-
1
-
-
0035795519
-
An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants
-
Castro P, Barbosa-Pavoa A, Matos H (2001) An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants. Ind Eng Chem Res 40:2059-2068.
-
(2001)
Ind Eng Chem Res
, vol.40
, pp. 2059-2068
-
-
Castro, P.1
Barbosa-Pavoa, A.2
Matos, H.3
-
2
-
-
0031140322
-
A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines
-
Cerda J, Henning GP, Grossmann IE (1997) A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines. Ind Eng Chem Res 36:1695-1707.
-
(1997)
Ind Eng Chem Res
, vol.36
, pp. 1695-1707
-
-
Cerda, J.1
Henning, G.P.2
Grossmann, I.E.3
-
3
-
-
9644275500
-
A comparison of optimal control and stochastic programming from a formulation and computation perspective
-
Cheng L, Subrahmanian E, Westerberg AW (2004) A comparison of optimal control and stochastic programming from a formulation and computation perspective. Comput Chem Eng 29:149-164.
-
(2004)
Comput Chem Eng
, vol.29
, pp. 149-164
-
-
Cheng, L.1
Subrahmanian, E.2
Westerberg, A.W.3
-
4
-
-
77953361468
-
Implications of crosstransfer in batch plants with complex recipes: S-graph vs MILP methods
-
Prague: Orgit Ltd publicatios, ISBN: 978-80-02-02047-9 (CD-ROM)
-
Friedler F, Majozi T, Holczinger T (2008) Implications of crosstransfer in batch plants with complex recipes: S-graph vs MILP methods. In: Proceedings of 11th conference on process integration, modelling and optimisation for energy saving and pollution reduction-PRES 2008 P5.129, Prague: Orgit Ltd publicatios, ISBN: 978-80-02-02047-9 (CD-ROM).
-
(2008)
Proceedings of 11th Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction-PRES 2008 P5.129
-
-
Friedler, F.1
Majozi, T.2
Holczinger, T.3
-
5
-
-
0027545176
-
General algorithm for short-term scheduling of batch operations - I. Milp formulation
-
DOI 10.1016/0098-1354(93)80015-F
-
Kondili E, Pantelides CC, Sargent R (1993) A general algorithm for short-term scheduling of batch operations. Part 1. MILP formulation. Comput Chem Eng 17:211-227. (Pubitemid 23633373)
-
(1993)
Computers and Chemical Engineering
, vol.17
, Issue.2
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
6
-
-
38849148294
-
Process scheduling under uncertainty: review and challenges
-
Li Z, Ierapetritou M (2008) Process scheduling under uncertainty: review and challenges. Comput Chem Eng 32:715-727.
-
(2008)
Comput Chem Eng
, vol.32
, pp. 715-727
-
-
Li, Z.1
Ierapetritou, M.2
-
7
-
-
2442583184
-
Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
-
Lin X, Floudas CA (2004) Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Comput Chem Eng 28:2109-2129.
-
(2004)
Comput Chem Eng
, vol.28
, pp. 2109-2129
-
-
Lin, X.1
Floudas, C.A.2
-
8
-
-
0037036735
-
Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
-
Lin X, Floudas CA, Modi S, Juhasz NM (2002) Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant. Ind Eng Chem Res 41:3884-3906.
-
(2002)
Ind Eng Chem Res
, vol.41
, pp. 3884-3906
-
-
Lin, X.1
Floudas, C.A.2
Modi, S.3
Juhasz, N.M.4
-
9
-
-
33749823078
-
Maximization of throughput in a multipurpose batch plant under a fixed time horizon: S-graph approach
-
DOI 10.1021/ie0604472
-
Majozi T, Friedler F (2006) Maximization of throughput in a multipurpose batch plant under a fixed time horizon: S-graph approach. Ind Eng Chem Res 45:6713-6720. (Pubitemid 44562339)
-
(2006)
Industrial and Engineering Chemistry Research
, vol.45
, Issue.20
, pp. 6713-6720
-
-
Majozi, T.1
Friedler, F.2
-
10
-
-
0035852008
-
A novel continuous-time MILP formulation for multipurpose batch plants. 1. Short-term scheduling
-
Majozi T, Zhu X (2001) A novel continuous-time milp formulation for multipurpose batch plants. Part 1. Short-term scheduling. Ind Eng Chem Res 40:5935-5949. (Pubitemid 33131026)
-
(2001)
Industrial and Engineering Chemistry Research
, vol.40
, Issue.25
, pp. 5935-5949
-
-
Majozi, T.1
Zhu, X.X.2
-
11
-
-
33748102518
-
An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources
-
Elsevier Science Ltd, Amsterdam
-
Méndez CA, Cerda J (2002) An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources. In: Computer-aided chemical engineering, vol 12. Elsevier Science Ltd, Amsterdam, pp 721-726.
-
(2002)
Computer-aided Chemical Engineering
, vol.12
, pp. 721-726
-
-
Méndez, C.A.1
Cerda, J.2
-
12
-
-
0000763707
-
Unified frameworks for optimal process planning and scheduling
-
Rippin DWT, Hale JC, Davis J (eds), Cache publications, New York
-
Pantelides C (1994) Unified frameworks for optimal process planning and scheduling. In: Rippin DWT, Hale JC, Davis J (eds) Proceedings of the second international conference on foundations of computer-aided process operations. Cache publications, New York, pp 253-274.
-
(1994)
Proceedings of the Second International Conference on Foundations of Computer-aided Process Operations
, pp. 253-274
-
-
Pantelides, C.1
-
14
-
-
0001690679
-
A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants
-
Pinto JM, Grossmann IE (1995) A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants. Ind Eng Chem Res 34:3037-3051.
-
(1995)
Ind Eng Chem Res
, vol.34
, pp. 3037-3051
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
15
-
-
1642291892
-
Scheduling intermediate storage multipurpose batch plants using the S-graph
-
Romero J, Puigjaner L, Holczinger T, Friedler F (2004) Scheduling intermediate storage multipurpose batch plants using the S-graph. AIChE J 50:403-417.
-
(2004)
AIChE J
, vol.50
, pp. 403-417
-
-
Romero, J.1
Puigjaner, L.2
Holczinger, T.3
Friedler, F.4
-
16
-
-
0036877332
-
Combinatorial framework for effective scheduling of multipurpose batch plants
-
Sanmartí E, Puigjaner L, Holczinger T, Friedler F (2002) Combinatorial framework for effective scheduling of multipurpose batch plants. AIChE J 48:2557-2570.
-
(2002)
AIChE J
, vol.48
, pp. 2557-2570
-
-
Sanmartí, E.1
Puigjaner, L.2
Holczinger, T.3
Friedler, F.4
|