-
1
-
-
1342330563
-
A study of the utilisation of capacity constrained resources in drum-buffer-rope systems
-
Atwater, J.B. and Chakravorty, S.S., A study of the utilisation of capacity constrained resources in drum-buffer-rope systems. Prod. Oper. Manage., 2002, 11(2), 259-273.
-
(2002)
Prod. Oper. Manage
, vol.11
, Issue.2
, pp. 259-273
-
-
Atwater, J.B.1
Chakravorty, S.S.2
-
2
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng, T.C.E. and Gupta, M.C., Survey of scheduling research involving due date determination decisions. Euro. J. Oper. Res., 1989, 38, 156-166.
-
(1989)
Euro. J. Oper. Res
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
3
-
-
0035737047
-
-
Corbett, T. and Csillag, J.M., Analysis of the effects of seven drum-buffer-rope implementations. Prod. Invent. Manage. J., 2001, 3rd/4th quarter, 17-23.
-
Corbett, T. and Csillag, J.M., Analysis of the effects of seven drum-buffer-rope implementations. Prod. Invent. Manage. J., 2001, 3rd/4th quarter, 17-23.
-
-
-
-
4
-
-
0004244246
-
-
North River: Croton-on-Hudson
-
Goldratt, E.M. and Cox, J., The Goal, 1986 (North River: Croton-on-Hudson).
-
(1986)
The Goal
-
-
Goldratt, E.M.1
Cox, J.2
-
7
-
-
0037118177
-
A survey of the state-of-the-art of common due date assignment and scheduling research
-
Gordon, V., Proth, J.M. and Chu, C., A survey of the state-of-the-art of common due date assignment and scheduling research. Euro. J. Oper. Res., 2002, 139, 1-25.
-
(2002)
Euro. J. Oper. Res
, vol.139
, pp. 1-25
-
-
Gordon, V.1
Proth, J.M.2
Chu, C.3
-
8
-
-
0031556588
-
-
Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system. Int. J. Prod. Econ, 1997, 53, 101-116
-
Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system. Int. J. Prod. Econ., 1997, 53, 101-116.
-
-
-
-
9
-
-
0036642989
-
An available-to-promise system for TFT LCD manufacturing in supply chain
-
Jeong, B., Sim, S.B., Jeong, H.S. and Kim, S.W., An available-to-promise system for TFT LCD manufacturing in supply chain. Comput. Indust. Eng., 2002, 43, 191-212.
-
(2002)
Comput. Indust. Eng
, vol.43
, pp. 191-212
-
-
Jeong, B.1
Sim, S.B.2
Jeong, H.S.3
Kim, S.W.4
-
11
-
-
13644284218
-
Real-time due-date promising by buildto-order environments
-
Moses, S., Grant, H., Gruenwald, L. and Pulat, S., Real-time due-date promising by buildto-order environments. Int. J. Prod. Res., 2004, 42(20), 4353-4375.
-
(2004)
Int. J. Prod. Res
, vol.42
, Issue.20
, pp. 4353-4375
-
-
Moses, S.1
Grant, H.2
Gruenwald, L.3
Pulat, S.4
-
12
-
-
33749076774
-
Available, capable, profitable
-
February
-
Muzumdar, M. and Deise, C., Available, capable, profitable. APICS-The Perform. Adv., 2003, February, 55-58.
-
(2003)
APICS-The Perform. Adv
, pp. 55-58
-
-
Muzumdar, M.1
Deise, C.2
-
14
-
-
0025699540
-
Drum-buffer-rope shop floor control
-
3rd quarter
-
Schragenheim, E. and Ronen, B., Drum-buffer-rope shop floor control. Prod. Invent. Manage. J., 1990, 3rd quarter, 18-23.
-
(1990)
Prod. Invent. Manage. J
, pp. 18-23
-
-
Schragenheim, E.1
Ronen, B.2
-
15
-
-
0026414517
-
Buffer management: A diagnostic tool for production control
-
2nd quarter
-
Schragenheim, E. and Ronen, B., Buffer management: a diagnostic tool for production control, Prod. Invent. Manage. J., 1991, 2nd quarter, 74-79.
-
(1991)
Prod. Invent. Manage. J
, pp. 74-79
-
-
Schragenheim, E.1
Ronen, B.2
-
16
-
-
0020500356
-
Due date selection procedures for job-shop simulation
-
Smith, M.L. and Seidmann, A., Due date selection procedures for job-shop simulation. Comput. Indust. Eng., 1983, 7(3), 199-207.
-
(1983)
Comput. Indust. Eng
, vol.7
, Issue.3
, pp. 199-207
-
-
Smith, M.L.1
Seidmann, A.2
-
17
-
-
0029260367
-
Master production scheduling development in a theory of constraints environment
-
1st quarter
-
Spencer, M.S. and Cox III, J.F., Master production scheduling development in a theory of constraints environment. Prod. Invent. Manage. J., 1995, 1st quarter, 8-14.
-
(1995)
Prod. Invent. Manage. J
, pp. 8-14
-
-
Spencer, M.S.1
Cox III, J.F.2
-
19
-
-
0031250232
-
Methodologies for rapid and effective response to requests for quotation (RFQs)
-
Veeramani, D. and Joshi, P., Methodologies for rapid and effective response to requests for quotation (RFQs). IIE Trans., 1997, 29, 825-838.
-
(1997)
IIE Trans
, vol.29
, pp. 825-838
-
-
Veeramani, D.1
Joshi, P.2
-
20
-
-
0027565391
-
Mixing static and dynamic flowtime estimates for due-date assignment
-
Vig, M.M. and Dooley, K.J., Mixing static and dynamic flowtime estimates for due-date assignment. J. Oper. Manage., 1993, 11, 67-79.
-
(1993)
J. Oper. Manage
, vol.11
, pp. 67-79
-
-
Vig, M.M.1
Dooley, K.J.2
-
21
-
-
0003929853
-
-
4th ed, Irwin/McGraw-Hill: New York, NY
-
Vollmann, T.E., Berry, W.L. and Whybark, D.C., Manufacturing Planning and Control Systems, 4th ed., 1997 (Irwin/McGraw-Hill: New York, NY).
-
(1997)
Manufacturing Planning and Control Systems
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.C.3
-
22
-
-
39449132301
-
A robust DBR management system
-
Beijing, China, 10-12 August
-
Wu, H.H., Lee, C.J. and Yang, C.J., A robust DBR management system, in Proceedings of 2005 IEEE Conference on Service Operations and Logistics, and Informatics, Tsinghua University, Beijing, China, 10-12 August 2005, pp. 230-235.
-
(2005)
Proceedings of 2005 IEEE Conference on Service Operations and Logistics, and Informatics, Tsinghua University
, pp. 230-235
-
-
Wu, H.H.1
Lee, C.J.2
Yang, C.J.3
|