-
1
-
-
36048941732
-
Minimizing makespan in reentrant flow-shops using hybrid tabu search
-
Chen, J.S., J.C.H. Pan and C.K. Wu, 2007. Minimizing makespan in reentrant flow-shops using hybrid tabu search. Int. J. Adv. Manuf. Technol., 34: 353-361.
-
(2007)
Int. J. Adv. Manuf. Technol.
, vol.34
, pp. 353-361
-
-
Chen, J.S.1
Pan, J.C.H.2
Wu, C.K.3
-
2
-
-
70350572217
-
New multi-objective method to solve reentrant hybrid flow shop scheduling problem
-
Dugardin, F., F. Yalaoui and L. Amodeo, 2010. New multi-objective method to solve reentrant hybrid flow shop scheduling problem. Eur. J. Operational Res., 203: 22-31.
-
(2010)
Eur. J. Operational Res.
, vol.203
, pp. 22-31
-
-
Dugardin, F.1
Yalaoui, F.2
Amodeo, L.3
-
3
-
-
0004244246
-
-
North River Press, Croton-on-Hudson, NY, ISBN: 0884270610
-
Goldratt, E.M. and J. Cox, 1984. The Goal. North River Press, Croton-on-Hudson, NY, ISBN: 0884270610.
-
(1984)
The Goal.
-
-
Goldratt, E.M.1
Cox, J.2
-
5
-
-
10444234309
-
Heuristic dispatching rule to maximize TDD and IDD performance
-
Ho, T.F. and R.K. Li, 2004. Heuristic dispatching rule to maximize TDD and IDD performance. Int. J. Prod. Res., 42: 5133-5147.
-
(2004)
Int. J. Prod. Res.
, vol.42
, pp. 5133-5147
-
-
Ho, T.F.1
Li, R.K.2
-
6
-
-
73249141943
-
Research on enhancement of TOC simplified drum- buffer-rope system using novel generic procedures
-
Lee, J.H., J.G. Chang, C.H. Tsai and R.K. Li, 2010. Research on enhancement of TOC simplified drum- buffer-rope system using novel generic procedures. Expert Syst. Appl., 37: 3747-3754.
-
(2010)
Expert Syst. Appl.
, vol.37
, pp. 3747-3754
-
-
Lee, J.H.1
Chang, J.G.2
Tsai, C.H.3
Li, R.K.4
-
7
-
-
0038548528
-
Minimizing makespan in re-entrant permutation flow-shops
-
Pan, J.H. and J.S. Chen, 2003. Minimizing makespan in re-entrant permutation flow-shops. J. Operational Res. Soc, 54: 642-653.
-
(2003)
J. Operational Res. Soc
, vol.54
, pp. 642-653
-
-
Pan, J.H.1
Chen, J.S.2
-
10
-
-
0026414517
-
Buffer management: A diagnostic tool for production control
-
Schragenheim, E. And B. Ronen, 1991. Buffer management: A diagnostic tool for production control. Prod. Invent. Manage. J., 32: 74-79.
-
(1991)
Prod. Invent. Manage. J.
, vol.32
, pp. 74-79
-
-
Schragenheim, E.1
Ronen, B.2
-
11
-
-
0005276554
-
-
St. Lucie Press, Boca Raton, FL, ISBN: 1574442937
-
Schragenheim, E. and H.W. Dettmer, 2001. Manufacturing at Warp Speed: Optimizing Supply Chain Financial Performance. St. Lucie Press, Boca Raton, FL, ISBN: 1574442937.
-
(2001)
Manufacturing at Warp Speed: Optimizing Supply Chain Financial Performance
-
-
Schragenheim, E.1
Dettmer, H.W.2
-
14
-
-
33745117286
-
Modified drum-buffer- rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
-
Sirikrai, V. and P. Yenradee, 2006. Modified drum-buffer- rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation. Int. J. Prod. Res., 44: 3509-3531.
-
(2006)
Int. J. Prod. Res.
, vol.44
, pp. 3509-3531
-
-
Sirikrai, V.1
Yenradee, P.2
-
15
-
-
33847418712
-
The evolution of a management philosophy: The theory of constraints
-
Watson, K.J., J.H. Blackstone and S.C. Gardiner, 2007. The evolution of a management philosophy: The theory of constraints. J. Operational Manage., 25: 387-402.
-
(2007)
J. Operational Manage.
, vol.25
, pp. 387-402
-
-
Watson, K.J.1
Blackstone, J.H.2
Gardiner, S.C.3
-
16
-
-
32644479705
-
ADBR scheduling method for manufacturing environments with bottleneckre-entrant flows
-
Wu, H.H. and M.L. Yeh, 2006. ADBR scheduling method for manufacturing environments with bottleneck re-entrant flows. Int. J. Prod. Res., 44: 883-902.
-
(2006)
Int. J. Prod. Res.
, vol.44
, pp. 883-902
-
-
Wu, H.H.1
Yeh, M.L.2
-
17
-
-
39449115349
-
A capacity available-to- promise model for drum-buffer-rope systems
-
Wu, H.H. and J.Y. Liu, 2008. A capacity available-to- promise model for drum-buffer-rope systems. Int. J. Prod. Res., 46: 2255-2274.
-
(2008)
Int. J. Prod. Res.
, vol.46
, pp. 2255-2274
-
-
Wu, H.H.1
Liu, J.Y.2
-
18
-
-
0040524249
-
Robustness of various production control policies in semiconductor manufacturing
-
Yan, H., S. Lou and S.P. Sethi, 2000. Robustness of various production control policies in semiconductor manufacturing. Prod. Operations Manage., 9: 171-182.
-
(2000)
Prod. Operations Manage.
, vol.9
, pp. 171-182
-
-
Yan, H.1
Lou, S.2
Sethi, S.P.3
-
19
-
-
36849069984
-
Multi-family scheduling in a two-machine reentrant flow shop with setups
-
Yang, D.L., W.H. Kuo and M.S. Chern, 2008. Multi-family scheduling in a two-machine reentrant flow shop with setups. Eur. J. Operational Res., 187: 1160-1170.
-
(2008)
Eur. J. Operational Res.
, vol.187
, pp. 1160-1170
-
-
Yang, D.L.1
Kuo, W.H.2
Chern, M.S.3
|