-
1
-
-
0010039649
-
Analysis of client satisfaction drivers in construction industry
-
Ahmed, S.M. and Kangari, R. (1995), "Analysis of client satisfaction drivers in construction industry", J. Mgmt Eng., ASCE, Vol. 11 No. 2, pp. 36-44.
-
(1995)
J. Mgmt Eng., ASCE
, vol.11
, Issue.2
, pp. 36-44
-
-
Ahmed, S.M.1
Kangari, R.2
-
2
-
-
4143113321
-
Important causes of delay in public utility projects in Saudi Arabia
-
Al-Khalil, M.I. and Al-Ghafly, M.A. (1999), "Important causes of delay in public utility projects in Saudi Arabia", J. Constr. Mgmt Econ., Vol. 17 No. 5, pp. 647-55.
-
(1999)
J. Constr. Mgmt Econ.
, vol.17
, Issue.5
, pp. 647-655
-
-
Al-Khalil, M.I.1
Al-Ghafly, M.A.2
-
4
-
-
0012672496
-
-
Blackwell Science Ltd, Oxford
-
Barrett, P. and Stanley, C. (1999), Better Construction Briefing, 1st ed., Blackwell Science Ltd, Oxford.
-
(1999)
Better Construction Briefing, 1st Ed.
-
-
Barrett, P.1
Stanley, C.2
-
5
-
-
0346690150
-
Is briefing innovative?
-
Langford, D.A. and Retik, A. (Eds), E&FN Spon, London
-
Barrett, P., Hudson, J. and Stanley, C. (1996), "Is briefing innovative?", in Langford, D.A. and Retik, A. (Eds), International Symposium for the Organisation and the Management of Construction: Shaping Theory and Practice, Vol. 3, E&FN Spon, London, pp. 87-95.
-
(1996)
International Symposium for the Organisation and the Management of Construction: Shaping Theory and Practice
, vol.3
, pp. 87-95
-
-
Barrett, P.1
Hudson, J.2
Stanley, C.3
-
6
-
-
0030150019
-
I don't believe in changes just for the sake of change
-
Bates, G.D. (1996), "I don't believe in changes just for the sake of change", J. Mgmt Eng., Vol. 12 No. 3, pp. 20-4.
-
(1996)
J. Mgmt Eng.
, vol.12
, Issue.3
, pp. 20-24
-
-
Bates, G.D.1
-
7
-
-
0009973675
-
-
Centre for Strategic Studies in Construction, University of Reading, UK
-
Bennett, J., Flanagan, R., Lansley, P., Gray, C. and Atkin, B. (1988), Building Britain 2001, Centre for Strategic Studies in Construction, University of Reading, UK.
-
(1988)
Building Britain 2001
-
-
Bennett, J.1
Flanagan, R.2
Lansley, P.3
Gray, C.4
Atkin, B.5
-
8
-
-
4143070096
-
Getting it right at the start
-
Rick, B. and Valence, G. (Eds), Wiley, New York, NY
-
Best, R. and Valence, G. (1999), "Getting it right at the start", in Rick, B. and Valence, G. (Eds), Building in Value: Pre-Design Issues, Wiley, New York, NY.
-
(1999)
Building in Value: Pre-design Issues
-
-
Best, R.1
Valence, G.2
-
9
-
-
84993093666
-
Client briefing process and procurement method selection: A South African study
-
Bowen, P., Pearl, R. and Edwards, P. (1999), "Client briefing process and procurement method selection: a South African study", Eng. Constr. Archit. Mgmt, Vol. 6 No. 2, pp. 91-104.
-
(1999)
Eng. Constr. Archit. Mgmt
, vol.6
, Issue.2
, pp. 91-104
-
-
Bowen, P.1
Pearl, R.2
Edwards, P.3
-
10
-
-
0026837054
-
Causes of quality deviation in design and construction
-
Burati, J.L., Farrington, J.J. and Ledbetter, W.B. (1992), "Causes of quality deviation in design and construction", J. Constr. Eng. Mgmt, Vol. 118 No. 1, pp. 34-49.
-
(1992)
J. Constr. Eng. Mgmt
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
11
-
-
4143050066
-
Managing design changes
-
Chapman, R. (1997), "Managing design changes", The Architects' Journal, Vol. 205, pp. 47-9.
-
(1997)
The Architects' Journal
, vol.205
, pp. 47-49
-
-
Chapman, R.1
-
13
-
-
0011107673
-
-
(Working Group 1), Construction Industry Board, Tomas Telford, London
-
CIB (1997), Briefing the Team, (Working Group 1), Construction Industry Board, Tomas Telford, London.
-
(1997)
Briefing the Team
-
-
-
15
-
-
4143142960
-
Feasibility studies
-
Best, R. and De Valence, G. (Eds), Wiley, New York, NY
-
Collins, T. (1999), "Feasibility studies", in Best, R. and De Valence, G. (Eds), Building in Value: Pre-Design Issues, 1st ed., Wiley, New York, NY.
-
(1999)
Building in Value: Pre-design Issues, 1st Ed.
-
-
Collins, T.1
-
16
-
-
0141455815
-
-
R.S. Means, Kingston, MA
-
Dell'lsola, A. (1997), Value Engineering: Practical Applications for Design, Construction, Maintenance and Operations, R.S. Means, Kingston, MA.
-
(1997)
Value Engineering: Practical Applications for Design, Construction, Maintenance and Operations
-
-
DelL'Lsola, A.1
-
17
-
-
4143070096
-
Project initiation
-
Best, R. and De Valence, G. (Eds), Wiley, New York, NY
-
De Valence, G. (1999), "Project initiation", in Best, R. and De Valence, G. (Eds), Building in Value: Pre-Design Issues, 1st ed., Wiley, New York, NY.
-
(1999)
Building in Value: Pre-design Issues, 1st Ed.
-
-
De Valence, G.1
-
18
-
-
4143129726
-
-
Al Wahdah-Express Printing Press, Abu Dhabi, UAE
-
DSSCB (2000), Commercial Buildings Directory, Al Wahdah-Express Printing Press, Abu Dhabi, UAE.
-
(2000)
Commercial Buildings Directory
-
-
-
20
-
-
0005402298
-
Analysis of conflict and change in construction projects
-
Gardiner, P. and Simmons, J. (1992), "Analysis of conflict and change in construction projects", Constr. Mgmt Econ., Vol. 10 No. 6, pp. 459-78.
-
(1992)
Constr. Mgmt Econ.
, vol.10
, Issue.6
, pp. 459-478
-
-
Gardiner, P.1
Simmons, J.2
-
21
-
-
3242657515
-
Research in building design
-
Department of Construction Management, University of Reading, UK
-
Goodacre, P., Pain, J., Murray, J. and Nobel, M. (1982), "Research in building design", Occasional Paper No. 7, Department of Construction Management, University of Reading, UK.
-
(1982)
Occasional Paper No. 7
, vol.7
-
-
Goodacre, P.1
Pain, J.2
Murray, J.3
Nobel, M.4
-
22
-
-
0032659199
-
Impact of change orders on labour efficiency for electrical construction
-
Hanna, A., Russell, J., Nordheim, E. and Bruggink, M. (1999), "Impact of change orders on labour efficiency for electrical construction", J. Constr. Eng. Mgmt, Vol. 125 No. 4, pp. 224-32.
-
(1999)
J. Constr. Eng. Mgmt
, vol.125
, Issue.4
, pp. 224-232
-
-
Hanna, A.1
Russell, J.2
Nordheim, E.3
Bruggink, M.4
-
23
-
-
0028386918
-
Change order management for construction projects
-
Hansen, F. (1994), "Change order management for construction projects", Constr. Eng., Vol. 36 No. 36, pp. 25-8.
-
(1994)
Constr. Eng.
, vol.36
, Issue.36
, pp. 25-28
-
-
Hansen, F.1
-
24
-
-
4143133030
-
Literature review report on briefing practices and links with other relevant projects
-
Hassanen, M. and Bouchlaghem, D. (1999), "Literature review report on briefing practices and links with other relevant projects", CoBrlTe Interim Report.
-
(1999)
CoBrlTe Interim Report
-
-
Hassanen, M.1
Bouchlaghem, D.2
-
26
-
-
4143117714
-
Briefing and design: The role of creativity
-
Baldry, D. and Ruddock, L. (Eds), COBRA 1999, RICS Construction and Building Research Conference, 1-2 September, University of Salford, UK
-
Hudson, J. (1999), "Briefing and design: the role of creativity", in Baldry, D. and Ruddock, L. (Eds), The Challenge of Change: Construction and Building for the New Millennium, COBRA 1999, RICS Construction and Building Research Conference, 1-2 September, University of Salford, UK.
-
(1999)
The Challenge of Change: Construction and Building for the New Millennium
-
-
Hudson, J.1
-
28
-
-
0003872655
-
-
The University of Salford, UK, ISBN No: 0-902896-17-2
-
Kagioglou, M., Cooper, R., Aouad, G., Hinks, J., Sexton, M. and Sheath, D.M. (1998), A Generic Guide to the Design and Construction Process Protocol, The University of Salford, UK, ISBN No: 0-902896-17-2.
-
(1998)
A Generic Guide to the Design and Construction Process Protocol
-
-
Kagioglou, M.1
Cooper, R.2
Aouad, G.3
Hinks, J.4
Sexton, M.5
Sheath, D.M.6
-
30
-
-
84986172369
-
Process model for client requirements processing in construction
-
Kamara, J., Anumba, C. and Evbuomwan, N. (2000), "Process model for client requirements processing in construction", J. Business Process Mgmt, Vol. 6 No. 3, pp. 251-79.
-
(2000)
J. Business Process Mgmt
, vol.6
, Issue.3
, pp. 251-279
-
-
Kamara, J.1
Anumba, C.2
Evbuomwan, N.3
-
31
-
-
0039059732
-
-
Butterworth-Heinemann Ltd, Oxford
-
Kernohan, D., Gray, J., Daish and Joiner, D. (1992), User Participation in Building Design and Management, 1st ed., Butterworth-Heinemann Ltd, Oxford.
-
(1992)
User Participation in Building Design and Management, 1st Ed.
-
-
Kernohan, D.1
Gray, J.D.2
Joiner, D.3
-
32
-
-
0003433430
-
-
McGraw-Hill, New York, NY
-
Kubal, M. (1994), Engineering Quality in Construction, 1st ed., McGraw-Hill, New York, NY.
-
(1994)
Engineering Quality in Construction, 1st Ed.
-
-
Kubal, M.1
-
34
-
-
0141937389
-
How designs develop: Insights from case studies in building engineering services
-
MacPherson, S.J., Kelly, J.R. and Webb, R.S. (1993), "How designs develop: insights from case studies in building engineering services", J. Constr. Mgmt Econ., Vol. 11 No. 6, pp. 475-85.
-
(1993)
J. Constr. Mgmt Econ.
, vol.11
, Issue.6
, pp. 475-485
-
-
MacPherson, S.J.1
Kelly, J.R.2
Webb, R.S.3
-
36
-
-
84992957706
-
Cause of delays in the construction industry in Lebanon
-
Mezher, T. and Tawil, W. (1998), "Cause of delays in the construction industry in Lebanon", Eng. Constr. Archit. Mgmt, Vol. 5 No. 3, pp. 252-60.
-
(1998)
Eng. Constr. Archit. Mgmt
, vol.5
, Issue.3
, pp. 252-260
-
-
Mezher, T.1
Tawil, W.2
-
37
-
-
4143142959
-
User satisfaction with public housing schemes in Abu Dhabi, United Arab Emirates
-
Mustapha, F.H. and Sabouni, A.R. (Eds)
-
Mustapha, F.H. and Bintaher, N.A. (2000), "User satisfaction with public housing schemes in Abu Dhabi, United Arab Emirates", in Mustapha, F.H. and Sabouni, A.R. (Eds), Challenges for the 21st Century: Proceedings of the XXV111 IAHS World Congress on Housing, pp. 217-37.
-
(2000)
Challenges for the 21st Century: Proceedings of the XXV111 IAHS World Congress on Housing
, pp. 217-237
-
-
Mustapha, F.H.1
Bintaher, N.A.2
-
38
-
-
4143141852
-
-
McGraw-Hill, New York, NY
-
O'Brien, J. (1998), Construction Change Orders, 1st ed., McGraw-Hill, New York, NY.
-
(1998)
Construction Change Orders, 1st Ed.
-
-
O'Brien, J.1
-
39
-
-
4143114412
-
-
McGraw-Hill, New York, NY
-
O'Leary, A. (1992), Construction Administration in Architectural Practice, 1st ed., McGraw-Hill, New York, NY.
-
(1992)
Construction Administration in Architectural Practice, 1st Ed.
-
-
O'Leary, A.1
-
40
-
-
0035368399
-
Value engineering and optimal building projects
-
Omigbodun, A. (2001), "Value engineering and optimal building projects", J. Archit. Eng., Vol. 7 No. 2, pp. 40-3.
-
(2001)
J. Archit. Eng.
, vol.7
, Issue.2
, pp. 40-43
-
-
Omigbodun, A.1
-
41
-
-
4143063463
-
-
Workshop, Briefing in Construction, 21 September, Loughborough University, UK
-
Phiri, M. and Haddon, C. (2000), Learning from Experience: Applying systematic Feedback to Improve the Briefing Process in Construction, Workshop, Briefing in Construction, 21 September, Loughborough University, UK.
-
(2000)
Learning from Experience: Applying Systematic Feedback to Improve the Briefing Process in Construction
-
-
Phiri, M.1
Haddon, C.2
-
43
-
-
4143144060
-
A proposed IT-based approach for managing the construction brief effectively
-
South Africa
-
Rezgui, Y., Body, S., Bouchlaghem, D., Hassanen, M., Cooper, G., Barrett, P. and Austin, S. (2001), "A proposed IT-based approach for managing the construction brief effectively", Proc. of the CIB - W78 Conference, South Africa.
-
(2001)
Proc. of the CIB - W78 Conference
-
-
Rezgui, Y.1
Body, S.2
Bouchlaghem, D.3
Hassanen, M.4
Cooper, G.5
Barrett, P.6
Austin, S.7
-
44
-
-
3242655792
-
-
Royal Institute of British Architects, London
-
RIBA (2000), The Architect's Plan of Work, Royal Institute of British Architects, London.
-
(2000)
The Architect's Plan of Work
-
-
-
45
-
-
3843152910
-
Criteria for strategic decision making at the pre-briefing stage
-
Hughes, W. (Ed.), Association of Research in Construction Management (ARCOM), 9-11 September, Reading University, UK
-
Smith, J. and Wyatt, R. (1998), "Criteria for strategic decision making at the pre-briefing stage", in Hughes, W. (Ed.), Association of Research in Construction Management (ARCOM), Proc. of the 14th Annu. Conf., 9-11 September, Reading University, UK, pp. 300-9.
-
(1998)
Proc. of the 14th Annu. Conf.
, pp. 300-309
-
-
Smith, J.1
Wyatt, R.2
-
46
-
-
4143057924
-
Studies on the impact of functional analysis concept design on reduction in change orders
-
Stocks, S. and Singh, A. (1999), "Studies on the impact of functional analysis concept design on reduction in change orders", Constr. Mgmt Econ., Vol. 17 No. 3, pp. 251-67.
-
(1999)
Constr. Mgmt Econ.
, vol.17
, Issue.3
, pp. 251-267
-
-
Stocks, S.1
Singh, A.2
-
48
-
-
0032166792
-
Analysing the impact of change orders on a schedule
-
Veenendaal, J. (1998), "Analysing the impact of change orders on a schedule", Cost Eng., Vol. 40 No. 9, pp. 33-9.
-
(1998)
Cost Eng.
, vol.40
, Issue.9
, pp. 33-39
-
-
Veenendaal, J.1
-
49
-
-
84993009940
-
Management errors in construction
-
Wantanakorn, D., Mawdesley, M.J. and Askew, W.H. (1999), "Management errors in construction", Eng. Constr. Archit. Mgmt, Vol. 6 No. 2, pp. 112-20.
-
(1999)
Eng. Constr. Archit. Mgmt
, vol.6
, Issue.2
, pp. 112-120
-
-
Wantanakorn, D.1
Mawdesley, M.J.2
Askew, W.H.3
|