메뉴 건너뛰기




Volumn 5, Issue 11, 2009, Pages 4125-4143

Design of knowledge-based scheduling solution based on expert's technical knowledge in printing process and proposal of its improvement

Author keywords

Business process analysis; Expert's technical knowledge; Knowledge based scheduling software; Minimization of setup operations; Printing process

Indexed keywords

AUTOMOBILE PARTS; BUSINESS PROCESS; BUSINESS PROCESS ANALYSIS; EFFECTIVE SOLUTION; FINISHED PRODUCTS; IDLE TIME; IMPLICIT KNOWLEDGE; KNOW-HOW; LEADTIME; META HEURISTICS; ON-SITE WORKERS; PARAMETER-TUNING; PRINTING PROCESS; PRODUCTION CONDITION; PRODUCTION EFFICIENCY; PRODUCTION FIELDS; PRODUCTION PROCESS; PRODUCTION SCHEDULING; SCHEDULING PROBLEM; SCHEDULING SOFTWARE; SELECTION RULES; SOLUTION METHODS; TACIT KNOWLEDGE; THEORETICAL ASPECTS;

EID: 71149113327     PISSN: 13494198     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Conference Paper
Times cited : (7)

References (23)
  • 2
    • 33645857376 scopus 로고    scopus 로고
    • Regional strategy and performance in the global automotive industry
    • A. Verbeke and P. Brugman, Regional strategy and performance in the global automotive industry, Research in Global Strategic Management, vol.11, pp.97-117, 2005.
    • (2005) Research in Global Strategic Management , vol.11 , pp. 97-117
    • Verbeke, A.1    Brugman, P.2
  • 3
    • 63649153086 scopus 로고    scopus 로고
    • A Q-learning system for container transfer scheduling based on shipping order at container terminals
    • Y. Hirashima, A Q-learning system for container transfer scheduling based on shipping order at container terminals, Int. J. of Innovative Computing, Information and Control, vol.4, no.3, pp.547-558, 2008.
    • (2008) Int. J. of Innovative Computing, Information and Control , vol.4 , Issue.3 , pp. 547-558
    • Hirashima, Y.1
  • 4
    • 48249144997 scopus 로고    scopus 로고
    • Adaptive genetic algorithms for multi-resource constrained project scheduling problem with multiple Modes
    • K. Kim M. Gen and M. Kim, Adaptive genetic algorithms for multi-resource constrained project scheduling problem with multiple Modes, Int. J. of Innovative Computing, Information and Control, vol.2, no.1, pp.41-49, 2006.
    • (2006) Int. J. of Innovative Computing, Information and Control , vol.2 , Issue.1 , pp. 41-49
    • Kim, K.1    Gen, M.2    Kim, M.3
  • 5
    • 63649103595 scopus 로고    scopus 로고
    • Optimal maintenance scheduling by average system availability through appropriate segmentation of maintenance intervals
    • S. Goto, Y. Onizuka and M. Nakamura, Optimal maintenance scheduling by average system availability through appropriate segmentation of maintenance intervals, Int. J. of Innovative Computing, Information and Control, vol.2, no.5, pp.1083-1096, 2006.
    • (2006) Int. J. of Innovative Computing, Information and Control , vol.2 , Issue.5 , pp. 1083-1096
    • Goto, S.1    Onizuka, Y.2    Nakamura, M.3
  • 6
    • 63549083213 scopus 로고    scopus 로고
    • Distributed optimization method for simultaneous production scheduling and transportation routing in semiconductor fabrication bays
    • T. Furusho, T. Nishi and M. Konishi, Distributed optimization method for simultaneous production scheduling and transportation routing in semiconductor fabrication bays, Int. J. of Innovative Computing, Information and Control, vol.4, no.3, pp.559-575, 2008.
    • (2008) Int. J. of Innovative Computing, Information and Control , vol.4 , Issue.3 , pp. 559-575
    • Furusho, T.1    Nishi, T.2    Konishi, M.3
  • 7
    • 63649102095 scopus 로고    scopus 로고
    • Parametric analysis of bi-criterion single machine scheduling with a learning effect
    • P. Chang, S. Chen and V. Mani, Parametric analysis of bi-criterion single machine scheduling with a learning effect, Int. J. of Innovative Computing, Information and Control, vol.4, no.8, pp.2033-2043, 2008.
    • (2008) Int. J. of Innovative Computing, Information and Control , vol.4 , Issue.8 , pp. 2033-2043
    • Chang, P.1    Chen, S.2    Mani, V.3
  • 9
    • 71149100306 scopus 로고    scopus 로고
    • Formulation and approximate solution method of production planning problem for considering lot sizing in actual print process
    • CD-ROM (JL029)
    • N. Ueno, S. Matsumoto, K. Okuhara and T. Tanaka, Formulation and approximate solution method of production planning problem for considering lot sizing in actual print process, Proc. of the JUSFA, CD-ROM (JL029), 2004.
    • (2004) Proc. of the JUSFA
    • Ueno, N.1    Matsumoto, S.2    Okuhara, K.3    Tanaka, T.4
  • 10
    • 19344375183 scopus 로고    scopus 로고
    • Proposal of heuristic algorithm for scheduling of print process in auto parts supplier
    • Series C
    • S. Matsumoto, K. Okuhara, N. Ueno and H. Ishii, Proposal of heuristic algorithm for scheduling of print process in auto parts supplier, JSME International Journal, Series C, vol.48, no.1, pp.8-14, 2005.
    • (2005) JSME International Journal , vol.48 , Issue.1 , pp. 8-14
    • Matsumoto, S.1    Okuhara, K.2    Ueno, N.3    Ishii, H.4
  • 12
    • 0029354494 scopus 로고
    • The economic lot and delivery scheduling problem : PPPPowers of two policies
    • H. Huho and C. Yano, The economic lot and delivery scheduling problem : Powers of two policies, Journal of Transportation science, vol.29, no.3, pp.222-241, 1995.
    • (1995) Journal of Transportation Science , vol.29 , Issue.3 , pp. 222-241
    • Huho, H.1    Yano, C.2
  • 13
    • 0027146758 scopus 로고
    • Adressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • B. MacCarthy and J. Liu, Adressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling, Int. J. of Production Research, vol.31, no.1, pp.59-79, 1993.
    • (1993) Int. J. of Production Research , vol.31 , Issue.1 , pp. 59-79
    • MacCarthy, B.1    Liu, J.2
  • 14
    • 0037061455 scopus 로고    scopus 로고
    • Design of a suitable production management system for a manufacturing company
    • 11
    • Y. Lejtman, E. Shayan and R. Nagarajah, Design of a suitable production management system for a manufacturing company, Computers & Industrial Engineering, vol.42, nos.2-4, 11, pp.169-174, 2002.
    • (2002) Computers & Industrial Engineering , vol.42 , Issue.2-4 , pp. 169-174
    • Lejtman, Y.1    Shayan, E.2    Nagarajah, R.3
  • 16
    • 4344625957 scopus 로고    scopus 로고
    • Agile manufacturing systems in the automotive industry
    • D. Elkins, N. Huang and J. Alden, Agile manufacturing systems in the automotive industry, Int. J. of Production Economics, vol.91, no.3, pp.201-214, 2004.
    • (2004) Int. J. of Production Economics , vol.91 , Issue.3 , pp. 201-214
    • Elkins, D.1    Huang, N.2    Alden, J.3
  • 17
    • 2642532761 scopus 로고    scopus 로고
    • Business process modelling: Review and framework
    • R. Ruth Sara Aguilar-Saven, Business process modelling: Review and framework, Int. J. of Production Economics, vol.90, no.2, pp.129-149, 2004.
    • (2004) Int. J. of Production Economics , vol.90 , Issue.2 , pp. 129-149
    • Aguilar-Saven, R.R.S.1
  • 20
    • 0033700686 scopus 로고    scopus 로고
    • Lot-sizing problems: Modelling issues and a specialized branch-and-cut system BC-PROD
    • G. Belvaux and L. Wolsey, Lot-sizing problems: Modelling issues and a specialized branch-and-cut system BC-PROD, Management Science, vol.46, pp.724-738, 2000.
    • (2000) Management Science , vol.46 , pp. 724-738
    • Belvaux, G.1    Wolsey, L.2
  • 21
  • 22
    • 33744517681 scopus 로고    scopus 로고
    • Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry
    • C. Silva and J. Magalhaes, Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry, Computers & Industrial Engineering, vol.50, no.1-2, pp.76-89, 2006.
    • (2006) Computers & Industrial Engineering , vol.50 , Issue.1-2 , pp. 76-89
    • Silva, C.1    Magalhaes, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.