-
2
-
-
0003727195
-
-
2nd Ed., Wiley, New York.
-
Ahuja, H., Dozzi, S. P., and AbouRizk, S. M. (1994). Project management techniques in planning and controlling construction projects, 2nd Ed., Wiley, New York.
-
(1994)
Project Management Techniques in Planning and Controlling Construction Projects
-
-
Ahuja, H.1
Dozzi, S.P.2
Abourizk, S.M.3
-
3
-
-
0022404044
-
Simulation model to forecast project completion time
-
Ahuja, N. T. H., and Nandakumar, V. (1985). " Simulation model to forecast project completion time.. " J. Constr. Eng. Manage., 111 (4), 325-342.
-
(1985)
J. Constr. Eng. Manage.
, vol.111
, Issue.4
, pp. 325-342
-
-
Ahuja, N.T.H.1
Nandakumar, V.2
-
4
-
-
0003799788
-
-
Wiley, New York.
-
Ang, A. H-S., and Tang, W. H. (1975). Probability concepts in engineering planning and design, Vol. I, Wiley, New York.
-
(1975)
Probability Concepts in Engineering Planning and Design
, vol.1
-
-
Ang, A.H.-S.1
Tang, W.H.2
-
5
-
-
0004146280
-
-
3rd Ed., McGraw-Hill, New York.
-
Barrie, D. S., and Paulson, B. C. (1992). Professional construction management including CM, design-contract, and general contracting, 3rd Ed., McGraw-Hill, New York.
-
(1992)
Professional Construction Management Including CM, Design-contract, and General Contracting
-
-
Barrie, D.S.1
Paulson, B.C.2
-
6
-
-
0035509406
-
Discussion: Simplified CPM/PERT simulation model
-
Bennett, F. L. (2001). " Discussion: Simplified CPM/PERT simulation model.. " J. Constr. Eng. Manage., 127 (6), 513-514.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.6
, pp. 513-514
-
-
Bennett, F.L.1
-
7
-
-
0017539360
-
Analysis of schedule simulation
-
Crandall, C. K. (1977). " Analysis of schedule simulation.. " J. Constr. Div., Am. Soc. Civ. Eng., 133 (2), 387-394.
-
(1977)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.133
, Issue.2
, pp. 387-394
-
-
Crandall, C.K.1
-
8
-
-
85044105309
-
PERT and simulation
-
Douglas, E. D. (1978). " PERT and simulation.. " Proc., 10th Conf. on Winter Simulation, Vol. 1, Miami Beach, Fla, 89-98.
-
(1978)
Proc., 10th Conf. on Winter Simulation
, vol.1
, pp. 89-98
-
-
Douglas, E.D.1
-
9
-
-
0004083354
-
-
Wiley, New York.
-
Evans, M., Hastings, N., and Peacock, B. (2000). Statistical distributions, Wiley, New York.
-
(2000)
Statistical Distributions
-
-
Evans, M.1
Hastings, N.2
Peacock, B.3
-
10
-
-
0033315084
-
Simphony: An environment for building special purpose construction simulation tools
-
IEEE, Piscataway, N.J.
-
Hajjar, D., and AbouRizk, S. M. (1999). " Simphony: An environment for building special purpose construction simulation tools.. " Proc., 1999 Winter Simulation Conf., IEEE, Piscataway, N.J., 998-1006.
-
(1999)
Proc., 1999 Winter Simulation Conf.
, pp. 998-1006
-
-
Hajjar, D.1
Abourizk, S.M.2
-
12
-
-
84858543318
-
Advanced quantitative schedule risk analysis
-
Hulett & Associates, LLC. 〈
-
Hulett, T. D. (2004). " Advanced quantitative schedule risk analysis.. " White paper, Hulett & Associates, LLC. 〈 http://www.cs-solutions.com/downloadfiles/quantschriskanalysis.doc 〉 (Feb. 1, 2004).
-
(2004)
White Paper
-
-
Hulett, T.D.1
-
13
-
-
0003656321
-
-
Dept. of Civil Engineering, The Univ. of Michigan, Ann Arbor, Mich.
-
Ioannou, P. G. (1989). UM_CYCLONE user's guide, Dept. of Civil Engineering, The Univ. of Michigan, Ann Arbor, Mich.
-
(1989)
UM_CYCLONE User's Guide
-
-
Ioannou, P.G.1
-
14
-
-
12744266478
-
-
Prentice-Hall, Upper Saddle River, N.J.
-
Khisty, C. J., and Mohammadi, J. (2001). Fundamentals of system engineering with economics, probability, and statistics, Prentice-Hall, Upper Saddle River, N.J.
-
(2001)
Fundamentals of System Engineering with Economics, Probability, and Statistics
-
-
Khisty, C.J.1
Mohammadi, J.2
-
15
-
-
0004312378
-
-
3rd Ed., McGraw-Hill, Boston.
-
Law, M. A., and Kelton, W. D. (2000). Simulation modeling and analysis, 3rd Ed., McGraw-Hill, Boston.
-
(2000)
Simulation Modeling and Analysis
-
-
Law, M.A.1
Kelton, W.D.2
-
16
-
-
14544303228
-
Probability of project completion using stochastic project scheduling simulation
-
Lee, D. E. (2005). " Probability of project completion using stochastic project scheduling simulation.. " J. Constr. Eng. Manage., 131 (3), 310-318.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.3
, pp. 310-318
-
-
Lee, D.E.1
-
17
-
-
0345813224
-
Simplified CPM/PERT simulation model
-
Lu, M., and AbouRizk, S. M. (2000). " Simplified CPM/PERT simulation model.. " J. Constr. Eng. Manage., 126 (3), 219-226.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.3
, pp. 219-226
-
-
Lu, M.1
Abourizk, S.M.2
-
18
-
-
14544272168
-
-
RM-3408-PR, Rand, Santa Monica, Calif.
-
McCrimmon, K. R., and Ryavec, C. A. (1962). " An analytical study of the PERT assumptions.. " Memorandum RM-3408-PR, Rand, Santa Monica, Calif.
-
(1962)
An Analytical Study of the PERT Assumptions
-
-
McCrimmon, K.R.1
Ryavec, C.A.2
-
19
-
-
0031371933
-
State-based probabilistic scheduling using STROBOSCOPE's CPM add-on
-
Stuart D.Anderson, ed., ASCE, Minneapolis
-
Martinez, C. J., and Ioannou, P. G. (1997) " State-based probabilistic scheduling using STROBOSCOPE's CPM add-on.. " Proc., 5th Construction Congress, Stuart D. Anderson, ed., ASCE, Minneapolis, 438-445.
-
(1997)
Proc., 5th Construction Congress
, pp. 438-445
-
-
Martinez, C.J.1
Ioannou, P.G.2
-
20
-
-
0032677122
-
General purpose systems for effective construction simulation
-
Martinez, J. C., and Ioannou, P. G. (1999). " General purpose systems for effective construction simulation.. " J. Constr. Eng. Manage. 125 (4), 265-276.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.4
, pp. 265-276
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
21
-
-
0003906653
-
-
3rd Ed., Van Nostrand-Reinhold, New York.
-
Moder, J. J., Phillips, R. C., and Davis, W. E. (1983). Project management with CPM, PERT, and precedence diagramming., 3rd Ed., Van Nostrand-Reinhold, New York.
-
(1983)
Project Management with CPM, PERT, and Precedence Diagramming.
-
-
Moder, J.J.1
Phillips, R.C.2
Davis, W.E.3
-
24
-
-
0032684768
-
Activity-based construction (ABC) modeling and simulation method
-
Shi, J. (1999). " Activity-based construction (ABC) modeling and simulation method.. " J. Constr. Eng. Manage., 125 (5), 354-360.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 354-360
-
-
Shi, J.1
-
25
-
-
84858545821
-
Simphony
-
NSERC/Alberta Construction Industry 〈(June 1, 2003)
-
Simphony. (2003). " Template for project scheduling risk.. " NSERC/Alberta Construction Industry 〈 http://irc.construction.ualberta.ca/ html/research/PERT.html 〉 (June 1, 2003).
-
(2003)
Template for Project Scheduling Risk
-
-
-
26
-
-
0000738834
-
Monte Carlo Methods and the PERT problem
-
Van Slyke, M. R. (1963). " Monte Carlo Methods and the PERT problem.. " Oper. Res., 11, 839-860.
-
(1963)
Oper. Res.
, vol.11
, pp. 839-860
-
-
Van Slyke, M.R.1
|