메뉴 건너뛰기




Volumn 129, Issue 2, 2001, Pages 355-361

Iron ore production scheduling to improve product quality

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; DECISION SUPPORT SYSTEMS; DECISION THEORY; IRON ORES; MATHEMATICAL MODELS; PRODUCTION ENGINEERING; QUALITY CONTROL; SCHEDULING;

EID: 0035284051     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(00)00233-2     Document Type: Article
Times cited : (44)

References (8)
  • 1
    • 0004309818 scopus 로고    scopus 로고
    • Australian Bureau of Statistics, Australian Bureau of Statistics, Canberra, Australia
    • Australian Bureau of Statistics, 1999. Year Book Australia. Australian Bureau of Statistics, Canberra, Australia.
    • (1999) Year Book Australia
  • 3
    • 0041116929 scopus 로고    scopus 로고
    • Iron ore handling procedures enhance export quality
    • Everett J.E. Iron ore handling procedures enhance export quality. Interfaces. 26(6):1996;82-94.
    • (1996) Interfaces , vol.26 , Issue.6 , pp. 82-94
    • Everett, J.E.1
  • 4
    • 0031097047 scopus 로고    scopus 로고
    • Simulation to reduce variability in iron ore stockpiles
    • Everett J.E. Simulation to reduce variability in iron ore stockpiles. Mathematics and Computers in Simulation. 43:1997;563-568.
    • (1997) Mathematics and Computers in Simulation , vol.43 , pp. 563-568
    • Everett, J.E.1
  • 8
    • 0040743779 scopus 로고
    • TEX, The TEX Report Co., Tokyo
    • TEX, 1995. Iron Ore Manual 1994-95, The TEX Report Co., Tokyo.
    • (1995) Iron Ore Manual 1994-95


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.