-
2
-
-
34247593467
-
Monitoring high-yields processes with defects count in nonconforming items by artificial neural network
-
DOI 10.1016/j.amc.2006.09.114, PII S0096300306013488
-
B Abbasi STA Niaki 2007 Monitoring high-yields processes with defects count in nonconforming items by Artificial Neural Network Appl Math Comput 188 262 270 1137.90770 10.1016/j.amc.2006.09.114 2332142 (Pubitemid 46686720)
-
(2007)
Applied Mathematics and Computation
, vol.188
, Issue.1
, pp. 262-270
-
-
Abbasi, B.1
Akhavan Niaki, S.T.2
-
3
-
-
33747026665
-
Optimizing a production system with rework and equal sized batch shipments
-
DOI 10.1016/j.cor.2005.03.011, PII S0305054805001061
-
U Buscher G Lindner 2007 Optimizing a production system with rework and equal sized batch shipments Comput Oper Res 34 515 535 1113.90027 10.1016/j.cor.2005.03.011 2239509 (Pubitemid 44205371)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.2
, pp. 515-535
-
-
Buscher, U.1
Lindner, G.2
-
4
-
-
0032991947
-
Integrated production-inventory models with imperfect production processes and a limited capacity for raw materials
-
DOI 10.1016/S0895-7177(99)00021-7, PII S0895717799000217
-
CS Lin 1999 Integrated production-inventory models with imperfect production processes and a limited capacity for raw materials Math Comput Model 29 81 89 1028.90500 10.1016/S0895-7177(99)00021-7 (Pubitemid 29111845)
-
(1999)
Mathematical and Computer Modelling
, vol.29
, Issue.2
, pp. 81-89
-
-
Lin, C.-S.1
-
5
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
DOI 10.1016/j.ejor.2006.05.005, PII S0377221706003353
-
SW Chiu SL Wang YSP Chiu 2007 Determining the optimal run time for EPQ model with scrap, rework and stochastic breakdowns Eur J Oper Res 180 664 676 1123.90002 10.1016/j.ejor.2006.05.005 (Pubitemid 46199072)
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.2
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.-L.2
Chiu, Y.-S.P.3
-
7
-
-
25144482720
-
Threshold accepting: A general purpose algorithm appearing superior to simulated annealing
-
0707.65039 10.1016/0021-9991(90)90201-B 1070475
-
G Dueck T Scheuer 1990 Threshold accepting: a general purpose algorithm appearing superior to simulated annealing J Comput Phys 90 161 175 0707.65039 10.1016/0021-9991(90)90201-B 1070475
-
(1990)
J Comput Phys
, vol.90
, pp. 161-175
-
-
Dueck, G.1
Scheuer, T.2
-
9
-
-
0034974417
-
A new heuristic optimization algorithm: Harmony search
-
10.1177/003754970107600201
-
ZW Geem JH Kim GV Loganathan 2001 A new heuristic optimization algorithm: harmony search Simulation 76 60 68 10.1177/003754970107600201
-
(2001)
Simulation
, vol.76
, pp. 60-68
-
-
Geem, Z.W.1
Kim, J.H.2
Loganathan, G.V.3
-
13
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
DOI 10.1080/095372801750397707
-
PA Hayek MK Salameh 2001 Production lot sizing with the reworking of imperfect quality items produced Prod Plan Control 12 584 590 10.1080/095372801750397707 (Pubitemid 35395061)
-
(2001)
Production Planning and Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
14
-
-
33749665095
-
An EPQ model with setup cost and process quality as functions of capital expenditure
-
DOI 10.1016/j.apm.2006.03.034, PII S0307904X06000643
-
KL Hou 2007 An EPQ model with set up cost and process quality as functions of capital expenditure Appl Math Model 31 10 17 1152.90312 10.1016/j.apm.2006.03.034 (Pubitemid 44550735)
-
(2007)
Applied Mathematical Modelling
, vol.31
, Issue.1
, pp. 10-17
-
-
Hou, K.-L.1
-
15
-
-
0030085981
-
Construction of exact D-optimal designs by tabu search
-
DOI 10.1016/0167-9473(95)00014-3
-
SJ Joo JY Bong 1996 Construction of exact d-optimal designs by Tabu search Comput Stat Data Anal 21 181 191 0900.62403 10.1016/0167-9473(95)00014-3 (Pubitemid 126403499)
-
(1996)
Computational Statistics and Data Analysis
, vol.21
, Issue.2
, pp. 181-191
-
-
Jung, J.S.1
Yum, B.J.2
-
16
-
-
0032761507
-
An optimal production run length in deteriorating production processes
-
10.1016/S0925-5273(98)00057-7
-
CH Kim Y Hong 1999 An optimal production run length in deteriorating production processes Int J Prod Econ 58 183 189 10.1016/S0925-5273(98)00057-7
-
(1999)
Int J Prod Econ
, vol.58
, pp. 183-189
-
-
Kim, C.H.1
Hong, Y.2
-
17
-
-
0036715683
-
Combining convergence and diversity in evolutionary multi-objective optimization
-
10.1162/106365602760234108
-
M Laumanns L Thiele K Deb E Zitzler 2002 Combining convergence and diversity in evolutionary multi-objective optimization Evol Comput 10 263 282 10.1162/106365602760234108
-
(2002)
Evol Comput
, vol.10
, pp. 263-282
-
-
Laumanns, M.1
Thiele, L.2
Deb, K.3
Zitzler, E.4
-
18
-
-
0002953454
-
Economic production quantity for fuzzy demand quantity and fuzzy production quantity
-
0951.90019 10.1016/S0377-2217(97)00200-2
-
HM Lee JS Yao 1998 Economic production quantity for fuzzy demand quantity and fuzzy production quantity Eur J Oper Res 109 203 211 0951.90019 10.1016/S0377-2217(97)00200-2
-
(1998)
Eur J Oper Res
, vol.109
, pp. 203-211
-
-
Lee, H.M.1
Yao, J.S.2
-
19
-
-
1842427544
-
A new structural optimization method based on the harmony search algorithm
-
10.1016/j.compstruc.2004.01.002
-
KS Lee ZW Geem 2004 A new structural optimization method based on the harmony search algorithm Comput Struct 82 781 798 10.1016/j.compstruc.2004.01. 002
-
(2004)
Comput Struct
, vol.82
, pp. 781-798
-
-
Lee, K.S.1
Geem, Z.W.2
-
20
-
-
56249098653
-
Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
-
1161.90005 10.1016/j.ejor.2008.01.004
-
GL Liao YH Chen SH Sheu 2009 Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance Eur J Oper Res 195 348 357 1161.90005 10.1016/j.ejor.2008.01.004
-
(2009)
Eur J Oper Res
, vol.195
, pp. 348-357
-
-
Liao, G.L.1
Chen, Y.H.2
Sheu, S.H.3
-
22
-
-
33845784358
-
A genetic algorithm for resource investment problem with discounted cash flows
-
DOI 10.1016/j.amc.2006.05.118, PII S0096300306006412
-
AA Najafi STA Niaki 2006 A genetic algorithm for resource investment problem with discounted cash flows Appl Math Comput 183 1057 1070 1112.90035 10.1016/j.amc.2006.05.118 2290860 (Pubitemid 46014655)
-
(2006)
Applied Mathematics and Computation
, vol.183
, Issue.2
, pp. 1057-1070
-
-
Najafi, A.A.1
Niaki, S.T.A.2
-
24
-
-
33644901817
-
Multi-response simulation optimization using genetic algorithm within desirability function framework
-
1088.65060 10.1016/j.amc.2005.07.023 2216348
-
SHR Pasandideh STA Niaki 2006 Multi-response simulation optimization using genetic algorithm within desirability function framework Appl Math Comput 175 366 382 1088.65060 10.1016/j.amc.2005.07.023 2216348
-
(2006)
Appl Math Comput
, vol.175
, pp. 366-382
-
-
Pasandideh, S.H.R.1
Niaki, S.T.A.2
-
25
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
10.1080/07408178608975329
-
MJ Rosenblatt HL Lee 1986 Economic production cycles with imperfect production processes IIE Transactions 18 48 55 10.1080/07408178608975329
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
26
-
-
0033874992
-
Economic production quantity model for items with imperfect quality
-
DOI 10.1016/S0925-5273(99)00044-4
-
MK Salameh MY Jaber 2000 Economic production order quantity model for items with imperfect quality Int J Prod Econ 64 59 64 10.1016/S0925-5273(99) 00044-4 (Pubitemid 30557643)
-
(2000)
International Journal of Production Economics
, vol.64
, Issue.1
, pp. 59-64
-
-
Salameh, M.K.1
Jaber, M.Y.2
-
27
-
-
42149171370
-
Optimizing multi-product multi-constraint inventory control systems with stochastic replenishment
-
10.3923/jas.2008.1228.1234
-
AA Taleizadeh MB Aryanezhad STA Niaki 2008 Optimizing multi-product multi-constraint inventory control systems with stochastic replenishment J Appl Sci 8 1228 1234 10.3923/jas.2008.1228.1234
-
(2008)
J Appl Sci
, vol.8
, pp. 1228-1234
-
-
Taleizadeh, A.A.1
Aryanezhad, M.B.2
Niaki, S.T.A.3
-
28
-
-
54049142673
-
The multi-product multi-constraint newsboy problem with incremental discount and batch order
-
10.3923/ajaps.2008.110.122
-
AA Taleizadeh STA Niaki V Hosseini 2008 The multi-product multi-constraint newsboy problem with incremental discount and batch order As J Appl Sci 1 110 122 10.3923/ajaps.2008.110.122
-
(2008)
As J Appl Sci
, vol.1
, pp. 110-122
-
-
Taleizadeh, A.A.1
Niaki, S.T.A.2
Hosseini, V.3
-
29
-
-
60249089791
-
Multi-product multi-constraint inventory control systems with stochastic replenishment and discount under fuzzy purchasing price and holding costs
-
10.3844/ajas.2009.1.12
-
AA Taleizadeh STA Niaki MB Aryanezhad 2009 Multi-product multi-constraint inventory control systems with stochastic replenishment and discount under fuzzy purchasing price and holding costs Am J Appl Sci 6 1 12 10.3844/ajas.2009.1.12
-
(2009)
Am J Appl Sci
, vol.6
, pp. 1-12
-
-
Taleizadeh, A.A.1
Niaki, S.T.A.2
Aryanezhad, M.B.3
-
30
-
-
59149085452
-
A hybrid method of pareto, topsis and genetic algorithm to optimize multi-product multi-constraint inventory systems with random fuzzy replenishment
-
1165.90339 10.1016/j.mcm.2008.10.013 2495019
-
AA Taleizadeh STA Niaki MB Aryanezhad 2009 A hybrid method of pareto, topsis and genetic algorithm to optimize multi-product multi-constraint inventory systems with random fuzzy replenishment J Math Comput Model 49 1044 1057 1165.90339 10.1016/j.mcm.2008.10.013 2495019
-
(2009)
J Math Comput Model
, vol.49
, pp. 1044-1057
-
-
Taleizadeh, A.A.1
Niaki, S.T.A.2
Aryanezhad, M.B.3
-
31
-
-
70449521841
-
Optimizing multi-product multi-constraint bi-objective newsboy problem with discount by a hybrid method of goal programming and genetic algorithm
-
10.1080/03052150802582175
-
AA Taleizadeh STA Niaki V Hosseini 2009 Optimizing multi-product multi-constraint bi-objective newsboy problem with discount by a hybrid method of goal programming and genetic algorithm J Eng Optim 41 437 457 10.1080/03052150802582175
-
(2009)
J Eng Optim
, vol.41
, pp. 437-457
-
-
Taleizadeh, A.A.1
Niaki, S.T.A.2
Hosseini, V.3
|