메뉴 건너뛰기




Volumn 13, Issue 3, 2004, Pages 409-420

Simulation-based optimization for dynamic resource allocation

Author keywords

Discrete event simulation; Heuristic algorithm; Optimization; Resource allocation

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; HEURISTIC METHODS; MATHEMATICAL MODELS; OPTIMIZATION; PROBLEM SOLVING; PROJECT MANAGEMENT;

EID: 1642602943     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2003.12.005     Document Type: Article
Times cited : (57)

References (24)
  • 1
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
    • Providence, R.I., USA: INFORMS
    • Talbot F.B. Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case. Management Science. vol. 28 (10):1982;1197-1210 INFORMS, Providence, R.I., USA.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1197-1210
    • Talbot, F.B.1
  • 2
    • 0001424551 scopus 로고
    • Algorithms for multi-resource generalized assignment problem
    • Providence, R.I., USA: INFORMS
    • Gavish B., Pirkul H. Algorithms for multi-resource generalized assignment problem. Management Science. vol. 37 (6):1991;695-713 INFORMS, Providence, R.I., USA.
    • (1991) Management Science , vol.37 , Issue.6 , pp. 695-713
    • Gavish, B.1    Pirkul, H.2
  • 6
    • 0027694317 scopus 로고
    • Heuristic for scheduling projects with resource restrictions and several resource-duration modes
    • London: Taylor & Francis
    • Boctor F.F. Heuristic for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research. vol. 31 (11):1993;2547-2558 Taylor & Francis, London.
    • (1993) International Journal of Production Research , vol.31 , Issue.11 , pp. 2547-2558
    • Boctor, F.F.1
  • 7
    • 0032210453 scopus 로고    scopus 로고
    • Using Tabu Search to schedule activities of stochastic resource-constrained projects
    • Elsevier
    • Tsai Y.W., Douglas D.G. Using Tabu Search to schedule activities of stochastic resource-constrained projects. European Journal of Operational Research. vol. 111:1998;129-141 Elsevier, Elsevier.
    • (1998) European Journal of Operational Research , vol.111 , pp. 129-141
    • Tsai, Y.W.1    Douglas, D.G.2
  • 8
    • 0033311742 scopus 로고    scopus 로고
    • The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    • Elsevier B.V.: Elsevier
    • Reyck B.D., Herroelen W. The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research. vol. 119:1999;538-556 Elsevier, Elsevier B.V.
    • (1999) European Journal of Operational Research , vol.119 , pp. 538-556
    • Reyck, B.D.1    Herroelen, W.2
  • 9
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • NY, USA: ASCE
    • Chan W.T., Chua D.K.H. Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management. vol. 122 (2):1996;125-132 ASCE, NY, USA.
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.T.1    Chua, D.K.H.2
  • 10
    • 0001494926 scopus 로고    scopus 로고
    • A genetic-algorithm-based resource-constrained construction scheduling system
    • London: Spon
    • Leu S.S., Yang C.H. A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management & Economics. vol. 17:1999;767-776 Spon, London.
    • (1999) Construction Management & Economics , vol.17 , pp. 767-776
    • Leu, S.S.1    Yang, C.H.2
  • 11
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • NY, USA: ASCE
    • Hegazy T. Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management. vol. 125 (3):1999;167-175 ASCE, NY, USA.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 14
    • 0037118776 scopus 로고    scopus 로고
    • Optimizaton with simulation and multiobjective analysis in industrial decision-making: A case study
    • Alberto L., Azcarate C., Mallor F., Mateo P.M. Optimizaton with simulation and multiobjective analysis in industrial decision-making: a case study. European Journal of Operational Research. 140(2):2002;373-383.
    • (2002) European Journal of Operational Research , vol.140 , Issue.2 , pp. 373-383
    • Alberto, L.1    Azcarate, C.2    Mallor, F.3    Mateo, P.M.4
  • 15
    • 0000098625 scopus 로고
    • An overview of evaluative models for flexible manufacturing systems
    • Basel, Switzerland: Baltzer
    • Suri R. An overview of evaluative models for flexible manufacturing systems. Annals of Operation Research. vol. 3:1985;13-21 Baltzer, Basel, Switzerland.
    • (1985) Annals of Operation Research , vol.3 , pp. 13-21
    • Suri, R.1
  • 16
    • 0030418937 scopus 로고    scopus 로고
    • New advances and applications of combining simulation and optimization
    • Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Glover F., Kelly J.P., Laguna M. New advances and applications of combining simulation and optimization. Proceedings of the 1996 Winter Simulation Conference. 1996;144-152 Institute of Electrical and Electronics Engineers, Piscataway, New Jersey.
    • (1996) Proceedings of the 1996 Winter Simulation Conference , pp. 144-152
    • Glover, F.1    Kelly, J.P.2    Laguna, M.3
  • 17
    • 0031221996 scopus 로고    scopus 로고
    • Optimizing discrete stochastic systems using simulated annealing and simulation
    • Elsevier B.V.: Elsevier
    • Ahmed M.A., Alkhamis T.M., Hasan M. Optimizing discrete stochastic systems using simulated annealing and simulation. Computers and Industrial Engineering. vol. 32:1997;832-836 Elsevier, Elsevier B.V.
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 832-836
    • Ahmed, M.A.1    Alkhamis, T.M.2    Hasan, M.3
  • 18
    • 0003656231 scopus 로고
    • Application of the new production philosophy to construction
    • Standfort, California: CIFE, Stanford University
    • Koskela L. Application of the new production philosophy to construction. Tech. Rep. vol. 72:1992;CIFE, Stanford University, Standfort, California.
    • (1992) Tech. Rep. , vol.72
    • Koskela, L.1
  • 19
    • 1642582825 scopus 로고    scopus 로고
    • Lean production theory: Moving beyond "can do"
    • Rotterdam, Brookfield, Vt: A.A. Balkema
    • Howell G., Ballard G. Lean production theory: moving beyond "can do" Lean Construction. 1997;17-23 A.A. Balkema, Rotterdam, Brookfield, Vt.
    • (1997) Lean Construction , pp. 17-23
    • Howell, G.1    Ballard, G.2
  • 20
    • 0022699580 scopus 로고
    • Strategy related characteristics of discrete-event languages and models
    • San Diego, Calif.: Calif.
    • Hooper J.W. Strategy related characteristics of discrete-event languages and models. Simulation. vol. 46 (4):1986;153-159 Calif. San Diego, Calif.
    • (1986) Simulation , vol.46 , Issue.4 , pp. 153-159
    • Hooper, J.W.1
  • 22
    • 1642432959 scopus 로고    scopus 로고
    • Simulation-based methodology for project scheduling
    • London: Spon
    • Zhang H., Tam C.M., Shi J. Simulation-based methodology for project scheduling. Construction Management and Economics. vol. 20 (8):2002;667-678 Spon, London.
    • (2002) Construction Management and Economics , vol.20 , Issue.8 , pp. 667-678
    • Zhang, H.1    Tam, C.M.2    Shi, J.3
  • 23
    • 0345413017 scopus 로고
    • P.E. Group, Egham, Surrey, England, UK
    • P.R. Hills, HOCUS. P.E. Group, Egham, Surrey, England, UK, 1971.
    • (1971) HOCUS
    • Hills, P.R.1
  • 24
    • 1642598653 scopus 로고    scopus 로고
    • Application of fuzzy logic to construction simulation
    • NY, USA: ASCE
    • Zhang H., Tam C.M., Shi J. Application of fuzzy logic to construction simulation. Journal of Computing in Civil Engineering. vol. 17 (1):2003;38-45 ASCE, NY, USA.
    • (2003) Journal of Computing in Civil Engineering , vol.17 , Issue.1 , pp. 38-45
    • Zhang, H.1    Tam, C.M.2    Shi, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.