-
1
-
-
23044532354
-
The optimal control of a two-stage tandem queueing system with flexible servers
-
H.-S. Ahn, I. Duenyas, and M. E. Lewis, The optimal control of a two-stage tandem queueing system with flexible servers, Probability Eng Inform Sci 16 (2002), 453-469.
-
(2002)
Probability Eng. Inform. Sci.
, vol.16
, pp. 453-469
-
-
Ahn, H.-S.1
Duenyas, I.2
Lewis, M.E.3
-
2
-
-
0033332650
-
Optimal scheduling of a 2-stage tandem queue with parallel servers
-
H.-S. Ahn, I. Duenyas, and R. Zhang, Optimal scheduling of a 2-stage tandem queue with parallel servers, Adv Appl Probability 31 (1999), 1095-1117.
-
(1999)
Adv. Appl. Probability
, vol.31
, pp. 1095-1117
-
-
Ahn, H.-S.1
Duenyas, I.2
Zhang, R.3
-
3
-
-
1842457608
-
Optimal control of a flexible server
-
H.-S. Ahn, I. Duenyas, and R. Zhang, Optimal control of a flexible server, Adv Appl Probability 36 (2004), 139-170.
-
(2004)
Adv. Appl. Probability
, vol.36
, pp. 139-170
-
-
Ahn, H.-S.1
Duenyas, I.2
Zhang, R.3
-
4
-
-
33749571384
-
Dynamic load balancing with flexible workers
-
H.-S. Ahn and R. Righter, Dynamic load balancing with flexible workers, Adv Appl Probability 38 (2006), 621-642.
-
(2006)
Adv. Appl. Probability
, vol.38
, pp. 621-642
-
-
Ahn, H.-S.1
Righter, R.2
-
5
-
-
25144511438
-
Throughput maximization for tandem lines with two stations and flexible servers
-
S. Andradóttir and H. Ayhan, Throughput maximization for tandem lines with two stations and flexible servers, Operat Res 53 (2005), 516-531.
-
(2005)
Operat Res.
, vol.53
, pp. 516-531
-
-
Andradóttir, S.1
Ayhan, H.2
-
6
-
-
0035494143
-
Server assignment policies for maximizing the steady-state throughput of finite queueing systems
-
S. Andradóttir, H. Ayhan, and D. G. Down, Server assignment policies for maximizing the steady-state throughput of finite queueing systems, Manage Sci 47 (2001), 1421-1439.
-
(2001)
Manage Sci.
, vol.47
, pp. 1421-1439
-
-
Andradóttir, S.1
Ayhan, H.2
Down, D.G.3
-
7
-
-
84862411229
-
Dynamic server allocation for queueing networks with flexible servers
-
S. Andradóttir, H. Ayhan, and D. G. Down, Dynamic server allocation for queueing networks with flexible servers, Operat Res 51 (2003), 952-968.
-
(2003)
Operat Res.
, vol.51
, pp. 952-968
-
-
Andradóttir, S.1
Ayhan, H.2
Down, D.G.3
-
8
-
-
35448994150
-
Compensating for failures with flexible servers
-
S. Andradóttir, H. Ayhan, and D. G. Down, Compensating for failures with flexible servers, Operat Res 55 (2007), 753-768.
-
(2007)
Operat Res.
, vol.55
, pp. 753-768
-
-
Andradóttir, S.1
Ayhan, H.2
Down, D.G.3
-
9
-
-
35448987663
-
Dynamic assignment of dedicated and flexible servers in tandem lines
-
S. Andradóttir, H. Ayhan, and D. G. Down, Dynamic assignment of dedicated and flexible servers in tandem lines, Probability Eng Inform Sci 21 (2007), 497-538.
-
(2007)
Probability Eng. Inform. Sci.
, vol.21
, pp. 497-538
-
-
Andradóttir, S.1
Ayhan, H.2
Down, D.G.3
-
10
-
-
41149167672
-
Maximizing the throughput of tandem lines with flexible failure-prone servers and finite buffers
-
S. Andradóttir, H. Ayhan, and D. G. Down, Maximizing the throughput of tandem lines with flexible failure-prone servers and finite buffers, Probability Eng Inform Sci 22 (2008), 191-211.
-
(2008)
Probability Eng. Inform. Sci.
, vol.22
, pp. 191-211
-
-
Andradóttir, S.1
Ayhan, H.2
Down, D.G.3
-
11
-
-
0002622989
-
A production line that balances itself
-
J. J. Bartholdi, III and D. D. Eisenstein, A production line that balances itself, Operat Res 44 (1996), 21-34.
-
(1996)
Operat Res.
, vol.44
, pp. 21-34
-
-
Bartholdi III, J.J.1
Eisenstein, D.D.2
-
12
-
-
0035460936
-
Performance of bucket brigades when work is stochastic
-
J. J. Bartholdi, III, D. D. Eisenstein, and R. D. Foley, Performance of bucket brigades when work is stochastic, Operat Res 49 (2001), 710-719.
-
(2001)
Operat Res.
, vol.49
, pp. 710-719
-
-
Bartholdi, J.J.I.1
Eisenstein, D.D.2
Foley, R.D.3
-
13
-
-
0035413555
-
Dynamic scheduling of a system with two parallel servers in heavy traffic with complete resource pooling: Asymptotic optimality of a continuous review threshold policy
-
S. L. Bell and R. J. Williams, Dynamic scheduling of a system with two parallel servers in heavy traffic with complete resource pooling: Asymptotic optimality of a continuous review threshold policy, Ann Appl Probability 11 (2001), 608-649.
-
(2001)
Ann. Appl. Probability
, vol.11
, pp. 608-649
-
-
Bell, S.L.1
Williams, R.J.2
-
14
-
-
24944531798
-
Dynamic scheduling of a parallel server system in heavy traffic with complete resource pooling: Asymptotic optimality of a threshold policy
-
S. L. Bell and R. J. Williams, Dynamic scheduling of a parallel server system in heavy traffic with complete resource pooling: Asymptotic optimality of a threshold policy, Electron J Probability 10 (2005), 1044-1115.
-
(2005)
Electron. J. Probability
, vol.10
, pp. 1044-1115
-
-
Bell, S.L.1
Williams, R.J.2
-
15
-
-
9744286025
-
Introduction to linear optimization
-
Belmont, Massachusets
-
D. Bertsimas and J. N. Tsitsiklis, Introduction to linear optimization, Athena Scientific, Belmont, Massachusets, 1997.
-
(1997)
Athena Scientific
-
-
Bertsimas, D.1
Tsitsiklis, J.N.2
-
16
-
-
0032027344
-
Control of a single server queueing system with setups
-
I. Duenyas, D. Gupta, and T. L. Olsen, Control of a single server queueing system with setups, Operat Res 46 (1998), 218-230.
-
(1998)
Operat Res.
, vol.46
, pp. 218-230
-
-
Duenyas, I.1
Gupta, D.2
Olsen, T.L.3
-
17
-
-
0027649194
-
Optimal use of an extra server in a two station tandem queueing network
-
T. M. Farrar, Optimal use of an extra server in a two station tandem queueing network, IEEE Trans Automatic Control 38 (1993), 1296-1299.
-
(1993)
IEEE Trans. Automatic Control
, vol.38
, pp. 1296-1299
-
-
Farrar, T.M.1
-
18
-
-
0036778653
-
Factors affecting opportunity of worksharing as a dynamic line balancing mechanism
-
E. S. Gel, W. J. Hopp, and M. P. Van Oyen, Factors affecting opportunity of worksharing as a dynamic line balancing mechanism, IIE Trans 34 (2002), 847-863.
-
(2002)
IIE Trans.
, vol.34
, pp. 847-863
-
-
Gel, E.S.1
Hopp, W.J.2
Van Oyen, M.P.3
-
19
-
-
3843105812
-
Modeling and analysis of flexible queueing systems
-
S. Gurumurthi and S. Benjaafar, Modeling and analysis of flexible queueing systems, Naval Res Logis 51 (2004), 755-782.
-
(2004)
Naval Res. Logis
, vol.51
, pp. 755-782
-
-
Gurumurthi, S.1
Benjaafar, S.2
-
20
-
-
0021439649
-
Optimal control of two interacting service stations
-
B. Hajek, Optimal control of two interacting service stations, IEEE Trans Automatic Control 29 (1984), 491-499.
-
(1984)
IEEE Trans. Automatic Control
, vol.29
, pp. 491-499
-
-
Hajek, B.1
-
21
-
-
0032647070
-
Heavy traffic resource pooling in parallel-server systems
-
J. M. Harrison and M. J. López, Heavy traffic resource pooling in parallel-server systems, Queueing Syst 33 (1999), 339-368.
-
(1999)
Queueing Syst.
, vol.33
, pp. 339-368
-
-
Harrison, J.M.1
López, M.J.2
-
22
-
-
0001754984
-
The effect of some design factors on the efficiency of production lines with variable operation times
-
F. S. Hillier and R. W. Boling, The effect of some design factors on the efficiency of production lines with variable operation times, J Ind Eng 17 (1966), 651-658.
-
(1966)
J. Ind. Eng.
, vol.17
, pp. 651-658
-
-
Hillier, F.S.1
Boling, R.W.2
-
23
-
-
1242309349
-
Benefits of skill chaining in serial production lines with cross-trained workers
-
W. J. Hopp, E. Tekin, and M. P. Van Oyen, Benefits of skill chaining in serial production lines with cross-trained workers, Manage Sci 50 (2004), 83-98.
-
(2004)
Manage Sci.
, vol.50
, pp. 83-98
-
-
Hopp, W.J.1
Tekin, E.2
Van Oyen, M.P.3
-
24
-
-
4444342794
-
Agile workforce evaluation: A framework for cross-training and coordination
-
W. J. Hopp and M. P. Van Oyen, Agile workforce evaluation: A framework for cross-training and coordination, IIE Trans 36 (2004), 919-940.
-
(2004)
IIE Trans.
, vol.36
, pp. 919-940
-
-
Hopp, W.J.1
Van Oyen, M.P.2
-
25
-
-
13144253174
-
A robust policy for serial agile production systems
-
S. M. R. Iravani, J. M. Buzacott, and M. J. M. Posner, A robust policy for serial agile production systems, Naval Res Logist 52 (2005), 58-73.
-
(2005)
Naval Res. Logist
, vol.52
, pp. 58-73
-
-
Iravani, S.M.R.1
Buzacott, J.M.2
Posner, M.J.M.3
-
26
-
-
0031314299
-
A twostage tandem queue attended by a moving server with holding and switching costs
-
S. M. R. Iravani, M. J. M. Posner, and J. M. Buzacott, A twostage tandem queue attended by a moving server with holding and switching costs, Queueing Syst 26 (1997), 203-228.
-
(1997)
Queueing Syst.
, vol.26
, pp. 203-228
-
-
Iravani, S.M.R.1
Posner, M.J.M.2
Buzacott, J.M.3
-
27
-
-
0029290411
-
Principles on the benefits of manufacturing flexibility
-
W. C. Jordan and S. C. Graves, Principles on the benefits of manufacturing flexibility, Manage Sci 41 (1995), 577-594.
-
(1995)
Manage Sci.
, vol.41
, pp. 577-594
-
-
Jordan, W.C.1
Graves, S.C.2
-
28
-
-
30844445382
-
On the introduction of an agile, temporary workforce into a tandem queueing system
-
D. L. Kaufman, H.-S. Ahn, and M. E. Lewis, On the introduction of an agile, temporary workforce into a tandem queueing system, Queueing Syst 51 (2005), 135-171.
-
(2005)
Queueing Syst.
, vol.51
, pp. 135-171
-
-
Kaufman, D.L.1
Ahn, H.-S.2
Lewis, M.E.3
-
29
-
-
77951610208
-
-
Ph. D. Thesis, H. Milton Stewart School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, Georgia
-
H. E. Kirkizlar, Performance improvements through flexible workforce, Ph. D. Thesis, H. Milton Stewart School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, Georgia, 2008.
-
(2008)
Performance Improvements Through Flexible Workforce
-
-
Kirkizlar, H.E.1
-
30
-
-
12344326034
-
Scheduling flexible servers with convex delay costs: Heavy-traffic optimality of the generalized cμ-rule
-
A. Mandelbaum and A. L. Stolyar, Scheduling flexible servers with convex delay costs: Heavy-traffic optimality of the generalized cμ-rule, Operat Res 52 (2004), 836-855.
-
(2004)
Operat Res.
, vol.52
, pp. 836-855
-
-
Mandelbaum, A.1
Stolyar, A.L.2
-
31
-
-
0026938787
-
"On-the-fly" line balancing with very little WIP
-
J. O. McClain, L. J. Thomas, and C. Sox, "On-the-fly" line balancing with very little WIP, Int J Prod Econ 27 (1992), 283-289.
-
(1992)
Int. J. Prod. Econ.
, vol.27
, pp. 283-289
-
-
McClain, J.O.1
Thomas, L.J.2
Sox, C.3
-
32
-
-
0003094666
-
The use of dynamic (state-dependent) assembly-line balancing to improve throughput
-
J. Ostolaza, J. O. McClain, and L. J. Thomas, The use of dynamic (state-dependent) assembly-line balancing to improve throughput, J Manufacturing Operat Manage 3 (1990), 105-133.
-
(1990)
J. Manufacturing Operat Manage
, vol.3
, pp. 105-133
-
-
Ostolaza, J.1
McClain, J.O.2
Thomas, L.J.3
-
33
-
-
0000932095
-
Optimal control of service in tandem queues
-
Z. Rosberg, P. P. Varaiya, and J. C. Walrand, Optimal control of service in tandem queues, IEEE Trans Automatic Control 27 (1982), 600-609.
-
(1982)
IEEE Trans. Automatic Control
, vol.27
, pp. 600-609
-
-
Rosberg, Z.1
Varaiya, P.P.2
Walrand, J.C.3
-
34
-
-
0032184296
-
Machine sharing in manufacturing systems: Total flexibility versus chaining
-
M. Sheikhzadeh, S. Benjaafar, and D. Gupta, Machine sharing in manufacturing systems: Total flexibility versus chaining, Int J Flexible Manufacturing Syst 10 (1998), 351-378.
-
(1998)
Int. J. Flexible Manufacturing Syst.
, vol.10
, pp. 351-378
-
-
Sheikhzadeh, M.1
Benjaafar, S.2
Gupta, D.3
-
35
-
-
18744407155
-
Allocation of interdependent resources for maximal throughput
-
L. Tassiulas and P. P. Bhattacharya, Allocation of interdependent resources for maximal throughput, Stochastic Models 16 (2000), 27-48.
-
(2000)
Stochastic Models
, vol.16
, pp. 27-48
-
-
Tassiulas, L.1
Bhattacharya, P.P.2
-
36
-
-
0035452548
-
Performance opportunity for workforce agility in collaborative and noncollabortive work systems
-
M. P. Van Oyen, E. G. S. Gel, and W. J. Hopp, Performance opportunity for workforce agility in collaborative and noncollabortive work systems, IIE Trans 33 (2001), 761-777.
-
(2001)
IIE Trans.
, vol.33
, pp. 761-777
-
-
Van Oyen, M.P.1
Gel, E.G.S.2
Hopp, W.J.3
-
37
-
-
28244455337
-
A staffing algorithm for call centers with skill-based routing
-
R. B. Wallace and W. Whitt, A staffing algorithm for call centers with skill-based routing, Manufacturing Service Operat Manage 7 (2005), 276-294.
-
(2005)
Manufacturing Service Operat Manage
, vol.7
, pp. 276-294
-
-
Wallace, R.B.1
Whitt, W.2
-
38
-
-
0001017842
-
On dynamic scheduling of a parallel server system with complete resource pooling
-
D. R. McDonald and S. R. E. Turner Editors, Fields Institute Communications, American Mathematical Society
-
R. J. Williams, "On dynamic scheduling of a parallel server system with complete resource pooling, " Analysis of communication networks: Call centres, traffic and performance, Volume 28, D. R. McDonald and S. R. E. Turner (Editors), Fields Institute Communications, American Mathematical Society, 2000, pp. 49-71.
-
(2000)
Analysis of Communication Networks: Call Centres, Traffic and Performance
, vol.28
, pp. 49-71
-
-
Williams, R.J.1
-
39
-
-
42449095306
-
Heuristics for allocation of reconfigurable resources in a serial line with reliability considerations
-
C.-H. Wu, D. G. Down, and M. E. Lewis, Heuristics for allocation of reconfigurable resources in a serial line with reliability considerations, IIE Trans 40 (2008), 595-611.
-
(2008)
IIE Trans.
, vol.40
, pp. 595-611
-
-
Wu, C.-H.1
Down, D.G.2
Lewis, M.E.3
-
40
-
-
33244455259
-
Dynamic allocation of reconfigurable resources in a two-stage tandem queueing system with reliability considerations
-
C.-H. Wu, M. E. Lewis, and M. Veatch, Dynamic allocation of reconfigurable resources in a two-stage tandem queueing system with reliability considerations, IEEE Trans Automatic Control 51 (2006), 309-314.
-
(2006)
IEEE Trans. Automatic Control
, vol.51
, pp. 309-314
-
-
Wu, C.-H.1
Lewis, M.E.2
Veatch, M.3
-
41
-
-
0000906215
-
Self-buffering, self-balancing, self-flushing production lines
-
E. Zavadlav, J. O. McClain, and L. J. Thomas, Self-buffering, self-balancing, self-flushing production lines, Manage Sci 42 (1996), 1151-1164.
-
(1996)
Manage Sci.
, vol.42
, pp. 1151-1164
-
-
Zavadlav, E.1
McClain, J.O.2
Thomas, L.J.3
|