메뉴 건너뛰기




Volumn 81, Issue 10, 2010, Pages

Engineering and manufacturing of ITER first mirror mock-ups

Author keywords

[No Author keywords available]

Indexed keywords

DELIVERY TIME; ENGINEERING AND MANUFACTURING; FIRST MIRROR; MANUFACTURING CAPABILITY; METALLIC MIRRORS; MIRROR COATING; OPTICAL DIAGNOSTICS; PLASMA ENVIRONMENTS; PLASMA-FACING COMPONENTS; SILVER FILM; STAINLESS STEEL SUBSTRATES;

EID: 78149447092     PISSN: 00346748     EISSN: None     Source Type: Journal    
DOI: 10.1063/1.3479002     Document Type: Conference Paper
Times cited : (12)

References (11)
  • 5
    • 37749034338 scopus 로고    scopus 로고
    • FEDEEE 0920-3796, 10.1016/j.fusengdes.2007.04.044
    • G. De Temmerman and R. A. Pitts, Fusion Eng. Des. FEDEEE 0920-3796 83, 30 (2008). 10.1016/j.fusengdes.2007.04.044
    • (2008) Fusion Eng. Des. , vol.83 , pp. 30
    • De Temmerman, G.1    Pitts, R.A.2
  • 7
    • 78149430103 scopus 로고    scopus 로고
    • SRD-26-PH,-CV,-DR,-DY (TCWS) FROM DOORS, ITER-D-2823A2 v2.1, 16 November
    • W. Curd and M. Shute, System Requirement Document, SRD-26-PH,-CV,-DR,-DY (TCWS) FROM DOORS, ITER-D-2823A2 v2.1, 16 November 2009.
    • (2009) System Requirement Document
    • Curd, W.1    Shute, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.