메뉴 건너뛰기




Volumn 57, Issue 3, 2009, Pages 766-772

A new algorithm for complex product flexible scheduling with constraint between jobs

Author keywords

Complex product flexible scheduling; Forward greedy rule; Improved processing operation tree; Machine balance strategy; Short time strategy

Indexed keywords

COMPLEX PRODUCT FLEXIBLE SCHEDULING; FORWARD GREEDY RULE; IMPROVED PROCESSING OPERATION TREE; MACHINE-BALANCE STRATEGY; SHORT-TIME STRATEGY;

EID: 69649094057     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2009.02.004     Document Type: Article
Times cited : (53)

References (16)
  • 1
    • 0025531716 scopus 로고
    • Job shop scheduling with multi-purpose machines
    • Bruker P., and Schlie R. Job shop scheduling with multi-purpose machines. Computing 45 4 (1990) 369-375
    • (1990) Computing , vol.45 , Issue.4 , pp. 369-375
    • Bruker, P.1    Schlie, R.2
  • 4
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multi-objective evolutionary optimization for flexible job shop scheduling problems
    • Kacem I., Hammad I.S., and Borne P. Approach by localization and multi-objective evolutionary optimization for flexible job shop scheduling problems. IEEE Transactions on Systems, Man and Cybernetics, Part C 32 1 (2002) 408-419
    • (2002) IEEE Transactions on Systems, Man and Cybernetics, Part C , vol.32 , Issue.1 , pp. 408-419
    • Kacem, I.1    Hammad, I.S.2    Borne, P.3
  • 7
    • 17744406854 scopus 로고    scopus 로고
    • An intelligent scheduling optimization of job-shop with flexible process routines
    • Sun Z.J., and Zhu J.Y. An intelligent scheduling optimization of job-shop with flexible process routines. Mechanical Science and Technology 20 6 (2001) 348-350
    • (2001) Mechanical Science and Technology , vol.20 , Issue.6 , pp. 348-350
    • Sun, Z.J.1    Zhu, J.Y.2
  • 8
    • 15744370698 scopus 로고    scopus 로고
    • Hybrid particle swarm optimization approach for multi-objective flexible job-shop scheduling problems
    • Xia W.J., and Wu Z.M. Hybrid particle swarm optimization approach for multi-objective flexible job-shop scheduling problems. Control and Decision 20 2 (2005) 137-141
    • (2005) Control and Decision , vol.20 , Issue.2 , pp. 137-141
    • Xia, W.J.1    Wu, Z.M.2
  • 11
    • 37049009713 scopus 로고    scopus 로고
    • Study on job shop scheduling with many function-same machines
    • Xie Z.Q., Ye G.J., and Liu Y. Study on job shop scheduling with many function-same machines. Mechatrontics and Automation (2007) 1278-1282
    • (2007) Mechatrontics and Automation , pp. 1278-1282
    • Xie, Z.Q.1    Ye, G.J.2    Liu, Y.3
  • 13
    • 33749851631 scopus 로고    scopus 로고
    • Heuristic method for dynamic job shop scheduling problem with operation relativity
    • Xiong H.G., and Li J.J. Heuristic method for dynamic job shop scheduling problem with operation relativity. Chinese Journal of Mechanical Engineering 42 8 (2006) 50-55
    • (2006) Chinese Journal of Mechanical Engineering , vol.42 , Issue.8 , pp. 50-55
    • Xiong, H.G.1    Li, J.J.2
  • 14
    • 34249318411 scopus 로고    scopus 로고
    • Bilevel genetic algorithm for the flexible job shop scheduling problem
    • Zhang C.Y., Rao Y.Q., and Li P.G. Bilevel genetic algorithm for the flexible job shop scheduling problem. Chinese Journal of Mechanical Engineering 43 4 (2007) 119-124
    • (2007) Chinese Journal of Mechanical Engineering , vol.43 , Issue.4 , pp. 119-124
    • Zhang, C.Y.1    Rao, Y.Q.2    Li, P.G.3
  • 15
    • 34147221776 scopus 로고    scopus 로고
    • Solution to flexible job shop scheduling problems with capacitated constraints based on ant colony & genetic algorithms
    • Zhang W.C., Zheng P.E., and Wu X.D. Solution to flexible job shop scheduling problems with capacitated constraints based on ant colony & genetic algorithms. Computer Integrated Manufacturing Systems 13 2 (2007) 333-337
    • (2007) Computer Integrated Manufacturing Systems , vol.13 , Issue.2 , pp. 333-337
    • Zhang, W.C.1    Zheng, P.E.2    Wu, X.D.3
  • 16
    • 16244399859 scopus 로고    scopus 로고
    • Optimization by phases for the flexible job shop scheduling problem
    • In The
    • Zribi, N., Kacem, I., & El Kamel, A. (2004). Optimization by phases for the flexible job shop scheduling problem. In The fifth Asian control conference (Vol. 3, pp. 1889-1895).
    • (2004) fifth Asian control conference , vol.3 , pp. 1889-1895
    • Zribi, N.1    Kacem, I.2    El Kamel, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.