-
1
-
-
0020193734
-
Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
-
Providence, R.I., USA: INFORMS
-
Talbot F.B. Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case. Management Science. vol. 28 (10):1982;1197-1210 INFORMS, Providence, R.I., USA.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1197-1210
-
-
Talbot, F.B.1
-
2
-
-
0001424551
-
Algorithms for multi-resource generalized assignment problem
-
Providence, R.I., USA: INFORMS
-
Gavish B., Pirkul H. Algorithms for multi-resource generalized assignment problem. Management Science. vol. 37 (6):1991;695-713 INFORMS, Providence, R.I., USA.
-
(1991)
Management Science
, vol.37
, Issue.6
, pp. 695-713
-
-
Gavish, B.1
Pirkul, H.2
-
3
-
-
0008619309
-
-
PhD Thesis, University of North Carolina at Chapel Hill, Chapel Hill, NC, USA
-
J.P. Stinson, A Branch and Bound Algorithm for a General Class Resource-Constrained Scheduling Problem. PhD Thesis, University of North Carolina at Chapel Hill, Chapel Hill, NC, USA, 1976.
-
(1976)
A Branch and Bound Algorithm for a General Class Resource-constrained Scheduling Problem
-
-
Stinson, J.P.1
-
6
-
-
0027694317
-
Heuristic for scheduling projects with resource restrictions and several resource-duration modes
-
London: Taylor & Francis
-
Boctor F.F. Heuristic for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research. vol. 31 (11):1993;2547-2558 Taylor & Francis, London.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.11
, pp. 2547-2558
-
-
Boctor, F.F.1
-
7
-
-
0032210453
-
Using Tabu Search to schedule activities of stochastic resource-constrained projects
-
Elsevier
-
Tsai Y.W., Douglas D.G. Using Tabu Search to schedule activities of stochastic resource-constrained projects. European Journal of Operational Research. vol. 111:1998;129-141 Elsevier, Elsevier.
-
(1998)
European Journal of Operational Research
, vol.111
, pp. 129-141
-
-
Tsai, Y.W.1
Douglas, D.G.2
-
8
-
-
0033311742
-
The multi-mode resource-constrained project scheduling problem with generalized precedence relations
-
Elsevier B.V.: Elsevier
-
Reyck B.D., Herroelen W. The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research. vol. 119:1999;538-556 Elsevier, Elsevier B.V.
-
(1999)
European Journal of Operational Research
, vol.119
, pp. 538-556
-
-
Reyck, B.D.1
Herroelen, W.2
-
9
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
NY, USA: ASCE
-
Chan W.T., Chua D.K.H. Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management. vol. 122 (2):1996;125-132 ASCE, NY, USA.
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.H.2
-
10
-
-
0001494926
-
A genetic-algorithm-based resource-constrained construction scheduling system
-
London: Spon
-
Leu S.S., Yang C.H. A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management & Economics. vol. 17:1999;767-776 Spon, London.
-
(1999)
Construction Management & Economics
, vol.17
, pp. 767-776
-
-
Leu, S.S.1
Yang, C.H.2
-
11
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
NY, USA: ASCE
-
Hegazy T. Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management. vol. 125 (3):1999;167-175 ASCE, NY, USA.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
14
-
-
0037118776
-
Optimizaton with simulation and multiobjective analysis in industrial decision-making: A case study
-
Alberto L., Azcarate C., Mallor F., Mateo P.M. Optimizaton with simulation and multiobjective analysis in industrial decision-making: a case study. European Journal of Operational Research. 140(2):2002;373-383.
-
(2002)
European Journal of Operational Research
, vol.140
, Issue.2
, pp. 373-383
-
-
Alberto, L.1
Azcarate, C.2
Mallor, F.3
Mateo, P.M.4
-
15
-
-
0000098625
-
An overview of evaluative models for flexible manufacturing systems
-
Basel, Switzerland: Baltzer
-
Suri R. An overview of evaluative models for flexible manufacturing systems. Annals of Operation Research. vol. 3:1985;13-21 Baltzer, Basel, Switzerland.
-
(1985)
Annals of Operation Research
, vol.3
, pp. 13-21
-
-
Suri, R.1
-
16
-
-
0030418937
-
New advances and applications of combining simulation and optimization
-
Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
-
Glover F., Kelly J.P., Laguna M. New advances and applications of combining simulation and optimization. Proceedings of the 1996 Winter Simulation Conference. 1996;144-152 Institute of Electrical and Electronics Engineers, Piscataway, New Jersey.
-
(1996)
Proceedings of the 1996 Winter Simulation Conference
, pp. 144-152
-
-
Glover, F.1
Kelly, J.P.2
Laguna, M.3
-
17
-
-
0031221996
-
Optimizing discrete stochastic systems using simulated annealing and simulation
-
Elsevier B.V.: Elsevier
-
Ahmed M.A., Alkhamis T.M., Hasan M. Optimizing discrete stochastic systems using simulated annealing and simulation. Computers and Industrial Engineering. vol. 32:1997;832-836 Elsevier, Elsevier B.V.
-
(1997)
Computers and Industrial Engineering
, vol.32
, pp. 832-836
-
-
Ahmed, M.A.1
Alkhamis, T.M.2
Hasan, M.3
-
18
-
-
0003656231
-
Application of the new production philosophy to construction
-
Standfort, California: CIFE, Stanford University
-
Koskela L. Application of the new production philosophy to construction. Tech. Rep. vol. 72:1992;CIFE, Stanford University, Standfort, California.
-
(1992)
Tech. Rep.
, vol.72
-
-
Koskela, L.1
-
19
-
-
1642582825
-
Lean production theory: Moving beyond "can do"
-
Rotterdam, Brookfield, Vt: A.A. Balkema
-
Howell G., Ballard G. Lean production theory: moving beyond "can do" Lean Construction. 1997;17-23 A.A. Balkema, Rotterdam, Brookfield, Vt.
-
(1997)
Lean Construction
, pp. 17-23
-
-
Howell, G.1
Ballard, G.2
-
20
-
-
0022699580
-
Strategy related characteristics of discrete-event languages and models
-
San Diego, Calif.: Calif.
-
Hooper J.W. Strategy related characteristics of discrete-event languages and models. Simulation. vol. 46 (4):1986;153-159 Calif. San Diego, Calif.
-
(1986)
Simulation
, vol.46
, Issue.4
, pp. 153-159
-
-
Hooper, J.W.1
-
22
-
-
1642432959
-
Simulation-based methodology for project scheduling
-
London: Spon
-
Zhang H., Tam C.M., Shi J. Simulation-based methodology for project scheduling. Construction Management and Economics. vol. 20 (8):2002;667-678 Spon, London.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.8
, pp. 667-678
-
-
Zhang, H.1
Tam, C.M.2
Shi, J.3
-
23
-
-
0345413017
-
-
P.E. Group, Egham, Surrey, England, UK
-
P.R. Hills, HOCUS. P.E. Group, Egham, Surrey, England, UK, 1971.
-
(1971)
HOCUS
-
-
Hills, P.R.1
-
24
-
-
1642598653
-
Application of fuzzy logic to construction simulation
-
NY, USA: ASCE
-
Zhang H., Tam C.M., Shi J. Application of fuzzy logic to construction simulation. Journal of Computing in Civil Engineering. vol. 17 (1):2003;38-45 ASCE, NY, USA.
-
(2003)
Journal of Computing in Civil Engineering
, vol.17
, Issue.1
, pp. 38-45
-
-
Zhang, H.1
Tam, C.M.2
Shi, J.3
|