-
1
-
-
23444442196
-
A project control process in pre-construction phases
-
Al-Reshaid, K., Kartam, N., Tewari, N. and Al-Bader, H. (2005), "A project control process in pre-construction phases" in Engineering Construction & Architectural Management, Vol. 12, No. 4, pp. 351-72.
-
(2005)
Engineering Construction & Architectural Management
, vol.12
, Issue.4
, pp. 351-372
-
-
Al-Reshaid, K.1
Kartam, N.2
Tewari, N.3
Al-Bader, H.4
-
2
-
-
0242297291
-
A systems approach to project evaluation
-
Anbari, F. (1985), "A systems approach to project evaluation" in Project Management Journal, Vol. 16, No. 3, pp. 21-6.
-
(1985)
Project Management Journal
, vol.16
, Issue.3
, pp. 21-26
-
-
Anbari, F.1
-
3
-
-
0035399837
-
Managing project front ends: Incorporating a strategic early view to project management with simulation
-
Artto, K., Lehtonen, J. and Saranen, J. (2001), "Managing project front ends: incorporating a strategic early view to project management with simulation" in International Journal of Project Management, Vol. 19, No. 5, pp. 255-64.
-
(2001)
International Journal of Project Management
, vol.19
, Issue.5
, pp. 255-264
-
-
Artto, K.1
Lehtonen, J.2
Saranen, J.3
-
4
-
-
84993089589
-
Improving building design through integrated planning and control
-
Austin, S., Baldwin, A. and Steele, J. (2002), "Improving building design through integrated planning and control" in Engineering, Construction and Architectural Management, Vol. 9, No. 3, pp. 249-58.
-
(2002)
Engineering, Construction and Architectural Management
, vol.9
, Issue.3
, pp. 249-258
-
-
Austin, S.1
Baldwin, A.2
Steele, J.3
-
5
-
-
20744455983
-
KPIs: A critical appraisal of their use in construction
-
Beatham, S., Anumba, C. and Thorpe, T. (2004), "KPIs: a critical appraisal of their use in construction" in Benchmarking: An International Journal, Vol. 11, No. 1, pp. 93-117.
-
(2004)
Benchmarking: An International Journal
, vol.11
, Issue.1
, pp. 93-117
-
-
Beatham, S.1
Anumba, C.2
Thorpe, T.3
-
7
-
-
0031078243
-
A comparative study of cases of time overruns in Hong Kong construction projects
-
Chan, D. and Kumaraswamy, M. (1997), "A comparative study of cases of time overruns in Hong Kong construction projects" in International Journal of Project Management, Vol. 15, No. 1, pp. 55-63.
-
(1997)
International Journal of Project Management
, vol.15
, Issue.1
, pp. 55-63
-
-
Chan, D.1
Kumaraswamy, M.2
-
8
-
-
34248356018
-
Critical success factors for construction partnering in Taiwan
-
Chen, W. and Chen, T. (2007), "Critical success factors for construction partnering in Taiwan" in International Journal of Project Management, Vol. 25, No. 5, pp. 475-84.
-
(2007)
International Journal of Project Management
, vol.25
, Issue.5
, pp. 475-484
-
-
Chen, W.1
Chen, T.2
-
10
-
-
77956330475
-
Performance measurement systems for benchmarking in the construction industry
-
available at:
-
Costa, D., Formoso, C., Kagioglou, M. and Alarcon, L. (2004), "Performance measurement systems for benchmarking in the construction industry", available at: www.indicatores.locaweb.com.br.
-
(2004)
-
-
Costa, D.1
Formoso, C.2
Kagioglou, M.3
Alarcon, L.4
-
12
-
-
77956312902
-
-
DETR The KPI Group, London
-
DETR (2006), KPI Pack 2006, The KPI Group, London.
-
(2006)
KPI Pack 2006
-
-
-
14
-
-
0004260984
-
-
Blackwell, New York, NY, 2nd ed
-
Fellows, R. and Liu, A. (2003), Research Methods for Construction, 2nd ed., Blackwell, New York, NY.
-
(2003)
Research Methods for Construction
-
-
Fellows, R.1
Liu, A.2
-
16
-
-
13944263231
-
Achieving lean design process: Improvement methodology
-
Freire, J. and Alarcon, L. (2002), "Achieving lean design process: improvement methodology" in Journal of Construction Engineering and Management, Vol. 128, No. 3, pp. 248-56.
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.3
, pp. 248-256
-
-
Freire, J.1
Alarcon, L.2
-
17
-
-
0141682726
-
Design quality indicator as a tool for thinking
-
Gann, D., Salter, A. and Whyte, J. (2003), "Design quality indicator as a tool for thinking" in Building Research and Information, Vol. 31, No. 5, pp. 318-33.
-
(2003)
Building Research and Information
, vol.31
, Issue.5
, pp. 318-333
-
-
Gann, D.1
Salter, A.2
Whyte, J.3
-
18
-
-
3242700301
-
A comparison of two editions of the RIBA plan of work
-
Hughes, W. (2003), "A comparison of two editions of the RIBA plan of work" in Engineering. Construction and Architectural Management, Vol. 10, No. 5, pp. 302-11.
-
(2003)
Engineering. Construction and Architectural Management
, vol.10
, Issue.5
, pp. 302-311
-
-
Hughes, W.1
-
19
-
-
33746190774
-
Critical success factors affecting schedule performance: Evidence from Indian construction projects
-
Iyer, K. and Jha, K. (2006), "Critical success factors affecting schedule performance: evidence from Indian construction projects" in Journal of Construction Engineering and Management, Vol. 132, No. 8, pp. 871-81.
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.8
, pp. 871-881
-
-
Iyer, K.1
Jha, K.2
-
20
-
-
0037876286
-
Performance management in construction: A conceptual framework
-
Kagioglou, M., Cooper, R. and Aouad, G. (2001), "Performance management in construction: a conceptual framework" in Construction Management and Economics, Vol. 19, No. 1, pp. 85-95.
-
(2001)
Construction Management and Economics
, vol.19
, Issue.1
, pp. 85-95
-
-
Kagioglou, M.1
Cooper, R.2
Aouad, G.3
-
21
-
-
77956307589
-
Cross-industry learning: The development of a generic design and construction process based on stage/gate new product development processes found in the manufacturing industry
-
Kagioglou, M., Cooper, R., Aouad, G., Hinks, J., Sexton, M. and Sheath, D. (1998), "Cross-industry learning: the development of a generic design and construction process based on stage/gate new product development processes found in the manufacturing industry" in Proceedings of the Engineering Design Conference, June, Brunel University, Uxbridge, pp. 595-602.
-
(1998)
Proceedings of the Engineering Design Conference, June, Brunel University, Uxbridge
, pp. 595-602
-
-
Kagioglou, M.1
Cooper, R.2
Aouad, G.3
Hinks, J.4
Sexton, M.5
Sheath, D.6
-
22
-
-
0003986589
-
-
McGraw-Hill, Columbus, OH, 5th ed
-
Koontz, H. and Weihrich, H. (1990), Essentials of Management, 5th ed., McGraw-Hill, Columbus, OH.
-
(1990)
Essentials of Management
-
-
Koontz, H.1
Weihrich, H.2
-
23
-
-
0442277824
-
Process performance measurement system: A tool to support process-based organizations
-
Kueng, P. (2000), "Process performance measurement system: a tool to support process-based organizations" in Total Quality Management, Vol. 11, No. 1, pp. 67-85.
-
(2000)
Total Quality Management
, vol.11
, Issue.1
, pp. 67-85
-
-
Kueng, P.1
-
24
-
-
0003579835
-
-
Blackwell, Oxford, MA
-
McGeorge, D. and Palmer, A. (1997), Construction Management: New Directions, Blackwell, Oxford, MA.
-
(1997)
Construction Management: New Directions
-
-
McGeorge, D.1
Palmer, A.2
-
25
-
-
77956311433
-
Lessons learnt in developing effective performance measures for construction safety management
-
Marosszeky, M., Karim, K., Davis, S. and Naik, N. (2004), "Lessons learnt in developing effective performance measures for construction safety management", Proceedings of the 12th Annual Conference on Lean Construction, July, Copenhagen, Denmark.
-
(2004)
Proceedings of the 12th Annual Conference on Lean Construction, July, Copenhagen, Denmark
-
-
Marosszeky, M.1
Karim, K.2
Davis, S.3
Naik, N.4
-
26
-
-
0003847064
-
-
Longman, London
-
Mawdesley, M., Askew, W. and O'Reilly, M. (1997), Planning and Controlling Construction Projects: The Best Laid Plans, Longman, London.
-
(1997)
Planning and Controlling Construction Projects: The Best Laid Plans
-
-
Mawdesley, M.1
Askew, W.2
O'Reilly, M.3
-
27
-
-
34548594385
-
Moving from corporate strategy to project strategy
-
Morris, P. and Jamieson, A. (2005), "Moving from corporate strategy to project strategy" in Project Management Journal, Vol. 36, No. 4, pp. 5-18.
-
(2005)
Project Management Journal
, vol.36
, Issue.4
, pp. 5-18
-
-
Morris, P.1
Jamieson, A.2
-
28
-
-
4143129174
-
Drivers for dynamic brief development in construction
-
Othman, A., Hassan, T. and Pasquire, C. (2004), "Drivers for dynamic brief development in construction" in Engineering, Construction and Architectural Management, Vol. 11, No. 4, pp. 248-58.
-
(2004)
Engineering, Construction and Architectural Management
, vol.11
, Issue.4
, pp. 248-258
-
-
Othman, A.1
Hassan, T.2
Pasquire, C.3
-
30
-
-
84986146087
-
Planning and implementation of effective collaboration in construction projects
-
Shelbourn, M., Bouchlaghem, N.M., Anumba, C. and Carrillo, P. (2007), "Planning and implementation of effective collaboration in construction projects" in Construction Innovation: Information, Process, Management, Vol. 7, No. 4, pp. 357-77.
-
(2007)
Construction Innovation: Information, Process, Management
, vol.7
, Issue.4
, pp. 357-377
-
-
Shelbourn, M.1
Bouchlaghem, N.M.2
Anumba, C.3
Carrillo, P.4
-
31
-
-
77956312480
-
Ensuring value for money: A value management approach to manage multiple stakeholders in the briefing process
-
Shen, G. (2006), "Ensuring value for money: a value management approach to manage multiple stakeholders in the briefing process", Proceedings of the Conference on "Client Driving Innovation: Moving Ideas into Practice", March, Gold Coast, Australia.
-
(2006)
Proceedings of the Conference on "Client Driving Innovation: Moving Ideas into Practice", March, Gold Coast, Australia
-
-
Shen, G.1
-
32
-
-
33748942478
-
Key performance indicators and assessment methods for infrastructure sustainability - a South African perspective
-
Ugwu, O. and Haupt, T. (2007), "Key performance indicators and assessment methods for infrastructure sustainability - a South African perspective" in Build and Environment, Vol. 42, No. 2, pp. 665-80.
-
(2007)
Build and Environment
, vol.42
, Issue.2
, pp. 665-680
-
-
Ugwu, O.1
Haupt, T.2
-
34
-
-
0031153884
-
Time and budget: The twin imperatives of project sponsor
-
Wright, J. (1997), "Time and budget: the twin imperatives of project sponsor" in International Journal of Project Management, Vol. 15, No. 3, pp. 181-6.
-
(1997)
International Journal of Project Management
, vol.15
, Issue.3
, pp. 181-186
-
-
Wright, J.1
-
35
-
-
12344319409
-
Critical success factors for public-private partnerships in infrastructure development
-
Zhang, X. (2005), "Critical success factors for public-private partnerships in infrastructure development" in Journal of Construction Engineering and Management, Vol. 131, No. 1, pp. 3-14.
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.1
, pp. 3-14
-
-
Zhang, X.1
|