메뉴 건너뛰기




Volumn 136, Issue 12, 2010, Pages 1258-1267

Analysis of adverse weather for excusable delays

Author keywords

Claims; Construction management; Contracts; Delay time; Weather

Indexed keywords

ADVERSE WEATHER; CLAIMS; CONSTRUCTION MANAGEMENT; DELAY TIME; EXCUSABLE DELAY; NORMAL CONDITION; SEVERE WEATHER; TIME EXTENSIONS; WEATHER; WEATHER DELAYS; WEATHER PARAMETERS;

EID: 78649290705     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000242     Document Type: Article
Times cited : (27)

References (37)
  • 1
    • 3042576709 scopus 로고    scopus 로고
    • American Institute of Architects.. Document A201-1997, Washington, D.C.
    • American Institute of Architects. (1997). " General conditions of the contract for construction.." Document A201-1997, Washington, D.C.
    • (1997) General Conditions of the Contract for Construction
  • 2
    • 3042576709 scopus 로고    scopus 로고
    • American Institute of Architects.. Document A201-2007, Washington, D.C.
    • American Institute of Architects. (2007). " General conditions of the contract for construction.." Document A201-2007, Washington, D.C.
    • (2007) General Conditions of the Contract for Construction
  • 3
    • 78649266059 scopus 로고
    • Forecasting work conditions for road construction activities: An application of alternative probability models
    • MWREAB 0027-0644, 10.1175/1520-0493(1973)101<0223:FWCFRC>2.3.CO;2
    • Attanasi, E. D., Johnson, S. R., LeDuc, S., and McQuigg, J. D. (1973). " Forecasting work conditions for road construction activities: An application of alternative probability models.." Mon. Weather Rev. MWREAB 0027-0644, 101 (3), 223-230. 10.1175/1520-0493(1973)101<0223:FWCFRC>2.3. CO;2
    • (1973) Mon. Weather Rev. , vol.101 , Issue.3 , pp. 223-230
    • Attanasi, E.D.1    Johnson, S.R.2    Leduc, S.3    McQuigg, J.D.4
  • 4
    • 0015159159 scopus 로고
    • Causes of delay in the construction industry
    • JCCEAZ 0569-7948.
    • Baldwin, J. R., Manthei, J. M., Rothbart, H., and Harris, R. B. (1971). " Causes of delay in the construction industry.." J. Constr. Div. JCCEAZ 0569-7948, 97 (2), 177-187.
    • (1971) J. Constr. Div. , vol.97 , Issue.2 , pp. 177-187
    • Baldwin, J.R.1    Manthei, J.M.2    Rothbart, H.3    Harris, R.B.4
  • 5
    • 0015649036 scopus 로고
    • Simulating effects of weather on construction
    • JCCEAZ 0569-7948.
    • Benjamin, N. B. H., and Greenwald, T. W. (1973). " Simulating effects of weather on construction.." J. Constr. Div. JCCEAZ 0569-7948, 99 (1), 175-190.
    • (1973) J. Constr. Div. , vol.99 , Issue.1 , pp. 175-190
    • Benjamin, N.B.H.1    Greenwald, T.W.2
  • 7
    • 49749114029 scopus 로고    scopus 로고
    • Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:9(673)
    • Chan, E. H. W., and Au, M. C. Y. (2008). " Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (9), 673-680. 10.1061/(ASCE)0733-9364(2008)134:9(673)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.9 , pp. 673-680
    • Chan, E.H.W.1    Au, M.C.Y.2
  • 8
    • 68349097984 scopus 로고    scopus 로고
    • Weather derivatives allow construction to hedge weather risk
    • COENDE 0378-3839.
    • Connors, R. B. (2003). " Weather derivatives allow construction to hedge weather risk.." Coastal Eng. COENDE 0378-3839, 45 (3), 21-24.
    • (2003) Coastal Eng. , vol.45 , Issue.3 , pp. 21-24
    • Connors, R.B.1
  • 9
    • 0035279776 scopus 로고    scopus 로고
    • Impact of rainfall on the productivity of highway construction
    • DOI 10.1061/(ASCE)0733-9364(2001)127:2(125)
    • El-Rayes, K., and Moselhi, O. (2001). " Impact of rainfall on the productivity of highway construction.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (2), 125-131. 10.1061/(ASCE)0733-9364(2001)127:2(125) (Pubitemid 32297260)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.2 , pp. 125-131
    • El-Rayes, K.1    Moselhi, O.2
  • 10
    • 54249100948 scopus 로고    scopus 로고
    • Causes of delay in building construction projects in Egypt
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:11(831)
    • El-Razek, M. E. A., Bassioni, H. A., and Mobarak, A. M. (2008). " Causes of delay in building construction projects in Egypt.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (11), 831-841. 10.1061/(ASCE)0733-9364(2008) 134:11(831)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.11 , pp. 831-841
    • El-Razek, M.E.A.1    Bassioni, H.A.2    Mobarak, A.M.3
  • 11
    • 78649295734 scopus 로고
    • Weather-related delays on government contracts
    • The Association for the Advancement of Cost Engineering International (AACEI), Morgantown, W.Va.
    • Finke, M. R. (1990). " Weather-related delays on government contracts.." Proc., AACE Int. Transactions of the Annual Meetings, The Association for the Advancement of Cost Engineering International (AACEI), Morgantown, W.Va.
    • (1990) Proc., AACE Int. Transactions of the Annual Meetings
    • Finke, M.R.1
  • 12
    • 0001550139 scopus 로고
    • Weather effects on mason productivity
    • JCCEAZ 0569-7948.
    • Grimm, C. T., and Wagner, N. K. (1974). " Weather effects on mason productivity.." J. Constr. Div. JCCEAZ 0569-7948, 100 (3), 319-335.
    • (1974) J. Constr. Div. , vol.100 , Issue.3 , pp. 319-335
    • Grimm, C.T.1    Wagner, N.K.2
  • 13
    • 78649259231 scopus 로고    scopus 로고
    • Handex of the Carolinas, Inc. v. County of Haywood, and Municipal Engineering Services Company, P.A., No. COA03-1658.
    • Handex of the Carolinas, Inc. v. County of Haywood, and Municipal Engineering Services Company, P.A., No. COA03-1658 (Court of Appeals of North Carolina 2005).
    • (2005) Court of Appeals of North Carolina
  • 14
    • 47749097935 scopus 로고    scopus 로고
    • Delay analysis under multiple baseline updates
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:8(575)
    • Hegazy, T., and Menesi, W. (2008). " Delay analysis under multiple baseline updates.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (8), 575-662. 10.1061/(ASCE)0733-9364(2008)134:8(575)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.8 , pp. 575-662
    • Hegazy, T.1    Menesi, W.2
  • 15
    • 77958135795 scopus 로고
    • Weather in construction contracts
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1989)115:2(270)
    • Hinze, J., and Couey, J. (1989). " Weather in construction contracts.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 115 (2), 270-283. 10.1061/(ASCE)0733-9364(1989)115:2(270)
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.2 , pp. 270-283
    • Hinze, J.1    Couey, J.2
  • 16
    • 0033342184 scopus 로고    scopus 로고
    • Generic methodology for analyzing delay claims
    • DOI 10.1061/(ASCE)0733-9364(1999)125:6(409)
    • Kartam, S. (1999). " Generic methodology for analyzing delay claims.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (6), 409-419. 10.1061/(ASCE)0733-9364(1999)125:6(409) (Pubitemid 30509595)
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 409-419
    • Kartam, S.1
  • 18
    • 0022266352 scopus 로고
    • Climatic effects on construction
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1985)111:2(129)
    • Koehn, E., and Brown, G. (1985). " Climatic effects on construction.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 111 (2), 129-137. 10.1061/(ASCE)0733-9364(1985)111:2(129)
    • (1985) J. Constr. Eng. Manage. , vol.111 , Issue.2 , pp. 129-137
    • Koehn, E.1    Brown, G.2
  • 19
    • 0025398530 scopus 로고
    • Factors affecting construction planning outcomes
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1990)116:1(135)
    • Laufer, A., and Cohenca, D. (1990). " Factors affecting construction planning outcomes.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (1), 135-156. 10.1061/(ASCE)0733-9364(1990)116:1(135)
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.1 , pp. 135-156
    • Laufer, A.1    Cohenca, D.2
  • 20
    • 78649304192 scopus 로고
    • Study of the effect of weather on road construction: A simulation model
    • MWREAB 0027-0644, 10.1175/1520-0493(1971)099<0939:SOTEOW>2.3.CO;2
    • Maunder, W. J., Johnson, S. R., and McQuigg, J. D. (1971). " Study of the effect of weather on road construction: A simulation model.." Mon. Weather Rev. MWREAB 0027-0644, 99 (12), 939-945. 10.1175/1520-0493(1971) 099<0939:SOTEOW>2.3.CO;2
    • (1971) Mon. Weather Rev. , vol.99 , Issue.12 , pp. 939-945
    • Maunder, W.J.1    Johnson, S.R.2    McQuigg, J.D.3
  • 21
    • 78649269074 scopus 로고
    • 713 F. Su906 [U.S. District Court Eastern District of Virginia (E.D. Va.)].
    • McDevitt & Street Co. v. Marriott Corp., 713 F. Supp. 906 [U.S. District Court Eastern District of Virginia (E.D. Va.) 1989].
    • (1989) McDevitt & Street Co. v. Marriott Cor
  • 22
    • 15844395576 scopus 로고    scopus 로고
    • Weather delays and impacts
    • CSTEDM 0274-9696.
    • McDonald, D. F. (2000). " Weather delays and impacts.." Cost Eng. CSTEDM 0274-9696, 42 (5), 34-39.
    • (2000) Cost Eng. , vol.42 , Issue.5 , pp. 34-39
    • McDonald, D.F.1
  • 23
    • 75849146366 scopus 로고    scopus 로고
    • Analyzing weather-related construction claims
    • COENDE 0378-3839.
    • Moselhi, O., and El-Rayes, K. (2002). " Analyzing weather-related construction claims.." Coastal Eng. COENDE 0378-3839, 44 (8), 12-19.
    • (2002) Coastal Eng. , vol.44 , Issue.8 , pp. 12-19
    • Moselhi, O.1    El-Rayes, K.2
  • 24
    • 0001438608 scopus 로고    scopus 로고
    • Estimating weather impact on the duration of construction activities
    • CJCEB8 0315-1468, 10.1139/cjce-24-3-359
    • Moselhi, O., Gong, D., and El-Rayes, K. (1997). " Estimating weather impact on the duration of construction activities.." Can. J. Civ. Eng. CJCEB8 0315-1468, 24 (3), 359-366. 10.1139/cjce-24-3-359
    • (1997) Can. J. Civ. Eng. , vol.24 , Issue.3 , pp. 359-366
    • Moselhi, O.1    Gong, D.2    El-Rayes, K.3
  • 25
    • 78649267913 scopus 로고    scopus 로고
    • National Oceanic and Atmospheric Administration (NOAA). Asheville, N.C., (Nov. 8, 2008).
    • National Oceanic and Atmospheric Administration (NOAA). (2008a). Climatography of the United States no. 20 1971-2000: Livermore, CA station, Asheville, N.C., 〈 http://cdo.ncdc.noaa.gov/climatenormals/clim20/ca/ 044997.pdf 〉 (Nov. 8, 2008).
    • (2008) Climatography of the United States No. 20 1971-2000: Livermore, CA Station
  • 26
    • 78649243109 scopus 로고    scopus 로고
    • National Oceanic and Atmospheric Administration (NOAA). Asheville, N.C., (Nov. 8, 2008).
    • National Oceanic and Atmospheric Administration (NOAA). (2008b). Record of river and climatological observations: Livermore, CA station, Asheville, N.C., 〈 http://www7.ncdc.noaa.gov/IPS/coop/coop.html 〉 (Nov. 8, 2008).
    • (2008) Record of River and Climatological Observations: Livermore, CA Station
  • 27
    • 45749140880 scopus 로고    scopus 로고
    • FLORA: New forensic schedule analysis technique
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:7(483)
    • Nguyen, L. D., and Ibbs, W. (2008). " FLORA: New forensic schedule analysis technique.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (7), 483-491. 10.1061/(ASCE)0733-9364(2008)134:7(483)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.7 , pp. 483-491
    • Nguyen, L.D.1    Ibbs, W.2
  • 28
    • 0028754078 scopus 로고
    • Construction claims and disputes: Causes and cost/time overruns
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1994)120:4(785)
    • Semple, C., Harman, F. T., and Jergeas, G. (1994). " Construction claims and disputes: Causes and cost/time overruns.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 120 (4), 785-795. 10.1061/(ASCE)0733-9364(1994)120: 4(785)
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 785-795
    • Semple, C.1    Harman, F.T.2    Jergeas, G.3
  • 29
    • 0041996713 scopus 로고
    • Estimating precipitation impacts for scheduling
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1989)115:4(552)
    • Smith, G. R., and Hancher, D. E. (1989). " Estimating precipitation impacts for scheduling.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 115 (4), 552-566. 10.1061/(ASCE)0733-9364(1989)115:4(552)
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.4 , pp. 552-566
    • Smith, G.R.1    Hancher, D.E.2
  • 30
    • 78649253545 scopus 로고    scopus 로고
    • Section 01 26 20-Weather delays
    • Tennessee Department of Finance and Administration (TennDFA).. , Nashville, Tenn.
    • Tennessee Department of Finance and Administration (TennDFA). (2007). " Section 01 26 20-Weather delays.." Designer's manual, Nashville, Tenn.
    • (2007) Designer's Manual
  • 31
    • 0032673945 scopus 로고    scopus 로고
    • Loss of labor productivity due to delivery methods and weather
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1999)125:1(39)
    • Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). " Loss of labor productivity due to delivery methods and weather.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (1), 39-46. 10.1061/(ASCE)0733-9364(1999)125:1(39)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 39-46
    • Thomas, H.R.1    Riley, D.R.2    Sanvido, V.E.3
  • 32
    • 78649267072 scopus 로고
    • U.S. Army Corps of Engineers (USACE).. Regulation No. ER 415-1-15, Vicksburg, Miss.
    • U.S. Army Corps of Engineers (USACE). (1989). " Construction time extensions for weather.." Regulation No. ER 415-1-15, Vicksburg, Miss.
    • (1989) Construction Time Extensions for Weather
  • 33
    • 78649276672 scopus 로고    scopus 로고
    • U.S. Army Corps of Engineers (USACE).. Construction Bulletin No. 96-13, Vicksburg, Miss.
    • U.S. Army Corps of Engineers (USACE). (1996). " Developing and analyzing adverse weather data.." Construction Bulletin No. 96-13, Vicksburg, Miss.
    • (1996) Developing and Analyzing Adverse Weather Data
  • 37
    • 2242422127 scopus 로고    scopus 로고
    • Claims for extensions of time in civil engineering projects
    • CMECF3 0144-6193, 10.1080/014461998372312
    • Yogeswaran, K., Kumaraswamy, M. M., and Miller, D. R. A. (1998). " Claims for extensions of time in civil engineering projects.." Constr. Manage. Econom. CMECF3 0144-6193, 16 (3), 283-293. 10.1080/014461998372312
    • (1998) Constr. Manage. Econom. , vol.16 , Issue.3 , pp. 283-293
    • Yogeswaran, K.1    Kumaraswamy, M.M.2    Miller, D.R.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.