-
1
-
-
78650078933
-
A New Resource-constrained Multi-commodity Flow Model for Conflict-free Train Routing and Scheduling
-
G. Caimi, F. Chudak, M. Fuchsberger, and, M. Laumanns, A New Resource-constrained Multi-commodity Flow Model for Conflict-free Train Routing and Scheduling, Submitted for publication.
-
Submitted for Publication
-
-
Caimi, G.1
Chudak, F.2
Fuchsberger, M.3
Laumanns, M.4
-
2
-
-
59849104960
-
Design of a railway scheduling model for dense services
-
G. Caimi, T. Herrmann, D. Burkolter, F. Chudak, and, M. Laumanns, Design of a railway scheduling model for dense services, Networks Spatial Economics 9 (2009), 25-46.
-
(2009)
Networks Spatial Economics
, vol.9
, pp. 25-46
-
-
Caimi, G.1
Herrmann, T.2
Burkolter, D.3
Chudak, F.4
Laumanns, M.5
-
3
-
-
0036759198
-
Modeling and solving the train timetabling problem
-
A. Caprara, M. Fischetti, and, P. Toth, Modeling and solving the train timetabling problem, Oper Res 50 (2002), 851-861.
-
(2002)
Oper Res
, vol.50
, pp. 851-861
-
-
Caprara, A.1
Fischetti, M.2
Toth, P.3
-
4
-
-
0028530808
-
A model and strategy for train pathing with choice of lines, platforms, and routes
-
M. Carey, A model and strategy for train pathing with choice of lines, platforms, and routes, Transport Res B 28 (1994), 333-353.
-
(1994)
Transport Res B
, vol.28
, pp. 333-353
-
-
Carey, M.1
-
5
-
-
79952995084
-
A set-packing approach to routing trains through railway station
-
Georg August Universität Göttingen
-
M. Ehrgott, R. Velasquez, and, A. Schöbel, A set-packing approach to routing trains through railway station, Preprint nr. 2005-36, Georg August Universität Göttingen, 2005.
-
(2005)
Preprint Nr. 2005-36
-
-
Ehrgott, M.1
Velasquez, R.2
Schöbel, A.3
-
6
-
-
78650108367
-
-
C. Liebchen, R.K. Ahuja, and J.A. Mesa (Editors), ATMOS 2007, Dagstuhl Seminar Proceedings, IBFI, Schloss Dagstuhl, Germany
-
M. Fischetti, D. Salvagnin, and, A. Zanette, Fast approaches to robust railway timetabling, C. Liebchen, R.K. Ahuja, and, J.A. Mesa, (Editors), ATMOS 2007, Dagstuhl Seminar Proceedings, IBFI, Schloss Dagstuhl, Germany, 2007.
-
(2007)
Fast Approaches to Robust Railway Timetabling
-
-
Fischetti, M.1
Salvagnin, D.2
Zanette, A.3
-
8
-
-
0043207353
-
A variable trip time model for cyclic railway timetabling
-
L. Kroon, and, L. Peeters, A variable trip time model for cyclic railway timetabling, Transport Sci 37 (2003), 198-212.
-
(2003)
Transport Sci
, vol.37
, pp. 198-212
-
-
Kroon, L.1
Peeters, L.2
-
9
-
-
44249086435
-
Cyclic railway timetabling: A stochastic optimization approach
-
F. Geraets, L. Kroon, A. Schöbel, D. Wagner, and C. Zaroliagis (editors), Springer, Berlin
-
L.G. Kroon, R. Dekker, and, M.J.C.M. Vromans, Cyclic railway timetabling: a stochastic optimization approach, F. Geraets, L. Kroon, A. Schöbel, D. Wagner, and, C. Zaroliagis, (editors), Algorithmic methods for railway optimization, LNCS 4359, Springer, Berlin, 2007, pp. 41-66.
-
(2007)
Algorithmic Methods for Railway Optimization, LNCS 4359
, pp. 41-66
-
-
Kroon, L.G.1
Dekker, R.2
Vromans, M.J.C.M.3
-
10
-
-
69649098853
-
PULS 90 - Ein syste mumfassender Ansatz zur Leistungssteigerung von Eisenbahnnetzen
-
German
-
F. Laube, S. Roos, R. Wüst, M. Lüthi, and, U. Weidmann, PULS 90-ein syste mumfassender Ansatz zur Leistungssteigerung von Eisenbahnnetzen, Eisenbahn technische Rundschau 3 (2007), 104-107. In German.
-
(2007)
Eisenbahn Technische Rundschau
, vol.3
, pp. 104-107
-
-
Laube, F.1
Roos, S.2
Wüst, R.3
Lüthi, M.4
Weidmann, U.5
-
12
-
-
49949090088
-
The modeling power of the periodic event scheduling problem: Railway timetables - And beyond
-
F. Geraets, L. Kroon, A. Schöbel, D. Wagner, and C. Zaroliagis (editors), Springer, Berlin
-
C. Liebchen, and, R. Möhring, The modeling power of the periodic event scheduling problem: Railway timetables-and beyond, F. Geraets, L. Kroon, A. Schöbel, D. Wagner, and, C. Zaroliagis, (editors), Algorithmic methods for railway optimization, LNCS 4359, Springer, Berlin, 2007, pp. 3-40.
-
(2007)
Algorithmic Methods for Railway Optimization, LNCS 4359
, pp. 3-40
-
-
Liebchen, C.1
Möhring, R.2
-
13
-
-
56249113768
-
Integral cycle bases for cyclic timetabling
-
C. Liebchen, and, L. Peeters, Integral cycle bases for cyclic timetabling, Discr Optim 6 (2009), 98-109.
-
(2009)
Discr Optim
, vol.6
, pp. 98-109
-
-
Liebchen, C.1
Peeters, L.2
-
14
-
-
33751327777
-
Classes of cycle bases
-
C. Liebchen, and, R. Rizzi, Classes of cycle bases, Discr Appl Math 155 (2007), 337-355.
-
(2007)
Discr Appl Math
, vol.155
, pp. 337-355
-
-
Liebchen, C.1
Rizzi, R.2
-
15
-
-
70350618926
-
Computing delay resistant railway timetables
-
C. Liebchen, M. Schachtebeck, A. Schöbel, S. Stiller, and, A. Prigge, Computing delay resistant railway timetables, Comput Oper Res 37 (2010), 857-868.
-
(2010)
Comput Oper Res
, vol.37
, pp. 857-868
-
-
Liebchen, C.1
Schachtebeck, M.2
Schöbel, A.3
Stiller, S.4
Prigge, A.5
-
18
-
-
59749098403
-
Increasing railway capacity and reliability through integrated real-time rescheduling
-
Berkeley
-
M. Lüthi, A. Nash, U. Weidmann, F. Laube, and, R. Wüst, Increasing railway capacity and reliability through integrated real-time rescheduling, Proceedings of the 11th World Conference on Transport Research, Berkeley, 2007.
-
(2007)
Proceedings of the 11th World Conference on Transport Research
-
-
Lüthi, M.1
Nash, A.2
Weidmann, U.3
Laube, F.4
Wüst, R.5
-
19
-
-
78650114915
-
Describing and evaluating train services on the Swiss railway network from a new perspective
-
Monte Veritá, Ascona, September 12-14
-
V. Mahadevan, Describing and evaluating train services on the Swiss railway network from a new perspective, Proceedings of the 7th Swiss Transport Research Conference, Monte Veritá, Ascona, September 12-14, 2007.
-
(2007)
Proceedings of the 7th Swiss Transport Research Conference
-
-
Mahadevan, V.1
-
20
-
-
78650094576
-
-
MOSEK ApS, Copenhagen, Denmark. The MOSEK optimization manual, Version 5.0.0.57, Available at:
-
MOSEK ApS, Copenhagen, Denmark. The MOSEK optimization manual, Version 5.0.0.57, 2007, Available at:.
-
(2007)
-
-
-
22
-
-
0030143150
-
A genetic algorithm approach to periodic railway synchronization
-
K. Nachtigall, and, S. Voget, A genetic algorithm approach to periodic railway synchronization, Comput Oper Res 23 (1996), 453-463.
-
(1996)
Comput Oper Res
, vol.23
, pp. 453-463
-
-
Nachtigall, K.1
Voget, S.2
-
23
-
-
0030412990
-
A constraint generation algorithm for the construction of periodic railway timetables
-
M.A. Odijk, A constraint generation algorithm for the construction of periodic railway timetables, Transport Res B 30 (1996), 455-464.
-
(1996)
Transport Res B
, vol.30
, pp. 455-464
-
-
Odijk, M.A.1
-
24
-
-
0041959616
-
-
Proceedings computer-aided scheduling of public transport (CASPT 2000), S. Voβ, J.R. Daduna (Editors), Vol., Springer, Berlin
-
L. Peeters, and, L. Kroon, A cycle based optimization model for the cyclic railway timetabling problem, Proceedings computer-aided scheduling of public transport (CASPT 2000), S. Voβ, J.R. Daduna, (Editors), Vol. 505, Springer, Berlin, 2001, pp. 275-296.
-
(2001)
A Cycle Based Optimization Model for the Cyclic Railway Timetabling Problem
, vol.505
, pp. 275-296
-
-
Peeters, L.1
Kroon, L.2
-
26
-
-
78650080197
-
New approaches for the train dispatching problem
-
G. Sahin, R.K. Ahuja, and, C.B. Cunha, New approaches for the train dispatching problem, Transport Res B, Submitted for publication.
-
Transport Res B, Submitted for Publication
-
-
Sahin, G.1
Ahuja, R.K.2
Cunha, C.B.3
-
27
-
-
0011529581
-
-
Amsterdam. In Dutch
-
A. Schrijver, and, A. Steenbeck, Dienstregelingontwikkeling voor Railned (timetable construction for Railned), Rapport CADANS 1.0, C.W.I. Center for Mathematics and Computer Science, Amsterdam. In Dutch, 1994.
-
(1994)
Dienstregelingontwikkeling voor Railned (Timetable Construction for Railned), Rapport CADANS 1.0, C.W.I. Center for Mathematics and Computer Science
-
-
Schrijver, A.1
Steenbeck, A.2
-
28
-
-
0008917539
-
A mathematical model for periodic scheduling problems
-
P. Serafini, and, W. Ukovich, A mathematical model for periodic scheduling problems, SIAM J Disc Math 2 (1989), 550-581.
-
(1989)
SIAM J Disc Math
, vol.2
, pp. 550-581
-
-
Serafini, P.1
Ukovich, W.2
-
29
-
-
78650142621
-
-
Bachelor thesis, B08/5, IFOR, ETH Zurich
-
S. Wörner, Integrating periodicity into the train service intention, Bachelor thesis, B08/5, IFOR, ETH Zurich, 2008.
-
(2008)
Integrating Periodicity into the Train Service Intention
-
-
Wörner, S.1
-
31
-
-
0030212718
-
Routing trains through railway stations: Model formulation and algorithms
-
P.J. Zwaneveld, L.G. Kroon, H.E. Romeijn, M. Salomon, S. Dauzère-Pérès, S.P.M. van Hoesel, and, H.W. Ambergen, Routing trains through railway stations: Model formulation and algorithms, Transport Sci 30 (1996), 181-194.
-
(1996)
Transport Sci
, vol.30
, pp. 181-194
-
-
Zwaneveld, P.J.1
Kroon, L.G.2
Romeijn, H.E.3
Salomon, M.4
Dauzère- Pérès, S.5
Van Hoesel, S.P.M.6
Ambergen, H.W.7
|