메뉴 건너뛰기




Volumn 10, Issue 1, 2011, Pages 40-50

A modification of simplified drum-buffer-rope for re-entrant flow shop scheduling

Author keywords

Drum buffer rope; Flow shop; Re entry; Scheduling; Theory of constraints

Indexed keywords

MACHINE SHOP PRACTICE; REENTRY; ROPE;

EID: 78651364775     PISSN: 18125638     EISSN: 18125646     Source Type: Journal    
DOI: 10.3923/itj.2011.40.50     Document Type: Article
Times cited : (3)

References (19)
  • 1
    • 36048941732 scopus 로고    scopus 로고
    • Minimizing makespan in reentrant flow-shops using hybrid tabu search
    • Chen, J.S., J.C.H. Pan and C.K. Wu, 2007. Minimizing makespan in reentrant flow-shops using hybrid tabu search. Int. J. Adv. Manuf. Technol., 34: 353-361.
    • (2007) Int. J. Adv. Manuf. Technol. , vol.34 , pp. 353-361
    • Chen, J.S.1    Pan, J.C.H.2    Wu, C.K.3
  • 2
    • 70350572217 scopus 로고    scopus 로고
    • New multi-objective method to solve reentrant hybrid flow shop scheduling problem
    • Dugardin, F., F. Yalaoui and L. Amodeo, 2010. New multi-objective method to solve reentrant hybrid flow shop scheduling problem. Eur. J. Operational Res., 203: 22-31.
    • (2010) Eur. J. Operational Res. , vol.203 , pp. 22-31
    • Dugardin, F.1    Yalaoui, F.2    Amodeo, L.3
  • 3
    • 0004244246 scopus 로고
    • North River Press, Croton-on-Hudson, NY, ISBN: 0884270610
    • Goldratt, E.M. and J. Cox, 1984. The Goal. North River Press, Croton-on-Hudson, NY, ISBN: 0884270610.
    • (1984) The Goal.
    • Goldratt, E.M.1    Cox, J.2
  • 5
    • 10444234309 scopus 로고    scopus 로고
    • Heuristic dispatching rule to maximize TDD and IDD performance
    • Ho, T.F. and R.K. Li, 2004. Heuristic dispatching rule to maximize TDD and IDD performance. Int. J. Prod. Res., 42: 5133-5147.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 5133-5147
    • Ho, T.F.1    Li, R.K.2
  • 6
    • 73249141943 scopus 로고    scopus 로고
    • Research on enhancement of TOC simplified drum- buffer-rope system using novel generic procedures
    • Lee, J.H., J.G. Chang, C.H. Tsai and R.K. Li, 2010. Research on enhancement of TOC simplified drum- buffer-rope system using novel generic procedures. Expert Syst. Appl., 37: 3747-3754.
    • (2010) Expert Syst. Appl. , vol.37 , pp. 3747-3754
    • Lee, J.H.1    Chang, J.G.2    Tsai, C.H.3    Li, R.K.4
  • 7
    • 0038548528 scopus 로고    scopus 로고
    • Minimizing makespan in re-entrant permutation flow-shops
    • Pan, J.H. and J.S. Chen, 2003. Minimizing makespan in re-entrant permutation flow-shops. J. Operational Res. Soc, 54: 642-653.
    • (2003) J. Operational Res. Soc , vol.54 , pp. 642-653
    • Pan, J.H.1    Chen, J.S.2
  • 10
    • 0026414517 scopus 로고
    • Buffer management: A diagnostic tool for production control
    • Schragenheim, E. And B. Ronen, 1991. Buffer management: A diagnostic tool for production control. Prod. Invent. Manage. J., 32: 74-79.
    • (1991) Prod. Invent. Manage. J. , vol.32 , pp. 74-79
    • Schragenheim, E.1    Ronen, B.2
  • 14
    • 33745117286 scopus 로고    scopus 로고
    • Modified drum-buffer- rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
    • Sirikrai, V. and P. Yenradee, 2006. Modified drum-buffer- rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation. Int. J. Prod. Res., 44: 3509-3531.
    • (2006) Int. J. Prod. Res. , vol.44 , pp. 3509-3531
    • Sirikrai, V.1    Yenradee, P.2
  • 15
    • 33847418712 scopus 로고    scopus 로고
    • The evolution of a management philosophy: The theory of constraints
    • Watson, K.J., J.H. Blackstone and S.C. Gardiner, 2007. The evolution of a management philosophy: The theory of constraints. J. Operational Manage., 25: 387-402.
    • (2007) J. Operational Manage. , vol.25 , pp. 387-402
    • Watson, K.J.1    Blackstone, J.H.2    Gardiner, S.C.3
  • 16
    • 32644479705 scopus 로고    scopus 로고
    • ADBR scheduling method for manufacturing environments with bottleneckre-entrant flows
    • Wu, H.H. and M.L. Yeh, 2006. ADBR scheduling method for manufacturing environments with bottleneck re-entrant flows. Int. J. Prod. Res., 44: 883-902.
    • (2006) Int. J. Prod. Res. , vol.44 , pp. 883-902
    • Wu, H.H.1    Yeh, M.L.2
  • 17
    • 39449115349 scopus 로고    scopus 로고
    • A capacity available-to- promise model for drum-buffer-rope systems
    • Wu, H.H. and J.Y. Liu, 2008. A capacity available-to- promise model for drum-buffer-rope systems. Int. J. Prod. Res., 46: 2255-2274.
    • (2008) Int. J. Prod. Res. , vol.46 , pp. 2255-2274
    • Wu, H.H.1    Liu, J.Y.2
  • 18
    • 0040524249 scopus 로고    scopus 로고
    • Robustness of various production control policies in semiconductor manufacturing
    • Yan, H., S. Lou and S.P. Sethi, 2000. Robustness of various production control policies in semiconductor manufacturing. Prod. Operations Manage., 9: 171-182.
    • (2000) Prod. Operations Manage. , vol.9 , pp. 171-182
    • Yan, H.1    Lou, S.2    Sethi, S.P.3
  • 19
    • 36849069984 scopus 로고    scopus 로고
    • Multi-family scheduling in a two-machine reentrant flow shop with setups
    • Yang, D.L., W.H. Kuo and M.S. Chern, 2008. Multi-family scheduling in a two-machine reentrant flow shop with setups. Eur. J. Operational Res., 187: 1160-1170.
    • (2008) Eur. J. Operational Res. , vol.187 , pp. 1160-1170
    • Yang, D.L.1    Kuo, W.H.2    Chern, M.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.