메뉴 건너뛰기




Volumn 46, Issue 8, 2008, Pages 2255-2274

A capacity available-to-promise model for drum-buffer-rope systems

Author keywords

Available to promise (ATP); Capable to promise (CTP); Capacity available to promise (CATP); Drum buffer rope (DBR); Due date assignment; Order promising

Indexed keywords

INVENTORY CONTROL; MARKETING; MATHEMATICAL MODELS; PHASE DIAGRAMS; SCHEDULING;

EID: 39449115349     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540601039783     Document Type: Article
Times cited : (15)

References (22)
  • 1
    • 1342330563 scopus 로고    scopus 로고
    • A study of the utilisation of capacity constrained resources in drum-buffer-rope systems
    • Atwater, J.B. and Chakravorty, S.S., A study of the utilisation of capacity constrained resources in drum-buffer-rope systems. Prod. Oper. Manage., 2002, 11(2), 259-273.
    • (2002) Prod. Oper. Manage , vol.11 , Issue.2 , pp. 259-273
    • Atwater, J.B.1    Chakravorty, S.S.2
  • 2
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T.C.E. and Gupta, M.C., Survey of scheduling research involving due date determination decisions. Euro. J. Oper. Res., 1989, 38, 156-166.
    • (1989) Euro. J. Oper. Res , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 3
    • 0035737047 scopus 로고    scopus 로고
    • Corbett, T. and Csillag, J.M., Analysis of the effects of seven drum-buffer-rope implementations. Prod. Invent. Manage. J., 2001, 3rd/4th quarter, 17-23.
    • Corbett, T. and Csillag, J.M., Analysis of the effects of seven drum-buffer-rope implementations. Prod. Invent. Manage. J., 2001, 3rd/4th quarter, 17-23.
  • 4
    • 0004244246 scopus 로고
    • North River: Croton-on-Hudson
    • Goldratt, E.M. and Cox, J., The Goal, 1986 (North River: Croton-on-Hudson).
    • (1986) The Goal
    • Goldratt, E.M.1    Cox, J.2
  • 5
  • 7
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due date assignment and scheduling research
    • Gordon, V., Proth, J.M. and Chu, C., A survey of the state-of-the-art of common due date assignment and scheduling research. Euro. J. Oper. Res., 2002, 139, 1-25.
    • (2002) Euro. J. Oper. Res , vol.139 , pp. 1-25
    • Gordon, V.1    Proth, J.M.2    Chu, C.3
  • 8
    • 0031556588 scopus 로고    scopus 로고
    • Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system. Int. J. Prod. Econ, 1997, 53, 101-116
    • Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system. Int. J. Prod. Econ., 1997, 53, 101-116.
  • 9
    • 0036642989 scopus 로고    scopus 로고
    • An available-to-promise system for TFT LCD manufacturing in supply chain
    • Jeong, B., Sim, S.B., Jeong, H.S. and Kim, S.W., An available-to-promise system for TFT LCD manufacturing in supply chain. Comput. Indust. Eng., 2002, 43, 191-212.
    • (2002) Comput. Indust. Eng , vol.43 , pp. 191-212
    • Jeong, B.1    Sim, S.B.2    Jeong, H.S.3    Kim, S.W.4
  • 11
    • 13644284218 scopus 로고    scopus 로고
    • Real-time due-date promising by buildto-order environments
    • Moses, S., Grant, H., Gruenwald, L. and Pulat, S., Real-time due-date promising by buildto-order environments. Int. J. Prod. Res., 2004, 42(20), 4353-4375.
    • (2004) Int. J. Prod. Res , vol.42 , Issue.20 , pp. 4353-4375
    • Moses, S.1    Grant, H.2    Gruenwald, L.3    Pulat, S.4
  • 12
    • 33749076774 scopus 로고    scopus 로고
    • Available, capable, profitable
    • February
    • Muzumdar, M. and Deise, C., Available, capable, profitable. APICS-The Perform. Adv., 2003, February, 55-58.
    • (2003) APICS-The Perform. Adv , pp. 55-58
    • Muzumdar, M.1    Deise, C.2
  • 14
    • 0025699540 scopus 로고
    • Drum-buffer-rope shop floor control
    • 3rd quarter
    • Schragenheim, E. and Ronen, B., Drum-buffer-rope shop floor control. Prod. Invent. Manage. J., 1990, 3rd quarter, 18-23.
    • (1990) Prod. Invent. Manage. J , pp. 18-23
    • Schragenheim, E.1    Ronen, B.2
  • 15
    • 0026414517 scopus 로고
    • Buffer management: A diagnostic tool for production control
    • 2nd quarter
    • Schragenheim, E. and Ronen, B., Buffer management: a diagnostic tool for production control, Prod. Invent. Manage. J., 1991, 2nd quarter, 74-79.
    • (1991) Prod. Invent. Manage. J , pp. 74-79
    • Schragenheim, E.1    Ronen, B.2
  • 16
    • 0020500356 scopus 로고
    • Due date selection procedures for job-shop simulation
    • Smith, M.L. and Seidmann, A., Due date selection procedures for job-shop simulation. Comput. Indust. Eng., 1983, 7(3), 199-207.
    • (1983) Comput. Indust. Eng , vol.7 , Issue.3 , pp. 199-207
    • Smith, M.L.1    Seidmann, A.2
  • 17
    • 0029260367 scopus 로고
    • Master production scheduling development in a theory of constraints environment
    • 1st quarter
    • Spencer, M.S. and Cox III, J.F., Master production scheduling development in a theory of constraints environment. Prod. Invent. Manage. J., 1995, 1st quarter, 8-14.
    • (1995) Prod. Invent. Manage. J , pp. 8-14
    • Spencer, M.S.1    Cox III, J.F.2
  • 19
    • 0031250232 scopus 로고    scopus 로고
    • Methodologies for rapid and effective response to requests for quotation (RFQs)
    • Veeramani, D. and Joshi, P., Methodologies for rapid and effective response to requests for quotation (RFQs). IIE Trans., 1997, 29, 825-838.
    • (1997) IIE Trans , vol.29 , pp. 825-838
    • Veeramani, D.1    Joshi, P.2
  • 20
    • 0027565391 scopus 로고
    • Mixing static and dynamic flowtime estimates for due-date assignment
    • Vig, M.M. and Dooley, K.J., Mixing static and dynamic flowtime estimates for due-date assignment. J. Oper. Manage., 1993, 11, 67-79.
    • (1993) J. Oper. Manage , vol.11 , pp. 67-79
    • Vig, M.M.1    Dooley, K.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.