Volumn 14, Issue 5, 2010, Pages 663-671

Measuring Risk-associated Activity's Duration: A Fuzzy Set Theory Application

Author keywords

CPM (Critical Path Method); fuzzy mean; fuzzy set; MCS (Monte Carlo Simulation); PERT (Program Evaluation and Review Technique); schedule risk

Indexed keywords

CONSTRUCTION PROJECTS; CRITICAL PATH METHOD; FUZZY MEANS; INDUSTRY EXPERTS; MONTE CARLO SIMULATION; PROBABILISTIC ANALYSIS; PROGRAM EVALUATION AND REVIEW TECHNIQUE; PROJECT DURATION; PROJECT SCHEDULES; PROS AND CONS; RISK QUANTIFICATION; SCHEDULE RISK;

EID: 77955709609     PISSN: 12267988     EISSN: 19763808     Source Type: Journal    
DOI: 10.1007/s12205-010-1003-x     Document Type: Article
Times cited : (16)

References (29)
  • 2
    • 0020551487 scopus 로고
    • Regional management of an aquifer for mining under fuzzy environmental objectives
    • Bogardi, I. and Bardossy, A. (1983). "Regional management of an aquifer for mining under fuzzy environmental objectives." Water Resources Research, Vol. 19, No. 6, pp. 1394-1402.
    • (1983) Water Resources Research , vol.19 , Issue.6 , pp. 1394-1402
    • Bogardi, I.1    Bardossy, A.2
  • 5
    • 0002146440 scopus 로고    scopus 로고
    • Chanas, S. and Kamburowski, J. (1981). "The use of fuzzy variables in PERT." Fuzzy Sets Systems, No. 5, pp. 11-19.
  • 6
    • 13944284177 scopus 로고    scopus 로고
    • Object-oriented evolutionary fuzzy neural inference system for construction management
    • Cheng, M. and Ko, C. H. (2003). "Object-oriented evolutionary fuzzy neural inference system for construction management." Journal of Construction Engineering and Management, ASCE, Vol. 129, No. 4, pp. 461-469.
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 461-469
    • Cheng, M.1    Ko, C.H.2
  • 8
    • 77955716989 scopus 로고    scopus 로고
    • Construction Industry Institute (CII) (1987). Project control for construction, Publication No. 6-5.
  • 9
    • 77955715339 scopus 로고    scopus 로고
    • Crystal Ball (2004). Decisioneering, Inc., Denver, Colorado, USA.
  • 12
    • 33751267988 scopus 로고    scopus 로고
    • Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana
    • Frimpong, Y. and Oluwoye, J. (2003). "Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana." Journal of Construction Research, Vol. 4, No. 2, pp. 175-187.
    • (2003) Journal of Construction Research , vol.4 , Issue.2 , pp. 175-187
    • Frimpong, Y.1    Oluwoye, J.2
  • 14
    • 0030286425 scopus 로고    scopus 로고
    • Hapke, M. and Slovinski, R. (1996). Fuzzy priority heuristics for project scheduling, Fuzzy Sets and Systems, No. 83, pp. 291-299.
  • 15
    • 0021439748 scopus 로고
    • Criticism of CPM for project planning analysis
    • Jaafari, A. J. (1984) "Criticism of CPM for project planning analysis." Journal of Construction Engineering and Management, ASCE, Vol. 110, No. 2, June, pp. 222-233.
    • (1984) Journal of Construction Engineering and Management , vol.110 , Issue.2 , pp. 222-233
    • Jaafari, A.J.1
  • 17
    • 12744251343 scopus 로고    scopus 로고
    • Use of fuzzy logic for predicting design cost overruns on building projects
    • Knight, K. and Fayek, A. R. (2002). "Use of fuzzy logic for predicting design cost overruns on building projects." Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 6, pp. 503-512.
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.6 , pp. 503-512
    • Knight, K.1    Fayek, A.R.2
  • 18
    • 33746190774 scopus 로고    scopus 로고
    • Critical factors affecting schedule performance: Evidence from Indian construction projects
    • Lyer, K. C. and Jha, K. N. (2006) "Critical factors affecting schedule performance: Evidence from Indian construction projects." Journal of Construction Engineering and Management, ASCE, Vol. 132, No. 8, pp. 871-881.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.8 , pp. 871-881
    • Lyer, K.C.1    Jha, K.N.2
  • 19
    • 13944275955 scopus 로고    scopus 로고
    • Evaluating Risk in Construction-Schedule model (ERIC-S): Construction schedule risk model
    • Nasir, d., McCabe, B., and Hartono, L. (2003). "Evaluating Risk in Construction-Schedule model (ERIC-S): Construction schedule risk model," Journal of Construction Engineering and Management, ASCE, Vol. 129, No. 5, pp. 518-527.
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 518-527
    • Nasir, D.1    McCabe, B.2    Hartono, L.3
  • 22
    • 0005052286 scopus 로고    scopus 로고
    • Activity duration quantification under uncertainty: Fuzzy set theory application
    • Ock, J. H. (1996). "Activity duration quantification under uncertainty: fuzzy set theory application." Cost Engineering, Vol. 38, No. 1, pp. 26-29.
    • (1996) Cost Engineering , vol.38 , Issue.1 , pp. 26-29
    • Ock, J.H.1
  • 25
    • 0003138676 scopus 로고
    • Quantification and management of uncertainty in activity duration networks
    • Ranasinghe, M. (1994). "Quantification and management of uncertainty in activity duration networks." Construction Management and Economics, Vol. 12, pp. 15-29.
    • (1994) Construction Management and Economics , vol.12 , pp. 15-29
    • Ranasinghe, M.1
  • 28
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh, L. A. (1965). "Fuzzy sets." Information and Control, Vol. 8, No. 3, pp. 338-353.
    • (1965) Information and Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1