메뉴 건너뛰기




Volumn 176, Issue 1, 2007, Pages 275-294

Modeling and analysis of a supply-assembly-store chain

Author keywords

Inventory; Markov chain; Mixed model assembly line; Service level; Supply chain; Work in process

Indexed keywords

CUSTOMER SATISFACTION; INDUSTRIAL MANAGEMENT; MARKOV PROCESSES; OPERATIONS RESEARCH; OPTIMIZATION;

EID: 33748961305     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2005.06.053     Document Type: Article
Times cited : (19)

References (34)
  • 1
    • 1342308494 scopus 로고    scopus 로고
    • Analysis of parts requirements variance for a JIT supply chain
    • Aigbedo H. Analysis of parts requirements variance for a JIT supply chain. International Journal of Production Research 42 (2004) 417-430
    • (2004) International Journal of Production Research , vol.42 , pp. 417-430
    • Aigbedo, H.1
  • 3
    • 0342398236 scopus 로고    scopus 로고
    • Exact analysis of continuous review (R, Q) policies in two-echelon inventory systems with compound Poisson demand
    • Axsater S. Exact analysis of continuous review (R, Q) policies in two-echelon inventory systems with compound Poisson demand. Operations Research 48 (2000) 686-696
    • (2000) Operations Research , vol.48 , pp. 686-696
    • Axsater, S.1
  • 6
    • 0036969802 scopus 로고    scopus 로고
    • Note: Optimality conditions for an (s, S) policy with proportional and lump-sum penalty costs
    • Cetinkaya S., and Parlar M. Note: Optimality conditions for an (s, S) policy with proportional and lump-sum penalty costs. Management Science 48 (2002) 1635-1639
    • (2002) Management Science , vol.48 , pp. 1635-1639
    • Cetinkaya, S.1    Parlar, M.2
  • 7
    • 0000086623 scopus 로고
    • Inventory control of a multiproduct system with a limited production resource
    • Evans R. Inventory control of a multiproduct system with a limited production resource. Laval Research Logistics Quarterly 14 (1967) 173-184
    • (1967) Laval Research Logistics Quarterly , vol.14 , pp. 173-184
    • Evans, R.1
  • 8
    • 0011214203 scopus 로고
    • Assembly line research: Historical roots, research life cycles and future directions
    • Gagnon R., and Ghosh S. Assembly line research: Historical roots, research life cycles and future directions. Omega 19 5 (1991) 381-399
    • (1991) Omega , vol.19 , Issue.5 , pp. 381-399
    • Gagnon, R.1    Ghosh, S.2
  • 9
    • 0033471532 scopus 로고    scopus 로고
    • A model of supply responses to just-in-time delivery requirements
    • Grout J.R., and Christy D.P. A model of supply responses to just-in-time delivery requirements. Group Decision and Negotiation 8 (1999) 139-156
    • (1999) Group Decision and Negotiation , vol.8 , pp. 139-156
    • Grout, J.R.1    Christy, D.P.2
  • 11
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in a supply chain: The bullwhip effect
    • Lee H.L., Padmanabhan V., and Whang S. Information distortion in a supply chain: The bullwhip effect. Management Science 43 (1997) 546-558
    • (1997) Management Science , vol.43 , pp. 546-558
    • Lee, H.L.1    Padmanabhan, V.2    Whang, S.3
  • 15
    • 0029288838 scopus 로고
    • A comparison of alternative kanban control mechanisms. I: Background and structural results
    • Muckstadt J.A., and Tayur S.R. A comparison of alternative kanban control mechanisms. I: Background and structural results. IIE Transactions 27 (1995) 140-150
    • (1995) IIE Transactions , vol.27 , pp. 140-150
    • Muckstadt, J.A.1    Tayur, S.R.2
  • 17
    • 0036943816 scopus 로고    scopus 로고
    • Supply chain management: A just-in-time perspective
    • Olhager J. Supply chain management: A just-in-time perspective. Production Planning and Control 13 (2002) 681-687
    • (2002) Production Planning and Control , vol.13 , pp. 681-687
    • Olhager, J.1
  • 18
  • 19
    • 0034156489 scopus 로고    scopus 로고
    • Probabilistic analysis of renewal cycles: An application to a non-Markovian inventory problem with multiple objectives
    • Parlar M. Probabilistic analysis of renewal cycles: An application to a non-Markovian inventory problem with multiple objectives. Operations Research 48 (2000) 243-255
    • (2000) Operations Research , vol.48 , pp. 243-255
    • Parlar, M.1
  • 20
    • 0031268975 scopus 로고    scopus 로고
    • Dynamic scheduling rules for a multiproduct make-to-stock queue
    • Perez A.P., and Zipkin P. Dynamic scheduling rules for a multiproduct make-to-stock queue. Operations Research 45 (1997) 919-930
    • (1997) Operations Research , vol.45 , pp. 919-930
    • Perez, A.P.1    Zipkin, P.2
  • 22
    • 0036475271 scopus 로고    scopus 로고
    • Make to order or make to stock: Model and application
    • Rajagopalan S. Make to order or make to stock: Model and application. Management Science 48 (2002) 241-256
    • (2002) Management Science , vol.48 , pp. 241-256
    • Rajagopalan, S.1
  • 27
    • 0035023618 scopus 로고    scopus 로고
    • Inventory policies for systems with stochastic and deterministic demand
    • Sobel M.J., and Zhang R.Q. Inventory policies for systems with stochastic and deterministic demand. Operations Research 49 (2001) 157-162
    • (2001) Operations Research , vol.49 , pp. 157-162
    • Sobel, M.J.1    Zhang, R.Q.2
  • 28
    • 0036758161 scopus 로고    scopus 로고
    • Performance analysis and optimization of assemble-to-order systems with random leadtimes
    • Song J., and Yao D. Performance analysis and optimization of assemble-to-order systems with random leadtimes. Operations Research 50 (2002) 889-903
    • (2002) Operations Research , vol.50 , pp. 889-903
    • Song, J.1    Yao, D.2
  • 29
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman M.L., and Zazanis M.A. Push and pull production systems: Issues and comparisons. Operations Research 40 3 (1992) 521-532
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 30
    • 84956399771 scopus 로고
    • Computing the optimal policy for capacitated inventory models
    • Tayur S.R. Computing the optimal policy for capacitated inventory models. Stochastic Models 9 (1993) 585-598
    • (1993) Stochastic Models , vol.9 , pp. 585-598
    • Tayur, S.R.1
  • 32
    • 0041365053 scopus 로고
    • The optimal operation planning of a kanban system with variable lead times
    • Yanagawa Y., Miyazaki S., and Ohta H. The optimal operation planning of a kanban system with variable lead times. Production Planning and Control 5 (1994) 21-29
    • (1994) Production Planning and Control , vol.5 , pp. 21-29
    • Yanagawa, Y.1    Miyazaki, S.2    Ohta, H.3
  • 33
    • 0000544268 scopus 로고
    • Survey, development and application of algorithms for sequencing paced assembly lines
    • Yano C.A., and Bolat A. Survey, development and application of algorithms for sequencing paced assembly lines. Journal of Manufacturing and Operations Management 2 3 (1989) 172-198
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , Issue.3 , pp. 172-198
    • Yano, C.A.1    Bolat, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.