메뉴 건너뛰기




Volumn 41, Issue 7-8, 2010, Pages 1011-1022

A modified Pareto genetic algorithm for multi-objective build-to-order supply chain planning with product assembly

Author keywords

Build to order supply chain; Logistic distribution system; Pareto genetic algorithm; Product assembly; Supplier selection

Indexed keywords

GENETIC ALGORITHMS; MATHEMATICAL MODELS; MULTIOBJECTIVE OPTIMIZATION; PARETO PRINCIPLE; SUPPLY CHAIN MANAGEMENT; SUPPLY CHAINS;

EID: 77955465920     PISSN: 09659978     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.advengsoft.2010.04.001     Document Type: Article
Times cited : (73)

References (39)
  • 1
    • 33749042087 scopus 로고    scopus 로고
    • A genetic algorithm approach for multi-objective optimization of supply chain networks
    • F. Altiparmak, M. Gen, L. Lin, and T. Paksoy A genetic algorithm approach for multi-objective optimization of supply chain networks Comput Ind Eng 51 1 2006 196 215
    • (2006) Comput Ind Eng , vol.51 , Issue.1 , pp. 196-215
    • Altiparmak, F.1    Gen, M.2    Lin, L.3    Paksoy, T.4
  • 2
    • 30344445721 scopus 로고    scopus 로고
    • The Williams and Otto Chemical Plant re-evaluated using a pareto-optimal formulation aided by genetic algorithms
    • N. Chakraborti, P. Mishra, A. Aggarwal, A. Banerjee, and S.S. Mukherjee The Williams and Otto Chemical Plant re-evaluated using a pareto-optimal formulation aided by genetic algorithms Appl Soft Comput 6 2 2006 189 197
    • (2006) Appl Soft Comput , vol.6 , Issue.2 , pp. 189-197
    • Chakraborti, N.1    Mishra, P.2    Aggarwal, A.3    Banerjee, A.4    Mukherjee, S.S.5
  • 3
    • 77951111988 scopus 로고    scopus 로고
    • Using fuzzy analytic hierarchy process and particle swarm optimisation for balanced and defective supply chain problems considering WEEE/RoHS directives
    • Z.H. Che Using fuzzy analytic hierarchy process and particle swarm optimisation for balanced and defective supply chain problems considering WEEE/RoHS directives Int J Prod Res 48 11 2010 3355 3381
    • (2010) Int J Prod Res , vol.48 , Issue.11 , pp. 3355-3381
    • Che, Z.H.1
  • 4
    • 33646523595 scopus 로고    scopus 로고
    • A fuzzy approach for supplier evaluation and selection in supply chain management
    • C.T. Chen, C.T. Lin, and S.F. Huang A fuzzy approach for supplier evaluation and selection in supply chain management Int J Prod Econ 102 2006 289 301
    • (2006) Int J Prod Econ , vol.102 , pp. 289-301
    • Chen, C.T.1    Lin, C.T.2    Huang, S.F.3
  • 5
    • 53749102173 scopus 로고    scopus 로고
    • Parameter optimization for growth model of greenhouse crop using genetic algorithms
    • C. Dai, M. Yao, Z. Xie, C. Chen, and J. Liu Parameter optimization for growth model of greenhouse crop using genetic algorithms Appl Soft Comput 9 1 2009 13 19
    • (2009) Appl Soft Comput , vol.9 , Issue.1 , pp. 13-19
    • Dai, C.1    Yao, M.2    Xie, Z.3    Chen, C.4    Liu, J.5
  • 6
    • 0002750342 scopus 로고
    • An analysis of supplier selection system and decision
    • G.W. Dickson An analysis of supplier selection system and decision J Purch 2 1 1966 5 17
    • (1966) J Purch , vol.2 , Issue.1 , pp. 5-17
    • Dickson, G.W.1
  • 7
    • 52149122815 scopus 로고    scopus 로고
    • Multi-objective optimization method and its application based on pareto sets
    • Y. Fei, N.N. Li, and Z.G. Han Multi-objective optimization method and its application based on pareto sets Hoist Convey Mach 2006 9 2006 13 15
    • (2006) Hoist Convey Mach , vol.2006 , Issue.9 , pp. 13-15
    • Fei, Y.1    Li, N.N.2    Han, Z.G.3
  • 10
    • 52049091501 scopus 로고    scopus 로고
    • Optimal vendor selection in a multiproduct supply chain with truckload discounts
    • T.S. Glickmana, and S.C. White Optimal vendor selection in a multiproduct supply chain with truckload discounts Transport Res Part E - Logist Transport Rev 44 5 2008 684 695
    • (2008) Transport Res Part e - Logist Transport Rev , vol.44 , Issue.5 , pp. 684-695
    • Glickmana, T.S.1    White, S.C.2
  • 11
    • 33751001338 scopus 로고    scopus 로고
    • Exact algorithms for procurement problems under a total quantity discount structure
    • D.R. Goossens, A.J.T. Maas, F.C.R. Spieksma, and J.J. van de Klundert Exact algorithms for procurement problems under a total quantity discount structure Eur J Oper Res 178 2 2007 603 626
    • (2007) Eur J Oper Res , vol.178 , Issue.2 , pp. 603-626
    • Goossens, D.R.1    Maas, A.J.T.2    Spieksma, F.C.R.3    Van De Klundert, J.J.4
  • 12
    • 19944406092 scopus 로고    scopus 로고
    • The build-to-order supply chain (BOSC): A competitive strategy for 21st century
    • A. Gunasekaran The build-to-order supply chain (BOSC): a competitive strategy for 21st century J Oper Manage 23 5 2005 419 422
    • (2005) J Oper Manage , vol.23 , Issue.5 , pp. 419-422
    • Gunasekaran, A.1
  • 13
    • 34748857408 scopus 로고    scopus 로고
    • Responsive supply chain: A competitive strategy in a networked economy
    • A. Gunasekaran, K.H. Lai, and E.T.C. Cheng Responsive supply chain: a competitive strategy in a networked economy Omega 36 4 2008 549 564
    • (2008) Omega , vol.36 , Issue.4 , pp. 549-564
    • Gunasekaran, A.1    Lai, K.H.2    Cheng, E.T.C.3
  • 14
    • 56249121909 scopus 로고    scopus 로고
    • Modeling and analysis of build-to-order supply chains
    • A. Gunasekaran, and E.W.T. Ngai Modeling and analysis of build-to-order supply chains Eur J Oper Res 195 2 2009 319 334
    • (2009) Eur J Oper Res , vol.195 , Issue.2 , pp. 319-334
    • Gunasekaran, A.1    Ngai, E.W.T.2
  • 15
    • 36148940671 scopus 로고    scopus 로고
    • A hybrid approach to supplier selection for the maintenance of a competitive supply chain
    • S.H. Ha, and R. Krishnan A hybrid approach to supplier selection for the maintenance of a competitive supply chain Expert Syst Appl 34 2008 1303 1311
    • (2008) Expert Syst Appl , vol.34 , pp. 1303-1311
    • Ha, S.H.1    Krishnan, R.2
  • 16
    • 16344388433 scopus 로고    scopus 로고
    • Design of electrically small wire antennas using a pareto genetic algorithm
    • C. Hosung, R.L. Rogers, and L. Hao Design of electrically small wire antennas using a pareto genetic algorithm IEEE Trans Antennas Propag 53 3 2005 1038 1046
    • (2005) IEEE Trans Antennas Propag , vol.53 , Issue.3 , pp. 1038-1046
    • Hosung, C.1    Rogers, R.L.2    Hao, L.3
  • 17
    • 0001913404 scopus 로고
    • International supply chain management
    • J.B. Houlihan International supply chain management Int J Phys D Mater Manage 15 1 1985 22 38
    • (1985) Int J Phys D Mater Manage , vol.15 , Issue.1 , pp. 22-38
    • Houlihan, J.B.1
  • 18
    • 33748585960 scopus 로고    scopus 로고
    • Automotive supplier parks: An imperative for build-to-order
    • M. Howard, J. Miemczykb, and A. Graves Automotive supplier parks: an imperative for build-to-order J Purch Supply Manage 12 2006 91 104
    • (2006) J Purch Supply Manage , vol.12 , pp. 91-104
    • Howard, M.1    Miemczykb, J.2    Graves, A.3
  • 19
    • 0001913403 scopus 로고
    • Using inventory for competitive advantage through supply chain management
    • T.C. Jones, and D.W. Riley Using inventory for competitive advantage through supply chain management Int J Phys D Mater Manage 15 5 1985 16 26
    • (1985) Int J Phys D Mater Manage , vol.15 , Issue.5 , pp. 16-26
    • Jones, T.C.1    Riley, D.W.2
  • 20
    • 19944400423 scopus 로고    scopus 로고
    • Responding to schedule changes in build-to-order supply chains
    • L. Krajewski, J.C. Wei, and L.L. Tang Responding to schedule changes in build-to-order supply chains J Oper Manage 23 5 2005 452 469
    • (2005) J Oper Manage , vol.23 , Issue.5 , pp. 452-469
    • Krajewski, L.1    Wei, J.C.2    Tang, L.L.3
  • 21
    • 36048991730 scopus 로고    scopus 로고
    • Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
    • K. Li, A.I. Sivakumar, and V.K. Ganesan Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain Eur J Oper Res 187 2 2008 442 455
    • (2008) Eur J Oper Res , vol.187 , Issue.2 , pp. 442-455
    • Li, K.1    Sivakumar, A.I.2    Ganesan, V.K.3
  • 22
    • 33750358829 scopus 로고    scopus 로고
    • A multi-objective supplier selection model under stochastic demand conditions
    • Z. Liaoa, and J. Rittscherb A multi-objective supplier selection model under stochastic demand conditions Int J Prod Econ 105 2006 150 159
    • (2006) Int J Prod Econ , vol.105 , pp. 150-159
    • Liaoa, Z.1    Rittscherb, J.2
  • 24
    • 0035742156 scopus 로고    scopus 로고
    • A pareto-optimal genetic algorithm for warehouse multi-objective optimization
    • P.N. Poulos, G.G. Rigatos, S.G. Tzafestas, and A.K. Koukos A pareto-optimal genetic algorithm for warehouse multi-objective optimization Eng Appl Artif Intell 14 6 2001 737 749
    • (2001) Eng Appl Artif Intell , vol.14 , Issue.6 , pp. 737-749
    • Poulos, P.N.1    Rigatos, G.G.2    Tzafestas, S.G.3    Koukos, A.K.4
  • 25
    • 19944416267 scopus 로고    scopus 로고
    • Build to order supply chains in developed and developing countries
    • S. Prasad, J. Tata, and M. Madan Build to order supply chains in developed and developing countries J Oper Manage 23 5 2005 551 568
    • (2005) J Oper Manage , vol.23 , Issue.5 , pp. 551-568
    • Prasad, S.1    Tata, J.2    Madan, M.3
  • 26
    • 33947165157 scopus 로고    scopus 로고
    • Supply chain models for an assembly system with preprocessing of raw materials
    • M.A.A. Rahman, and B.R. Sarker Supply chain models for an assembly system with preprocessing of raw materials Eur J Oper Res 181 2007 733 752
    • (2007) Eur J Oper Res , vol.181 , pp. 733-752
    • Rahman, M.A.A.1    Sarker, B.R.2
  • 28
    • 30744456799 scopus 로고    scopus 로고
    • Supply chain network design: Partner selection and production/ distribution planning using a systematic model
    • D.Y. Sha, and Z.H. Che Supply chain network design: partner selection and production/distribution planning using a systematic model J Oper Res Soc 57 1 2006 52 62
    • (2006) J Oper Res Soc , vol.57 , Issue.1 , pp. 52-62
    • Sha, D.Y.1    Che, Z.H.2
  • 29
    • 10444289741 scopus 로고    scopus 로고
    • A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II
    • A.S. Simaria, and P.M. Vilarinho A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II Comput Ind Eng 47 4 2004 391 407
    • (2004) Comput Ind Eng , vol.47 , Issue.4 , pp. 391-407
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 30
    • 56349156927 scopus 로고    scopus 로고
    • Parameter estimation in mathematical models using the real coded genetic algorithms
    • N. Tutkun Parameter estimation in mathematical models using the real coded genetic algorithms Expert Syst Appl 36 2 2009 3342 3345
    • (2009) Expert Syst Appl , vol.36 , Issue.2 , pp. 3342-3345
    • Tutkun, N.1
  • 31
    • 34247483009 scopus 로고    scopus 로고
    • Vendor selection in outsourcing
    • V. Wadhwa, and A.R. Ravindran Vendor selection in outsourcing Comput Oper Res 34 12 2007 3725 3737
    • (2007) Comput Oper Res , vol.34 , Issue.12 , pp. 3725-3737
    • Wadhwa, V.1    Ravindran, A.R.2
  • 33
    • 0142146459 scopus 로고    scopus 로고
    • Vendor: A structured approach to vendor selection and negotiation
    • C.A. Weber, J.R. Current, and A. Desai Vendor: a structured approach to vendor selection and negotiation J Bus Logist 21 1 2000 135 167
    • (2000) J Bus Logist , vol.21 , Issue.1 , pp. 135-167
    • Weber, C.A.1    Current, J.R.2    Desai, A.3
  • 34
    • 39149105585 scopus 로고    scopus 로고
    • A class of multi-objective supply chain networks optimal model under random fuzzy environment and its application to the industry of Chinese liquor
    • J. Xu, Q. Liu, and R. Wang A class of multi-objective supply chain networks optimal model under random fuzzy environment and its application to the industry of Chinese liquor Inf Sci 178 2008 2022 2043
    • (2008) Inf Sci , vol.178 , pp. 2022-2043
    • Xu, J.1    Liu, Q.2    Wang, R.3
  • 35
    • 33748961305 scopus 로고    scopus 로고
    • Modeling and analysis of a supply-assembly-store chain
    • X. Zhao, D. Xu, H. Zhang, and Q. He Modeling and analysis of a supply-assembly-store chain Eur J Oper Res 176 2007 275 294
    • (2007) Eur J Oper Res , vol.176 , pp. 275-294
    • Zhao, X.1    Xu, D.2    Zhang, H.3    He, Q.4
  • 36
    • 77953633520 scopus 로고    scopus 로고
    • Multiobjective collaborative optimization based on BP neural network and pareto genetic algorithm
    • S.Q. Zhou, and J.W. Xiang Multiobjective collaborative optimization based on BP neural network and pareto genetic algorithm Mach Des Res 22 5 2006 10 13
    • (2006) Mach des Res , vol.22 , Issue.5 , pp. 10-13
    • Zhou, S.Q.1    Xiang, J.W.2
  • 37
    • 0742273919 scopus 로고    scopus 로고
    • Multiobjective optimization design with mixed-discrete variables in mechanical engineering via pareto genetic algorithm
    • X.J. Zhu, D. Pan, A.L. Wang, H.Q. Zhang, and Q.T. Ye Multiobjective optimization design with mixed-discrete variables in mechanical engineering via pareto genetic algorithm J Shanghai Jiaotong Univ 34 3 2000 411 414
    • (2000) J Shanghai Jiaotong Univ , vol.34 , Issue.3 , pp. 411-414
    • Zhu, X.J.1    Pan, D.2    Wang, A.L.3    Zhang, H.Q.4    Ye, Q.T.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.