.29
, Issue.3
, pp. 222-241
-
-
Huho, H.1
Yano, C.2
-
13
-
-
0027146758
-
Adressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
-
B. MacCarthy and J. Liu, Adressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling, Int. J. of Production Research, vol.31, no.1, pp.59-79, 1993.
-
(1993)
Int. J. of Production Research
, vol.31
, Issue.1
, pp. 59-79
-
-
MacCarthy, B.1
Liu, J.2
-
14
-
-
0037061455
-
Design of a suitable production management system for a manufacturing company
-
11
-
Y. Lejtman, E. Shayan and R. Nagarajah, Design of a suitable production management system for a manufacturing company, Computers & Industrial Engineering, vol.42, nos.2-4, 11, pp.169-174, 2002.
-
(2002)
Computers & Industrial Engineering
, vol.42
, Issue.2-4
, pp. 169-174
-
-
Lejtman, Y.1
Shayan, E.2
Nagarajah, R.3
-
16
-
-
4344625957
-
Agile manufacturing systems in the automotive industry
-
D. Elkins, N. Huang and J. Alden, Agile manufacturing systems in the automotive industry, Int. J. of Production Economics, vol.91, no.3, pp.201-214, 2004.
-
(2004)
Int. J. of Production Economics
, vol.91
, Issue.3
, pp. 201-214
-
-
Elkins, D.1
Huang, N.2
Alden, J.3
-
17
-
-
2642532761
-
Business process modelling: Review and framework
-
R. Ruth Sara Aguilar-Saven, Business process modelling: Review and framework, Int. J. of Production Economics, vol.90, no.2, pp.129-149, 2004.
-
(2004)
Int. J. of Production Economics
, vol.90
, Issue.2
, pp. 129-149
-
-
Aguilar-Saven, R.R.S.1
-
20
-
-
0033700686
-
Lot-sizing problems: Modelling issues and a specialized branch-and-cut system BC-PROD
-
G. Belvaux and L. Wolsey, Lot-sizing problems: Modelling issues and a specialized branch-and-cut system BC-PROD, Management Science, vol.46, pp.724-738, 2000.
-
(2000)
Management Science
, vol.46
, pp. 724-738
-
-
Belvaux, G.1
Wolsey, L.2
-
22
-
-
33744517681
-
Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry
-
C. Silva and J. Magalhaes, Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry, Computers & Industrial Engineering, vol.50, no.1-2, pp.76-89, 2006.
-
(2006)
Computers & Industrial Engineering
, vol.50
, Issue.1-2
, pp. 76-89
-
-
Silva, C.1
Magalhaes, J.2
-
23
-
-
16244389992
-
Single item lot sizing problems
-
1
-
N. Brahimi, S. Dauzere-Peres, N. Najid and A. Nordli, Single item lot sizing problems, European Journal of Operational Research, vol.168, no.1, 1 pp.1-16, 2006.
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.1
, pp. 1-16
-
-
Brahimi, N.1
Dauzere-Peres, S.2
Najid, N.3
Nordli, A.4
|