메뉴 건너뛰기




Volumn 49, Issue 5-8, 2010, Pages 765-772

Single-machine group scheduling with linearly decreasing time-dependent setup times and job processing times

Author keywords

Decreasing linear deterioration; Group technology; Makespan; Scheduling; Single machine; Total weighted completion time

Indexed keywords

DECREASING LINEAR DETERIORATION; LINEAR DETERIORATION; MAKESPAN; SINGLE MACHINES; TOTAL WEIGHTED COMPLETION TIME;

EID: 77953613099     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-009-2444-6     Document Type: Article
Times cited : (28)

References (33)
  • 1
    • 0025429963 scopus 로고
    • Scheduling deteriorating jobs on a single processor
    • 0703.90051 10.1287/opre.38.3.495
    • S Browne U Yechiali 1990 Scheduling deteriorating jobs on a single processor Oper Res 38 495 498 0703.90051 10.1287/opre.38.3.495
    • (1990) Oper Res , vol.38 , pp. 495-498
    • Browne, S.1    Yechiali, U.2
  • 2
    • 0026258725 scopus 로고
    • V-shaped policies for scheduling deteriorating jobs
    • 0748.90033 10.1287/opre.39.6.979 1139967
    • G Mosheiov 1991 V-shaped policies for scheduling deteriorating jobs Oper Res 39 979 991 0748.90033 10.1287/opre.39.6.979 1139967
    • (1991) Oper Res , vol.39 , pp. 979-991
    • Mosheiov, G.1
  • 3
    • 0028463787 scopus 로고
    • Scheduling jobs under simple linear deterioration
    • 0810.90074 10.1016/0305-0548(94)90080-9
    • G Mosheiov 1994 Scheduling jobs under simple linear deterioration Comput Oper Res 21 653 659 0810.90074 10.1016/0305-0548(94)90080-9
    • (1994) Comput Oper Res , vol.21 , pp. 653-659
    • Mosheiov, G.1
  • 4
    • 0028533158 scopus 로고
    • Single machine scheduling with start time dependent processing times: Some solvable cases
    • 0816.90088 10.1016/0377-2217(94)90048-5
    • PS Sundararaghavan AS Kunnathur 1994 Single machine scheduling with start time dependent processing times: some solvable cases Eur J Oper Res 78 394 403 0816.90088 10.1016/0377-2217(94)90048-5
    • (1994) Eur J Oper Res , vol.78 , pp. 394-403
    • Sundararaghavan, P.S.1    Kunnathur, A.S.2
  • 5
    • 0003051113 scopus 로고    scopus 로고
    • Parallel machine scheduling with time dependent processing times
    • DOI 10.1016/0166-218X(96)00102-3
    • Z-L Chen 1996 Parallel machine scheduling with time dependent processing times Discrete Appl Math 70 81 94 0855.68032 10.1016/0166-218X(96)00102-3 1402739 (Pubitemid 126394460)
    • (1996) Discrete Applied Mathematics , vol.70 , Issue.1 , pp. 81-93
    • Chen, Z.-L.1
  • 6
    • 0031222603 scopus 로고    scopus 로고
    • Scheduling linearly deteriorating jobs on multiple machines
    • 10.1016/S0360-8352(97)00025-9
    • YC Hsieh DL Bricker 1997 Scheduling linearly deteriorating jobs on multiple machines Comput Ind Eng 32 727 734 10.1016/S0360-8352(97)00025-9
    • (1997) Comput Ind Eng , vol.32 , pp. 727-734
    • Hsieh, Y.C.1    Bricker, D.L.2
  • 7
    • 0032204974 scopus 로고    scopus 로고
    • Multi-machine scheduling with linear deterioration
    • G Mosheiov 1998 Multi-machine scheduling with linear deterioration INFOR 36 205 214
    • (1998) INFOR , vol.36 , pp. 205-214
    • Mosheiov, G.1
  • 8
    • 84867973795 scopus 로고    scopus 로고
    • Complexity analysis of job-shop scheduling with deteriorating jobs
    • DOI 10.1016/S0166-218X(00)00385-1, PII S0166218X00003851
    • G Mosheiov 2002 Complexity analysis of job-shop scheduling with deteriorating jobs Discrete Appl Math 117 195 209 1004.68031 10.1016/S0166-218X(00)00385-1 1881277 (Pubitemid 34102655)
    • (2002) Discrete Applied Mathematics , vol.117 , Issue.1-3
    • Mosheiov, G.1
  • 9
    • 0035365406 scopus 로고    scopus 로고
    • NP-hard cases in scheduling deteriorating jobs on dedicated machines
    • 1181.90120 10.1057/palgrave.jors.2601117
    • A Kononov S Gawiejnowicz 2001 NP-hard cases in scheduling deteriorating jobs on dedicated machines J Oper Res Soc 52 708 717 1181.90120 10.1057/palgrave.jors.2601117
    • (2001) J Oper Res Soc , vol.52 , pp. 708-717
    • Kononov, A.1    Gawiejnowicz, S.2
  • 10
    • 0027885153 scopus 로고
    • Complexity of scheduling tasks with time-dependent execution times
    • 0942.68508 10.1016/0020-0190(93)90175-9 1259643
    • KI-J Ho JY-T Leung W-D Wei 1993 Complexity of scheduling tasks with time-dependent execution times Inf Process Lett 48 315 320 0942.68508 10.1016/0020-0190(93)90175-9 1259643
    • (1993) Inf Process Lett , vol.48 , pp. 315-320
    • Ki-J, H.1    Jy-T, L.2    Wei, W.-D.3
  • 11
    • 0037204524 scopus 로고    scopus 로고
    • Three scheduling problems with deteriorating jobs to minimize the total completion time
    • DOI 10.1016/S0020-0190(01)00244-7, PII S0020019001002447
    • CT Ng TCE Cheng A Bachman A Janiak 2002 Three scheduling problems with deteriorating jobs to minimize the total completion time Inf Process Lett 81 327 333 10.1016/S0020-0190(01)00244-7 1879800 (Pubitemid 34078195)
    • (2002) Information Processing Letters , vol.81 , Issue.6 , pp. 327-333
    • Ng, C.T.1    Cheng, T.C.E.2    Bachman, A.3    Janiak, A.4
  • 12
    • 0036602498 scopus 로고    scopus 로고
    • Scheduling start time dependent jobs to minimize the total weighted completion time
    • DOI 10.1057/palgrave.jors.2601359
    • A Bachman TCE Cheng A Janiak CT Ng 2002 Scheduling start time dependent jobs to minimize the total weighted completion time J Oper Res Soc 53 688 693 1059.90063 10.1057/palgrave.jors.2601359 (Pubitemid 34658258)
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.6 , pp. 688-693
    • Bachman, A.1    Cheng, T.C.E.2    Janiak, A.3    Ng, C.T.4
  • 13
    • 14644427717 scopus 로고    scopus 로고
    • Scheduling jobs under decreasing linear deterioration
    • DOI 10.1016/j.ipl.2004.12.018, PII S0020019004003825
    • J-B Wang Z-Q Xia 2005 Scheduling jobs under decreasing linear deterioration Inf Process Lett 94 63 69 1182.68359 10.1016/j.ipl.2004.12.018 2126530 (Pubitemid 40308673)
    • (2005) Information Processing Letters , vol.94 , Issue.2 , pp. 63-69
    • Wang, J.-B.1    Xia, Z.-Q.2
  • 14
    • 33845309968 scopus 로고    scopus 로고
    • Flow shop scheduling problems with decreasing linear deterioration under dominant machines
    • DOI 10.1016/j.cor.2005.08.008, PII S0305054805002637
    • J-B Wang 2007 Flow shop scheduling problems with decreasing linear deterioration under dominant machines Comput Oper Res 34 2043 2058 05128193 10.1016/j.cor.2005.08.008 (Pubitemid 44879772)
    • (2007) Computers and Operations Research , vol.34 , Issue.7 , pp. 2043-2058
    • Wang, J.-B.1
  • 15
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • 1054.90542
    • B Alidaee NK Womer 1999 Scheduling with time dependent processing times: review and extensions J Oper Res Soc 50 711 720 1054.90542
    • (1999) J Oper Res Soc , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2
  • 16
    • 0141859880 scopus 로고    scopus 로고
    • A concise survey of scheduling with time-dependent processing times
    • 1030.90023 10.1016/S0377-2217(02)00909-8 2004434
    • TCE Cheng Q Ding BMT Lin 2004 A concise survey of scheduling with time-dependent processing times Eur J Oper Res 152 1 13 1030.90023 10.1016/S0377-2217(02)00909-8 2004434
    • (2004) Eur J Oper Res , vol.152 , pp. 1-13
    • Cheng, T.C.E.1    Ding, Q.2    Lin, B.M.T.3
  • 17
    • 34547803718 scopus 로고    scopus 로고
    • Minimizing the total weighted completion time on a single machine under linear deterioration
    • DOI 10.1007/s00170-006-0565-8
    • C-C Wu W-C Lee Y-R Shiau 2007 Minimizing the total weighted completion time on a single machine under linear deterioration Int J Adv Manuf Technol 33 1237 1243 10.1007/s00170-006-0565-8 (Pubitemid 47234243)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , Issue.11-12 , pp. 1237-1243
    • Wu, C.-C.1    Lee, W.-C.2    Shiau, Y.-R.3
  • 18
    • 41449117952 scopus 로고    scopus 로고
    • A two-machine flowshop makespan scheduling problem with deteriorating jobs
    • DOI 10.1016/j.cie.2007.10.010, PII S0360835207002276
    • W-C Lee C-C Wu C-C Wen Y-H Chung 2008 A two-machine flowshop makespan scheduling problem with deteriorating jobs Comput Ind Eng 54 4 737 749 10.1016/j.cie.2007.10.010 (Pubitemid 351458376)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 737-749
    • Lee, W.-C.1    Wu, C.-C.2    Wen, C.-C.3    Chung, Y.-H.4
  • 19
    • 38849195606 scopus 로고    scopus 로고
    • Scheduling deteriorating jobs on a single machine with release times
    • DOI 10.1016/j.cie.2007.08.006, PII S0360835207001970
    • W-C Lee C-C Wu Y-H Chung 2008 Scheduling deteriorating jobs on a single machine with release times Comput Ind Eng 54 3 441 452 10.1016/j.cie.2007.08.006 (Pubitemid 351199797)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.3 , pp. 441-452
    • Lee, W.-C.1    Wu, C.-C.2    Chung, Y.-H.3
  • 20
    • 35748982093 scopus 로고    scopus 로고
    • Multi-machine scheduling with deteriorating jobs and scheduled maintenance
    • DOI 10.1016/j.apm.2006.12.008, PII S0307904X06003222
    • W-C Lee C-C Wu 2008 Multi-machine scheduling with deteriorating jobs and scheduled maintenance Appl Math Model 32 3 362 373 05240766 10.1016/j.apm.2006. 12.008 2409375 (Pubitemid 350048540)
    • (2008) Applied Mathematical Modelling , vol.32 , Issue.3 , pp. 362-373
    • Lee, W.-C.1    Wu, C.-C.2
  • 21
    • 59449094314 scopus 로고    scopus 로고
    • A note on single-machine makespan problem with general deteriorating function
    • 10.1007/s00170-008-1421-9
    • W-C Lee C-C Wu H-C Liu 2008 A note on single-machine makespan problem with general deteriorating function Int J Adv Manuf Technol 40 1053 1056 10.1007/s00170-008-1421-9
    • (2008) Int J Adv Manuf Technol , vol.40 , pp. 1053-1056
    • Lee, W.-C.1    Wu, C.-C.2    Liu, H.-C.3
  • 22
    • 74249120156 scopus 로고    scopus 로고
    • Single-machine scheduling with precedence constraints and decreasing start-time dependent processing times
    • 10.1007/s00170-009-2089-5
    • W-J Gao X Huang J-B Wang 2009 Single-machine scheduling with precedence constraints and decreasing start-time dependent processing times Int J Adv Manuf Technol 10.1007/s00170-009-2089-5
    • (2009) Int J Adv Manuf Technol
    • Gao, W.-J.1    Huang, X.2    Wang, J.-B.3
  • 23
    • 74249116890 scopus 로고    scopus 로고
    • Single-machine scheduling with simple linear deterioration to minimize earliness penalties
    • 10.1007/s00170-009-2086-8
    • D Wang J-B Wang 2009 Single-machine scheduling with simple linear deterioration to minimize earliness penalties Int J Adv Manuf Technol 10.1007/s00170-009-2086-8
    • (2009) Int J Adv Manuf Technol
    • Wang, D.1    Wang, J.-B.2
  • 24
    • 78049353366 scopus 로고    scopus 로고
    • A generalization for single-machine scheduling with deteriorating jobs to minimize earliness penalties
    • 10.1007/s00170-009-2242-1
    • X Huang J-B Wang X-R Wang 2009 A generalization for single-machine scheduling with deteriorating jobs to minimize earliness penalties Int J Adv Manuf Technol 10.1007/s00170-009-2242-1
    • (2009) Int J Adv Manuf Technol
    • Huang, X.1    Wang, J.-B.2    Wang, X.-R.3
  • 25
    • 34748855553 scopus 로고    scopus 로고
    • Single-machine group scheduling problems with deterioration consideration
    • DOI 10.1016/j.cor.2006.09.008, PII S0305054806002206, Algorithms and Computational Methods in Feasibility and Infeasibility
    • C-C Wu Y-R Shiau W-C Lee 2008 Single-machine group scheduling problems with deterioration consideration Comput Oper Res 35 1652 1659 05209121 10.1016/j.cor.2006.09.008 (Pubitemid 47488636)
    • (2008) Computers and Operations Research , vol.35 , Issue.5 , pp. 1652-1659
    • Wu, C.-C.1    Shiau, Y.-R.2    Lee, W.-C.3
  • 26
    • 49049105854 scopus 로고    scopus 로고
    • Single-machine group scheduling problems with deteriorating setup times and job processing times
    • 10.1016/j.ijpe.2008.05.004
    • C-C Wu W-C Lee 2008 Single-machine group scheduling problems with deteriorating setup times and job processing times Int J Prod Econ 115 1 128 133 10.1016/j.ijpe.2008.05.004
    • (2008) Int J Prod Econ , vol.115 , Issue.1 , pp. 128-133
    • Wu, C.-C.1    Lee, W.-C.2
  • 27
    • 56749181441 scopus 로고    scopus 로고
    • Single-machine group scheduling problems with deteriorating jobs
    • 10.1007/s00170-007-1255-x
    • J-B Wang L Lin F Shan 2008 Single-machine group scheduling problems with deteriorating jobs Int J Adv Manuf Technol 39 808 812 10.1007/s00170-007-1255-x
    • (2008) Int J Adv Manuf Technol , vol.39 , pp. 808-812
    • Wang, J.-B.1    Lin, L.2    Shan, F.3
  • 28
    • 67649910495 scopus 로고    scopus 로고
    • Single machine group scheduling with general linear deterioration to minimize the makespan
    • 10.1007/s00170-008-1667-2
    • J-B Wang W-J Gao L-Y Wang D Wang 2009 Single machine group scheduling with general linear deterioration to minimize the makespan Int J Adv Manuf Technol 43 146 150 10.1007/s00170-008-1667-2
    • (2009) Int J Adv Manuf Technol , vol.43 , pp. 146-150
    • Wang, J.-B.1    Gao, W.-J.2    Wang, L.-Y.3    Wang, D.4
  • 31
    • 15244358285 scopus 로고    scopus 로고
    • Group scheduling with controllable setup and processing times: Minimizing total weighted completion time
    • DOI 10.1007/s10479-004-5030-1
    • CT Ng TCE Cheng A Janiak MY Kovalyov 2005 Group scheduling with controllable setup and processing times: minimizing total weighted completion time Ann Oper Res 133 163-147 10.1007/s10479-004-5030-1 2119319 (Pubitemid 40389746)
    • (2005) Annals of Operations Research , vol.133 , Issue.1-4 , pp. 163-174
    • Ng, C.T.1    Cheng, T.C.E.2    Janiak, A.3    Kovalyov, M.Y.4
  • 32
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • 0756.90050
    • CN Potts LN Van Wassenhove 1992 Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity J Oper Res Soc 43 395 406 0756.90050
    • (1992) J Oper Res Soc , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 33
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • 0411.90044 10.1016/S0167-5060(08)70356-X 558574
    • RL Graham EL Lawler JK Lenstra AHG Rinnooy Kan 1979 Optimization and approximation in deterministic sequencing and scheduling: a survey Ann Discrete Math 5 287 326 0411.90044 10.1016/S0167-5060(08)70356-X 558574
    • (1979) Ann Discrete Math , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnooy Kan, A.H.G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.