메뉴 건너뛰기




Volumn 125, Issue 5, 1999, Pages 361-367

OO information model for construction project management

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COST EFFECTIVENESS; MATHEMATICAL MODELS; OBJECT ORIENTED PROGRAMMING; OPTIMIZATION; SCHEDULING;

EID: 0032655303     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:5(361)     Document Type: Article
Times cited : (83)

References (37)
  • 1
    • 0032072617 scopus 로고    scopus 로고
    • Factors of non-excusable delays that influence contractors' performance
    • Abd. Majid, M. Z., and McCaffer, R. (1998). "Factors of non-excusable delays that influence contractors' performance." J. Mgmt. in Engrg., ASCE, 14(3), 42-49.
    • (1998) J. Mgmt. in Engrg., ASCE , vol.14 , Issue.3 , pp. 42-49
    • Abd Majid, M.Z.1    McCaffer, R.2
  • 2
    • 0030295957 scopus 로고    scopus 로고
    • Object-oriented blackboard models for integrated design of steel structures
    • Adeli, H., and Kao, W.-M. (1996). "Object-oriented blackboard models for integrated design of steel structures." Comp. and Struct., 61(3), 545-561.
    • (1996) Comp. and Struct. , vol.61 , Issue.3 , pp. 545-561
    • Adeli, H.1    Kao, W.-M.2
  • 3
    • 0000191706 scopus 로고    scopus 로고
    • Scheduling/cost optimization and neural dynamics model for construction
    • Adeli, H., and Karim, A. (1997). "Scheduling/cost optimization and neural dynamics model for construction." J. Constr. Engrg. and Mgmt., ASCE, 123(4), 450-458.
    • (1997) J. Constr. Engrg. and Mgmt., ASCE , vol.123 , Issue.4 , pp. 450-458
    • Adeli, H.1    Karim, A.2
  • 4
    • 0030242671 scopus 로고    scopus 로고
    • Hybrid CPN-neural dynamics model for discrete optimization of steel structures
    • Adeli, H., and Park, H. S. (1996). "Hybrid CPN-neural dynamics model for discrete optimization of steel structures." Microcomputers in Civ. Engrg., 11(5), 355-366.
    • (1996) Microcomputers in Civ. Engrg. , vol.11 , Issue.5 , pp. 355-366
    • Adeli, H.1    Park, H.S.2
  • 6
    • 0002596236 scopus 로고    scopus 로고
    • Regularization neural network model for highway construction cost estimation
    • Adeli, H., and Wu, M. (1998). "Regularization neural network model for highway construction cost estimation." J. Constr. Engrg. and Mgmt., ASCE, 124(1), 18-24.
    • (1998) J. Constr. Engrg. and Mgmt., ASCE , vol.124 , Issue.1 , pp. 18-24
    • Adeli, H.1    Wu, M.2
  • 7
    • 84988210177 scopus 로고
    • An object-oriented data management model for numerical analysis in computer-aided engineering
    • Adeli, H., and Yu, G. (1993a). "An object-oriented data management model for numerical analysis in computer-aided engineering." Microcomputers in Civ. Engrg., 8, 199-209.
    • (1993) Microcomputers in Civ. Engrg. , vol.8 , pp. 199-209
    • Adeli, H.1    Yu, G.2
  • 8
    • 0000325592 scopus 로고
    • Concurrent OOP model for computer-aided engineering using blackboard architecture
    • Adeli, H., and Yu, G. (1993b). "Concurrent OOP model for computer-aided engineering using blackboard architecture." J. Parallel Algorithms and Applications, 1(2), 315-337.
    • (1993) J. Parallel Algorithms and Applications , vol.1 , Issue.2 , pp. 315-337
    • Adeli, H.1    Yu, G.2
  • 10
    • 0029229561 scopus 로고
    • Probabilistic analysis of claims for extensions in the contract time
    • De Leon, G. P., and Knoke, J. R. (1995). "Probabilistic analysis of claims for extensions in the contract time." J. Comp. in Civ. Engrg., ASCE, 2, 1513-1520.
    • (1995) J. Comp. in Civ. Engrg., ASCE , vol.2 , pp. 1513-1520
    • De Leon, G.P.1    Knoke, J.R.2
  • 12
    • 0031185451 scopus 로고    scopus 로고
    • Genetic algorithms to solve construction time-cost trade-off problems
    • Feng, C.-W., Liu, L., and Burns, S. A. (1997). "Genetic algorithms to solve construction time-cost trade-off problems." J. Comp. in Civ. Engrg., ASCE, 11(3), 184-189.
    • (1997) J. Comp. in Civ. Engrg., ASCE , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.-W.1    Liu, L.2    Burns, S.A.3
  • 13
    • 0031257016 scopus 로고    scopus 로고
    • Object technology and reuse: Lessons learned from early adopters
    • Oct.
    • Fichman, R. G., and Kemerer, C. F. (1997). Object technology and reuse: Lessons learned from early adopters." Computer, Oct., 47-59.
    • (1997) Computer , pp. 47-59
    • Fichman, R.G.1    Kemerer, C.F.2
  • 14
    • 0000693991 scopus 로고    scopus 로고
    • Scheduling with computer-interpretable construction method models
    • Fischer, M. A., and Aalami, F. (1996) "Scheduling with computer-interpretable construction method models." J. Constr. Engrg. and Mgmt., ASCE, 122(4), 337-347.
    • (1996) J. Constr. Engrg. and Mgmt., ASCE , vol.122 , Issue.4 , pp. 337-347
    • Fischer, M.A.1    Aalami, F.2
  • 15
    • 0030196033 scopus 로고    scopus 로고
    • Examples and characteristics of shared project models
    • Fischer, M., and Froese, T. (1996). "Examples and characteristics of shared project models." J. Comp. in Civ. Engrg., ASCE, 10(3), 174-182.
    • (1996) J. Comp. in Civ. Engrg., ASCE , vol.10 , Issue.3 , pp. 174-182
    • Fischer, M.1    Froese, T.2
  • 18
    • 0030190038 scopus 로고    scopus 로고
    • Models of construction process information
    • Froese, T. (1996). "Models of construction process information." J. Comp. in Civ. Engrg., ASCE, 10(3), 183-193.
    • (1996) J. Comp. in Civ. Engrg., ASCE , vol.10 , Issue.3 , pp. 183-193
    • Froese, T.1
  • 19
    • 84988168725 scopus 로고
    • OPIS: An object model-based project information system
    • Froese, T., and Paulson, B. C. (1994). "OPIS: An object model-based project information system." Microcomputers in Civ. Engrg., 9, 13-28.
    • (1994) Microcomputers in Civ. Engrg. , vol.9 , pp. 13-28
    • Froese, T.1    Paulson, B.C.2
  • 21
    • 0004652780 scopus 로고    scopus 로고
    • Quantitative impacts of project change: Size issues
    • Ibbs, C. W. (1997). "Quantitative impacts of project change: Size issues." J. Constr. Engrg. and Mgmt., ASCE, 23(3), 308-311.
    • (1997) J. Constr. Engrg. and Mgmt., ASCE , vol.23 , Issue.3 , pp. 308-311
    • Ibbs, C.W.1
  • 23
    • 0031258215 scopus 로고    scopus 로고
    • Frameworks = (components + patterns)
    • Johnson, R. E. (1997). "Frameworks = (components + patterns)." Communications of the ACM, 40(10), 39-42.
    • (1997) Communications of the ACM , vol.40 , Issue.10 , pp. 39-42
    • Johnson, R.E.1
  • 24
    • 0031103106 scopus 로고    scopus 로고
    • Distributed object-oriented blackboard model for integrated design of steel structures
    • Kao, W.-M., and Adeli, H. (1997). "Distributed object-oriented blackboard model for integrated design of steel structures." Microcomputers in Civ. Engrg., 12(2), 141-155.
    • (1997) Microcomputers in Civ. Engrg. , vol.12 , Issue.2 , pp. 141-155
    • Kao, W.-M.1    Adeli, H.2
  • 25
    • 0032670219 scopus 로고    scopus 로고
    • CONSCOM: An OO construction scheduling and change management system
    • Karim, A., and Adeli, H. (1999). "CONSCOM: An OO construction scheduling and change management system." J. Constr. Engrg. and Mgmt., ASCE, 125(5), 368-376.
    • (1999) J. Constr. Engrg. and Mgmt., ASCE , vol.125 , Issue.5 , pp. 368-376
    • Karim, A.1    Adeli, H.2
  • 27
    • 0029470313 scopus 로고
    • Construction time-cost trade-off analysis using LP/IP hybrid method
    • Liu, L., Burns, S. A., and Feng, C.-W. (1995). "Construction time-cost trade-off analysis using LP/IP hybrid method." J. Constr. Engrg. and Mgmt., ASCE, 121(4), 446-454.
    • (1995) J. Constr. Engrg. and Mgmt., ASCE , vol.121 , Issue.4 , pp. 446-454
    • Liu, L.1    Burns, S.A.2    Feng, C.-W.3
  • 29
    • 0031185995 scopus 로고    scopus 로고
    • Distributed neural dynamics algorithms for optimization of large steel structures
    • Park, H. S., and Adeli, H. (1997). "Distributed neural dynamics algorithms for optimization of large steel structures." J. Struct. Engrg., ASCE, 123(7), 880-888.
    • (1997) J. Struct. Engrg., ASCE , vol.123 , Issue.7 , pp. 880-888
    • Park, H.S.1    Adeli, H.2
  • 32
    • 0031259194 scopus 로고    scopus 로고
    • Lessons learned building reusable OO frameworks for distributed software
    • Schmidt, D. C., and Fayad, M. E. (1997). "Lessons learned building reusable OO frameworks for distributed software." Communications of the ACM, 40(10), 85-87.
    • (1997) Communications of the ACM , vol.40 , Issue.10 , pp. 85-87
    • Schmidt, D.C.1    Fayad, M.E.2
  • 35
    • 0030195306 scopus 로고    scopus 로고
    • Object-oriented model for integrating construction product and process information
    • Stumpf, A. L., Ganeshan, R., Chin, S., and Liu, L. Y. (1996). "Object-oriented model for integrating construction product and process information." J. Comp. in Civ. Engrg., 10(3), 204-212.
    • (1996) J. Comp. in Civ. Engrg. , vol.10 , Issue.3 , pp. 204-212
    • Stumpf, A.L.1    Ganeshan, R.2    Chin, S.3    Liu, L.Y.4
  • 36
    • 84981385185 scopus 로고
    • Computer-aided design using object-oriented programming paradigm and blackboard architecture
    • Yu, G., and Adeli, H. (1991). "Computer-aided design using object-oriented programming paradigm and blackboard architecture." Microcomputers in Civ. Engrg., 6, 177-189.
    • (1991) Microcomputers in Civ. Engrg. , vol.6 , pp. 177-189
    • Yu, G.1    Adeli, H.2
  • 37
    • 0027667754 scopus 로고
    • Object-oriented finite element analysis using an EER model
    • Yu, G., and Adeli, H. (1993). "Object-oriented finite element analysis using an EER model." J. Struct. Engrg., ASCE, 119(9), 2763-2781.
    • (1993) J. Struct. Engrg., ASCE , vol.119 , Issue.9 , pp. 2763-2781
    • Yu, G.1    Adeli, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.