메뉴 건너뛰기




Volumn 39, Issue 7-8, 2008, Pages 808-812

Single-machine group scheduling problems with deteriorating jobs

Author keywords

Deteriorating jobs; Group technology; Scheduling; Single machine

Indexed keywords

DETERIORATION; MACHINERY; POLYNOMIAL APPROXIMATION; PROBABILITY DENSITY FUNCTION; SCHEDULING; TECHNOLOGY;

EID: 56749181441     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-007-1255-x     Document Type: Article
Times cited : (62)

References (19)
  • 1
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • B Alidaee NK Womer 1999 Scheduling with time dependent processing times: review and extensions J Oper Res Soc 50 711 720
    • (1999) J Oper Res Soc , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2
  • 2
    • 0141859880 scopus 로고    scopus 로고
    • A concise survey of scheduling with time-dependent processing times
    • TCE Cheng Q Ding BMT Lin 2004 A concise survey of scheduling with time-dependent processing times Eur J Oper Res 152 1 13
    • (2004) Eur J Oper Res , vol.152 , pp. 1-13
    • Cheng, T.C.E.1    Ding, Q.2    Lin, B.M.T.3
  • 3
    • 34748898745 scopus 로고    scopus 로고
    • Single machine scheduling with deteriorating jobs under the group technology assumption
    • A-X Guo J-B Wang 2005 Single machine scheduling with deteriorating jobs under the group technology assumption Int J Pure Appli Math 18 225 231
    • (2005) Int J Pure Appli Math , vol.18 , pp. 225-231
    • Guo, A.-X.1    Wang, J.-B.2
  • 4
    • 33646104433 scopus 로고    scopus 로고
    • Scheduling in a contaminated area: A model and polynomial algorithms
    • A Janiak MY Kovalyov 2006 Scheduling in a contaminated area: a model and polynomial algorithms Eur J Oper Res 173 125 132
    • (2006) Eur J Oper Res , vol.173 , pp. 125-132
    • Janiak, A.1    Kovalyov, M.Y.2
  • 5
    • 33748318134 scopus 로고    scopus 로고
    • Minimizing total completion time in a two-machine flow shop with deteriorating jobs
    • J-B Wang CTD Ng TCE Cheng L-L Liu 2006 Minimizing total completion time in a two-machine flow shop with deteriorating jobs Appl Math Comput 180 185 193
    • (2006) Appl Math Comput , vol.180 , pp. 185-193
    • Wang, J.-B.1    Ng, C.T.D.2    Cheng, T.C.E.3    Liu, L.-L.4
  • 6
    • 14644427717 scopus 로고    scopus 로고
    • Scheduling jobs under decreasing linear deterioration
    • J-B Wang Z-Q Xia 2005 Scheduling jobs under decreasing linear deterioration Inf Process Lett 94 63 69
    • (2005) Inf Process Lett , vol.94 , pp. 63-69
    • Wang, J.-B.1    Xia, Z.-Q.2
  • 7
    • 27844604203 scopus 로고    scopus 로고
    • Flow shop scheduling with deteriorating jobs under dominating machines
    • J-B Wang Z-Q Xia 2006 Flow shop scheduling with deteriorating jobs under dominating machines Omega 34 327 336
    • (2006) Omega , vol.34 , pp. 327-336
    • Wang, J.-B.1    Xia, Z.-Q.2
  • 8
    • 31444438076 scopus 로고    scopus 로고
    • Flow shop scheduling problems with deteriorating jobs under dominating machines
    • J-B Wang Z-Q Xia 2006 Flow shop scheduling problems with deteriorating jobs under dominating machines J Oper Res Soc 57 220 226
    • (2006) J Oper Res Soc , vol.57 , pp. 220-226
    • Wang, J.-B.1    Xia, Z.-Q.2
  • 9
    • 49049095538 scopus 로고    scopus 로고
    • Single machine scheduling problem with linear deterioration under group technology
    • F Xu A-X Guo J-B Wang F Shan 2006 Single machine scheduling problem with linear deterioration under group technology Int J Pure Appli Math 28 401 406
    • (2006) Int J Pure Appli Math , vol.28 , pp. 401-406
    • Xu, F.1    Guo, A.-X.2    Wang, J.-B.3    Shan, F.4
  • 10
    • 23344439483 scopus 로고    scopus 로고
    • Pareto and scalar bicriterion optimization in scheduling deteriorating jobs
    • S Gawiejnowicz W Kurc L Pankowska 2006 Pareto and scalar bicriterion optimization in scheduling deteriorating jobs Comput Oper Res 33 746 767
    • (2006) Comput Oper Res , vol.33 , pp. 746-767
    • Gawiejnowicz, S.1    Kurc, W.2    Pankowska, L.3
  • 11
    • 33846302028 scopus 로고    scopus 로고
    • Scheduling deteriorating jobs subject to job or machine availability constraints
    • S Gawiejnowicz 2007 Scheduling deteriorating jobs subject to job or machine availability constraints Eur J Oper Res 180 472 478
    • (2007) Eur J Oper Res , vol.180 , pp. 472-478
    • Gawiejnowicz, S.1
  • 12
    • 33845309968 scopus 로고    scopus 로고
    • Flow shop scheduling problems with decreasing linear deterioration under dominant machines
    • J-B Wang 2007 Flow shop scheduling problems with decreasing linear deterioration under dominant machines Comput Oper Res 34 2043 2058
    • (2007) Comput Oper Res , vol.34 , pp. 2043-2058
    • Wang, J.-B.1
  • 14
    • 34748855553 scopus 로고    scopus 로고
    • Single-machine group scheduling problems with deterioration consideration
    • C-C Wu Y-R Shiau W-C Lee 2007 Single-machine group scheduling problems with deterioration consideration Comput Oper Res 35 1652 1659
    • (2007) Comput Oper Res , vol.35 , pp. 1652-1659
    • Wu, C.-C.1    Shiau, Y.-R.2    Lee, W.-C.3
  • 15
    • 34547803718 scopus 로고    scopus 로고
    • Minimizing the total weighted completion time on a single machine under linear deterioration
    • C-C Wu W-C Lee Y-R Shiau 2007 Minimizing the total weighted completion time on a single machine under linear deterioration Int J Adv Manuf Technol 33 1237 1243
    • (2007) Int J Adv Manuf Technol , vol.33 , pp. 1237-1243
    • Wu, C.-C.1    Lee, W.-C.2    Shiau, Y.-R.3
  • 16
    • 34548602397 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
    • Y-R Shiau W-C Lee C-C Wu C-M Chang 2007 Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration Int J Adv Manuf Technol 34 774 782
    • (2007) Int J Adv Manuf Technol , vol.34 , pp. 774-782
    • Shiau, Y.-R.1    Lee, W.-C.2    Wu, C.-C.3    Chang, C.-M.4
  • 18
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • CN Potts LN Van Wassenhove 1992 Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity J Oper Res Soc 43 395 406
    • (1992) J Oper Res Soc , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 19


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.