메뉴 건너뛰기




Volumn 7, Issue 4, 2010, Pages 568-574

Evaluating the maintenance performance of the semiconductor factories based on the analytical hierarchy process and grey relational analysis

Author keywords

Analytical hierarchy process; Grey relational analysis; Maintenance; Performance evaluation; Semiconductor factories

Indexed keywords


EID: 77953508176     PISSN: 15469239     EISSN: 15543641     Source Type: Journal    
DOI: 10.3844/ajassp.2010.568.574     Document Type: Article
Times cited : (9)

References (20)
  • 1
    • 70350268064 scopus 로고    scopus 로고
    • An efficient mixed-integer linear formulation for long-term overhead lines maintenance scheduling in power distribution systems
    • DOI:10.1109/TPWRD.2009.2028785
    • Abiri-Jahromi, A., M. Fotuhi-Firuzabad and E. Abbasi, 2009. An efficient mixed-integer linear formulation for long-term overhead lines maintenance scheduling in power distribution systems. IEEE Trans. Power Deliv., 24: 2043-2053. DOI:10.1109/TPWRD.2009.2028785
    • (2009) IEEE Trans. Power Deliv , vol.24 , pp. 2043-2053
    • Abiri-Jahromi, A.1    Fotuhi-Firuzabad, M.2    Abbasi, E.3
  • 2
    • 70149084778 scopus 로고    scopus 로고
    • Dynamic scheduling of maintenance tasks in the petroleum industry: A reinforcement approach
    • DOI: 10.1016/j.engappai.2009.01.014
    • Aissani, N., B. Beldjilali and D. Trentesaux, 2009. Dynamic scheduling of maintenance tasks in the petroleum industry: A reinforcement approach. Eng. Applied Artif. Intell., 22: 1089-1103. DOI: 10.1016/j.engappai.2009.01.014
    • (2009) Eng. Applied Artif. Intell , vol.22 , pp. 1089-1103
    • Aissani, N.1    Beldjilali, B.2    Trentesaux, D.3
  • 3
    • 0141963917 scopus 로고    scopus 로고
    • New method to minimize the preventive maintenance cost of series-parallel systems
    • DOI: 10.1016/S0951-8320(03)00166-2
    • Bris, R., E. Chatelet and F. Yalaoui, 2003. New method to minimize the preventive maintenance cost of series-parallel systems. Reliab. Eng. Syst. Safe., 82: 247-255. DOI: 10.1016/S0951-8320(03)00166-2
    • (2003) Reliab. Eng. Syst. Safe , vol.82 , pp. 247-255
    • Bris, R.1    Chatelet, E.2    Yalaoui, F.3
  • 4
    • 70349238590 scopus 로고    scopus 로고
    • System maintenance scheduling with prognostics information using genetic algorithm
    • DOI: 10.1109/TR.2009.2026818
    • Camci, F., 2009. System maintenance scheduling with prognostics information using genetic algorithm. IEEE Trans. Reliab., 58: 539-552. DOI: 10.1109/TR.2009.2026818
    • (2009) IEEE Trans. Reliab , vol.58 , pp. 539-552
    • Camci, F.1
  • 5
    • 18144418619 scopus 로고    scopus 로고
    • Combining grey relation and TOPSIS concepts for selecting an expatriate host country
    • DOI: 10.1016/j.mcm.2005.01.006
    • Chen, M.F. and G.H. Tzeng, 2004. Combining grey relation and TOPSIS concepts for selecting an expatriate host country. Math. Comput. Model., 40: 1473-1490. DOI: 10.1016/j.mcm.2005.01.006
    • (2004) Math. Comput. Model , vol.40 , pp. 1473-1490
    • Chen, M.F.1    Tzeng, G.H.2
  • 6
    • 0242708899 scopus 로고    scopus 로고
    • Cost-variability-sensitive preventive maintenance considering management risk
    • DOI: 10.1080/07408170390237162
    • Chen, Y. and J. Jin, 2003. Cost-variability-sensitive preventive maintenance considering management risk. IIE Trans., 35: 1091-1101. DOI: 10.1080/07408170390237162
    • (2003) IIE Trans , vol.35 , pp. 1091-1101
    • Chen, Y.1    Jin, J.2
  • 7
    • 33750552335 scopus 로고    scopus 로고
    • 2006. Improving preventive maintenance scheduling in semiconductor fabrication facilities
    • DOI: 10.1080/09537280600901525
    • Crespo Marquez, A., J.N.D. Gupta and J.P. Ignizio, 2006. Improving preventive maintenance scheduling in semiconductor fabrication facilities. Prod. Plan. Control, 17: 742-754. DOI: 10.1080/09537280600901525
    • Prod. Plan. Control , vol.17 , pp. 742-754
    • Crespo Marquez, A.1    Gupta, J.N.D.2    Ignizio, J.P.3
  • 8
    • 37349003102 scopus 로고    scopus 로고
    • Cost analysis of a system with preventive maintenance by using the Kolmogorov's forward equations method
    • El-Said, K.M., 2008. Cost analysis of a system with preventive maintenance by using the Kolmogorov's forward equations method. Am. J. Applied Sci., 5: 405-410. http://www.scipub.org/fulltext/ajas/ajas54405-410.pdf
    • (2008) Am. J. Applied Sci , vol.5 , pp. 405-410
    • El-Said, K.M.1
  • 9
    • 33747480569 scopus 로고    scopus 로고
    • Reducing the cost of Preventive Maintenance (PM) through adopting a proactive reliability-focused culture
    • DOI: 10.1016/j.apenergy.2006.01.002
    • Eti, M.C., S.O.T. Ogaji and S.D. Probert, 2006. Reducing the cost of Preventive Maintenance (PM) through adopting a proactive reliability-focused culture. Applied Energy, 83: 1235-1248. DOI: 10.1016/j.apenergy.2006.01.002
    • (2006) Applied Energy , vol.83 , pp. 1235-1248
    • Eti, M.C.1    Ogaji, S.O.T.2    Probert, S.D.3
  • 10
    • 77953496612 scopus 로고    scopus 로고
    • Maintenance performance in the South African industry. South Afr
    • Jooste, J.L., 2007. Maintenance performance in the South African industry. South Afr. J. Ind. Eng., 18: 117-133. http://proquest.umi.com.nthulib-oc.nthu.edu.tw/pqdweb?did=1368809181&sid=1&Fmt=3&clientId=39468&RQT=309&VName=PQD
    • (2007) J. Ind. Eng , vol.18 , pp. 117-133
    • Jooste, J.L.1
  • 11
    • 10844259870 scopus 로고    scopus 로고
    • A cost/benefit model for investments in inventory and preventive maintenance in an imperfect production system
    • DOI: 10.1016/j.cie.2004.07.008
    • Lee, H.H., 2005. A cost/benefit model for investments in inventory and preventive maintenance in an imperfect production system. Comput. Ind. Eng., 48: 55-68. DOI: 10.1016/j.cie.2004.07.008
    • (2005) Comput. Ind. Eng , vol.48 , pp. 55-68
    • Lee, H.H.1
  • 12
    • 60349112188 scopus 로고    scopus 로고
    • Scheduling a maintenance activity on parallel identical machines
    • DOI: 10.1002/nav.20324
    • Levin, A., G. Mosheiov and A. Sarig, 2008. Scheduling a maintenance activity on parallel identical machines. Nav. Res. Logist., 56: 33-41. DOI: 10.1002/nav.20324
    • (2008) Nav. Res. Logist , vol.56 , pp. 33-41
    • Levin, A.1    Mosheiov, G.2    Sarig, A.3
  • 13
    • 66149094973 scopus 로고    scopus 로고
    • 2009. Proactive, dynamic and multi-criteria scheduling of maintenance activities
    • DOI: 10.1080/00207540802311106
    • Marmier, F., C. Varnier and N. Zerhouni, 2009. Proactive, dynamic and multi-criteria scheduling of maintenance activities. Int. J. Prod. Res., 47: 2185-2201. DOI: 10.1080/00207540802311106
    • Int. J. Prod. Res , vol.47 , pp. 2185-2201
    • Marmier, F.1    Varnier, C.2    Zerhouni, N.3
  • 14
    • 0032632419 scopus 로고    scopus 로고
    • The use of maintenance indicators to evaluate the effects of maintenance programs on NPP performance and safety
    • Martorell, S., A. Sanchez, A. Munoz, J.L. Pitarch, V. Serradell and J. Roldan, 1999. The use of maintenance indicators to evaluate the effects of maintenance programs on NPP performance and safety. Reliab. Eng. Syst. Safe., 65: 85-94. http://sdos.ejournal.ascc.net.nthulib-oc.nthu.edu.tw/pdflinks/10011222493914346.pdf
    • (1999) Reliab. Eng. Syst. Safe , vol.65 , pp. 85-94
    • Martorell, S.1    Sanchez, A.2    Munoz, A.3    Pitarch, J.L.4    Serradell, V.5    Roldan, J.6
  • 15
    • 0036874133 scopus 로고    scopus 로고
    • Preventive maintenance policy with effect dependent cost
    • Park, D.H. and G.M. Jung, 2002. Preventive maintenance policy with effect dependent cost. Asia Pac. J. Operat. Res., 19: 223-232. http://www.encyclopedia.com/doc/1P3-295673851.html
    • (2002) Asia Pac. J. Operat. Res , vol.19 , pp. 223-232
    • Park, D.H.1    Jung, G.M.2
  • 16
    • 0031271372 scopus 로고    scopus 로고
    • Comparative evaluation of maintenance performance using subsurvival functions
    • DOI: 10.1016/S0951-8320(97)00036-7
    • Paulsen, J., R. Cooke and R. Nyman, 1997. Comparative evaluation of maintenance performance using subsurvival functions. Reliab. Eng. Syst. Safe., 58: 157-163. DOI: 10.1016/S0951-8320(97)00036-7
    • (1997) Reliab. Eng. Syst. Safe , vol.58 , pp. 157-163
    • Paulsen, J.1    Cooke, R.2    Nyman, R.3
  • 17
    • 0025700933 scopus 로고
    • How to make a decision: The analytic hierarchy process
    • DOI: 10.1016/0377-2217(90)90057-I
    • Saaty, T.L., 1990. How to make a decision: The analytic hierarchy process. Eur. J. Oper. Res., 48: 9-26. DOI: 10.1016/0377-2217(90)90057-I
    • (1990) Eur. J. Oper. Res , vol.48 , pp. 9-26
    • Saaty, T.L.1
  • 18
    • 0036468407 scopus 로고    scopus 로고
    • Using in-line equipment condition and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs
    • DOI: 10.1023/A:1011900215443
    • Sloan, T.W. and J.G. Shanthikumar, 2002. Using in-line equipment condition and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs. IIE Trans., 34: 191-209. DOI: 10.1023/A:1011900215443
    • (2002) IIE Trans , vol.34 , pp. 191-209
    • Sloan, T.W.1    Shanthikumar, J.G.2
  • 20
    • 4344583594 scopus 로고    scopus 로고
    • Optimal preventive maintenance scheduling in semiconductor manufacturing
    • DOI: 10.1109/tsm.2004.831948
    • Yao, X.D., E. Fernandez-Gaucherand, M.C. Fu and S.I. Marcus, 2004. Optimal preventive maintenance scheduling in semiconductor manufacturing. IEEE Trans. Semicond. Manuf., 17: 345-356. DOI: 10.1109/tsm.2004.831948
    • (2004) IEEE Trans. Semicond. Manuf , vol.17 , pp. 345-356
    • Yao, X.D.1    Fernandez-Gaucherand, E.2    Fu, M.C.3    Marcus, S.I.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.