Cost Eng. CSTEDM 0274-9696, (2).
-
Al-Gahtani, K. S., and Mohan, S. B. (2007). " Total float management for delay analysis.." Cost Eng. CSTEDM 0274-9696, 49 (2), 32-37.
-
(2007)
Total Float Management for Delay Analysis
, vol.49
, pp. 32-37
-
-
Al-Gahtani, K.S.1
Mohan, S.B.2
-
2
-
-
0000893055
-
-
" Constr. Manage. Econom. CMECF3 0144-6193 10.1080/014461996373250, (5).
-
Alkass, S., Mazerolle, M., and Harris, F. (1996). " Construction delay analysis techniques.." Constr. Manage. Econom. CMECF3 0144-6193 10.1080/014461996373250, 14 (5), 375-394.
-
(1996)
Construction Delay Analysis Techniques
, vol.14
, pp. 375-394
-
-
Alkass, S.1
Mazerolle, M.2
Harris, F.3
-
3
-
-
32644462382
-
-
Int. J. Proj. Manage. IPMAEL 0263-7863 10.1016/j.ijproman.2005.08.005, (2).
-
Arditi, D., and Pattanakitchamroon, T. (2006). " Selecting a delay analysis method in resolving construction claims.." Int. J. Proj. Manage. IPMAEL 0263-7863 10.1016/j.ijproman.2005.08.005, 24 (2), 145-155.
-
(2006)
Selecting A Delay Analysis Method in Resolving Construction Claims
, vol.24
, pp. 145-155
-
-
Arditi, D.1
Pattanakitchamroon, T.2
-
4
-
-
35348818708
-
-
" J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2007)133:11(836), (11).
-
de la Garza, J. M., Prateapusanond, A., and Ambani, N. (2007). " Preallocation of total float in the application of a critical path method based construction contract.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:11(836), 133 (11), 836-845.
-
(2007)
Preallocation of Total Float in the Application of A Critical Path Method Based Construction Contract
, vol.133
, pp. 836-845
-
-
De La Garza, J.M.1
Prateapusanond, A.2
Ambani, N.3
-
5
-
-
0026381930
-
-
" J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(1991)117:4(716), (4).
-
de la Garza, J. M., Vorster, M. C., and Parvin, C. M. (1991). " Total float traded as commodity.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1991)117:4(716), 117 (4), 716-727.
-
(1991)
Total Float Traded As Commodity
, vol.117
, pp. 716-727
-
-
De La Garza, J.M.1
Vorster, M.C.2
Parvin, C.M.3
-
6
-
-
0026130973
-
-
" J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(1991)117:1(118), (1).
-
Echeverry, D., Ibbs, C. W., and Kim, S. (1991). " Sequencing knowledge for construction scheduling.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1991)117:1(118), 117 (1), 118-130.
-
(1991)
Sequencing Knowledge for Construction Scheduling
, vol.117
, pp. 118-130
-
-
Echeverry, D.1
Ibbs, C.W.2
Kim, S.3
-
8
-
-
33645522898
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006) 132:1(35), (1).
-
Fan, S. L., and Tserng, H. P. (2006). " Object-oriented scheduling for repetitive projects with soft logics.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:1(35), 132 (1), 35-48.
-
(2006)
Object-oriented Scheduling for Repetitive Projects with Soft Logics
, vol.132
, pp. 35-48
-
-
Fan, S.L.1
Tserng, H.P.2
-
9
-
-
0037408628
-
-
" Autom. Constr. AUCOES 0926-5805, (3).
-
Fan, S. L., Tserng, H. P., and Wang, M. T. (2002). " Development of an object-oriented scheduling model for construction projects.." Autom. Constr. AUCOES 0926-5805, 12 (3), 283-302.
-
(2002)
Development of An Object-oriented Scheduling Model for Construction Projects
, vol.12
, pp. 283-302
-
-
Fan, S.L.1
Tserng, H.P.2
Wang, M.T.3
-
12
-
-
0040368702
-
-
Cost Eng. CSTEDM 0274-9696, (2).
-
Hanks, D. R. (1999). " Soft logic-An overview.." Cost Eng. CSTEDM 0274-9696, 41 (2), 37-39.
-
(1999)
Soft Logic-An Overview
, vol.41
, pp. 37-39
-
-
Hanks, D.R.1
-
13
-
-
18744411578
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005) 131:5(505), (5).
-
Hegazy, T., and Zhang, K. (2005). " Daily windows delay analysis.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2005)131:5(505), 131 (5), 505-512.
-
(2005)
Daily Windows Delay Analysis
, vol.131
, pp. 505-512
-
-
Hegazy, T.1
Zhang, K.2
-
14
-
-
0025398383
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1990) 116:1(130), (1).
-
Householder, J. L., and Rutland, H. E. (1990). " Who owns float? " J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1990) 116:1(130), 116 (1), 130-133.
-
(1990)
Who Owns Float?
, vol.116
, pp. 130-133
-
-
Householder, J.L.1
Rutland, H.E.2
-
15
-
-
34548678651
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007) 133:10(736), (10).
-
Ibbs, W., and Nguyen, L. D. (2007a). " Alternative for quantifying field-overhead damages.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:10(736), 133 (10), 736-742.
-
(2007)
Alternative for Quantifying Field-overhead Damages
, vol.133
, pp. 736-742
-
-
Ibbs, W.1
Nguyen, L.D.2
-
16
-
-
33846268790
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007) 133:2(131), (2).
-
Ibbs, W., and Nguyen, L. D. (2007b). " Schedule analysis under the effect of resource allocation.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:2(131), 133 (2), 131-138.
-
(2007)
Schedule Analysis under the Effect of Resource Allocation
, vol.133
, pp. 131-138
-
-
Ibbs, W.1
Nguyen, L.D.2
-
17
-
-
27744587547
-
-
" J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2005)131:11(1155), (11).
-
Kim, Y., Kim, K., and Shin, D. (2005). " Delay analysis method using delay section.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:11(1155), 131 (11), 1155-1164.
-
(2005)
Delay Analysis Method Using Delay Section
, vol.131
, pp. 1155-1164
-
-
Kim, Y.1
Kim, K.2
Shin, D.3
-
18
-
-
26644452540
-
-
" J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2005)131:10(1142), (10).
-
Mbabazi, A., Hegazy, T., and Saccomanno, F. (2005). " Modified but-for method for delay analysis.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:10(1142), 131 (10), 1142-1144.
-
(2005)
Modified But-for Method for Delay Analysis
, vol.131
, pp. 1142-1144
-
-
Mbabazi, A.1
Hegazy, T.2
Saccomanno, F.3
-
19
-
-
33749386186
-
-
Cost Eng. CSTEDM 0274-9696, (9).
-
Mohan, S. B., and Al-Gahtani, K. S. (2006). " Current delay analysis techniques and improvements.." Cost Eng. CSTEDM 0274-9696, 48 (9), 12-21.
-
(2006)
Current Delay Analysis Techniques and Improvements
, vol.48
, pp. 12-21
-
-
Mohan, S.B.1
Al-Gahtani, K.S.2
-
20
-
-
0028733215
-
-
Qualitative criteria combination for total float distribution.", The Association for the Advancement of Cost Engineering International (AACEI), DCL.3.1-6.
-
Pasiphol, S., and Popescu, C. (1994). " Qualitative criteria combination for total float distribution.." AACE Int. Trans. of the Annu. Meet., The Association for the Advancement of Cost Engineering International (AACEI), DCL.3.1-6.
-
(1994)
AACE Int. Trans. of the Annu. Meet.
-
-
Pasiphol, S.1
Popescu, C.2
-
21
-
-
45749102237
-
-
WaermeStoffuebertrag. WASBBW 0042-9929, (2).
-
Peterman, G. G. (1979). " Who owns float? " WaermeStoffuebertrag. WASBBW 0042-9929, 21 (2), 55-57.
-
(1979)
Who Owns Float?
, vol.21
, pp. 55-57
-
-
Peterman, G.G.1
-
25
-
-
33846289265
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007) 133:2(124), (2).
-
Sakka, Z. I., and El-Sayegh, S. M. (2007). " Float consumption impact on cost and schedule in the construction industry.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:2(124), 133 (2), 124-130.
-
(2007)
Float Consumption Impact on Cost and Schedule in the Construction Industry
, vol.133
, pp. 124-130
-
-
Sakka, Z.I.1
El-Sayegh, S.M.2
-
26
-
-
0035132258
-
-
" J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2001)127:1(60), (1).
-
Shi, J. J., Cheung, S. O., and Arditi, D. (2001). " Construction delay computation method.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127:1(60), 127 (1), 60-65.
-
(2001)
Construction Delay Computation Method
, vol.127
, pp. 60-65
-
-
Shi, J.J.1
Cheung, S.O.2
Arditi, D.3
-
27
-
-
0034225662
-
-
Cost Eng. CSTEDM 0274-9696, (7).
-
Stumpf, G. R. (2000). " Schedule delay analysis.." Cost Eng. CSTEDM 0274-9696, 42 (7), 32-43.
-
(2000)
Schedule Delay Analysis
, vol.42
, pp. 32-43
-
-
Stumpf, G.R.1
-
28
-
-
0024050376
-
-
J. Comput. Civ. Eng. JCCEE5 0887-3801, (3).
-
Tamimi, S., and Diekmann, J. (1988). " Soft logic in network analysis.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 2 (3), 289-300.
-
(1988)
Soft Logic in Network Analysis
, vol.2
, pp. 289-300
-
-
Tamimi, S.1
Diekmann, J.2
-
30
-
-
0027667752
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1993) 119:3(480), (3).
-
Zack, J. G. (1993). " Claimsmanship: Current perspective.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1993)119:3(480), 119 (3), 480-497.
-
(1993)
Claimsmanship: Current Perspective
, vol.119
, pp. 480-497
-
-
Zack, J.G.1
-
32
-
-
45749142256
-
-
Delay and delay analysis: Isn't it simple? ", International Cost Engineering Council, Ljubljana, Slovenia.
-
Zack, J. G. (2006). " Delay and delay analysis: Isn't it simple? " Proc., 1st ICEC and IPMA Global Congress on Project Management, International Cost Engineering Council, Ljubljana, Slovenia.
-
(2006)
Proc., 1st ICEC and IPMA Global Congress on Project Management
-
-
Zack, J.G.1
|