-
1
-
-
3242721026
-
EBQ for a multi stage production system considering rework
-
Chakrabarty S., Rao N.V., "EBQ for a multi stage production systemconsidering rework", Opsearch, Vol.25, No.2, pp75-88, 1988
-
(1988)
Opsearch
, vol.25
, Issue.2
, pp. 75-88
-
-
Chakrabarty, S.1
Rao, N.V.2
-
2
-
-
0026116409
-
An economic order quantity model with production processes
-
Cheng T.C.E., "An economic order quantity model with productionprocesses", HE Transactions, Vol.23, No.1,pp23-28, 1991
-
(1991)
HE Transactions
, vol.23
, Issue.1
, pp. 23-28
-
-
Cheng, T.C.E.1
-
3
-
-
0021387520
-
Looping in a multistage production system
-
Gupta T., Chakraborty S., "Looping in a multistage productionsystem", International Journal of Production Research, Vol.22, No.2,pp299-311, 1984
-
(1984)
International Journal of Production Research
, vol.22
, Issue.2
, pp. 299-311
-
-
Gupta, T.1
Chakraborty, S.2
-
4
-
-
45849091113
-
Lot sizing with non-zero setup times for rework
-
Haji R., Haji A., Sajadifar M., Zolfaghari S., "Lot sizing withnon-zero setup times for rework", Journal of Systems Science and SystemsEngineering, Vol.17, No.2, pp230-240, 2008
-
(2008)
Journal of Systems Science and Systems Engineering
, vol.17
, Issue.2
, pp. 230-240
-
-
Haji, R.1
Haji, A.2
Sajadifar, M.3
Zolfaghari, S.4
-
5
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality itemproduced
-
Hayek PA., Salameh M.K., "Production lot sizing with the reworkingof imperfect quality item produced", Production Planning and Control,Vol.12, No.6,pp584-590, 2001
-
(2001)
Production Planning and Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
6
-
-
3242701287
-
Optimal manufacturing batch size with network process at a single-stageproduction system
-
Jamal A.M.M., Sarker B.R., Mondal S., "Optimal manufacturing batchsize with network process at a single-stage production system", Computers& Industrial Engineering, Vol.47; pp77-89, 2004
-
(2004)
Computers & Industrial Engineering
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
8
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedulesin a production system
-
Lee H. L., Rosenblatt M. J., "Simultaneous determination ofproduction cycle and inspection schedules in a production system", Management science , Vol. 33, No.9, pp 1125-1136, 1987
-
(1987)
Management science
, vol.33
, Issue.9
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
9
-
-
0001012373
-
Lot sizing to reduce capacity utilization in production process withdefective item, process corrections and rework
-
Lee H.L., "Lot sizing to reduce capacity utilization in productionprocess with defective item, process corrections and rework", ManagementScience , Vol. 38, No. 9, pp 1314 -1328, 1992
-
(1992)
Management Science
, vol.38
, Issue.9
, pp. 1314-1328
-
-
Lee, H.L.1
-
10
-
-
0031237390
-
Optimal batch size and investment in multistage production systems withscrap
-
Lee H.L., Chandra M.J., Deleveaux V.J., "Optimal batch size andinvestment in multistage production systems with scrap", ProductionPlanning and Control, Vol.8, No.6, pp586-596, 1997
-
(1997)
Production Planning and Control
, vol.8
, Issue.6
, pp. 586-596
-
-
Lee, H.L.1
Chandra, M.J.2
Deleveaux, V.J.3
-
12
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
Porteus E.L., "Optimal lot sizing, process quality improvement andsetup cost reduction", Operations Research, Vol.34, No.1, pp 137-144, 1986
-
(1986)
Operations Research
, vol.34
, Issue.1
, pp. 137-144
-
-
Porteus, E.L.1
-
13
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Resenblatt M. J., Lee H.L., "Economic production cycles withimperfect production processes", HE Transactions, Vol.18, No.1, pp 48-55,1986
-
(1986)
HE Transactions
, vol.18
, Issue.1
, pp. 48-55
-
-
Resenblatt, M.J.1
Lee, H.L.2
-
14
-
-
34548565651
-
Optimal batch sizing in a process at multi-stage production system withnetwork consideration
-
Sarker B.R.J, amal A.M.M., Mondal S., "Optimal batch sizing in aprocess at multi-stage production system with network consideration", European Journal of Operational research, Vol.184, No.3, pp 915-929, 2008
-
(2008)
European Journal of Operational research
, vol.184
, Issue.3
, pp. 915-929
-
-
Sarker, B.R.J.1
Amal, A.M.M.2
Mondal, S.3
-
16
-
-
0024144176
-
EOQ under inspection costs
-
Schwaller R.L., "EOQ under inspection costs", Production andInventory Management journal, Vol.29, No.3,pp22-24, 1988
-
(1988)
Production and Inventory Management journal
, vol.29
, Issue.3
, pp. 22-24
-
-
Schwaller, R.L.1
-
17
-
-
0025399639
-
Joint lot sizing and inspection policy in an EOQ model with random yield
-
Zhang X., Gerchak Y., "Joint lot sizing and inspection policy in anEOQ model with random yield", HE Transactions Vol.22, No.1, pp41-47, 1990
-
(1990)
HE Transactions
, vol.22
, Issue.1
, pp. 41-47
-
-
Zhang, X.1
Gerchak, Y.2
|