메뉴 건너뛰기




Volumn 45, Issue 20, 2006, Pages 6713-6720

Maximization of throughput in a multipurpose batch plant under a fixed time horizon: S-graph approach

Author keywords

[No Author keywords available]

Indexed keywords

ECONOMIC PERFORMANCE INDEXES; MULTIPURPOSE BATCH PLANTS; NONINTERMEDIATE STORAGE (NIS);

EID: 33749823078     PISSN: 08885885     EISSN: None     Source Type: Journal    
DOI: 10.1021/ie0604472     Document Type: Article
Times cited : (19)

References (13)
  • 1
    • 0016534034 scopus 로고
    • The choice of equipment sizes for multiproduct batch plants-heuristics vs branch and bound
    • Sparrow, R. E.; Forder, G. J.; Rippin, D. W. T. The Choice of Equipment Sizes for Multiproduct Batch Plants-Heuristics vs Branch and Bound. Ind. Eng. Chem. Process. Des. Dev. 1975, 14, 197.
    • (1975) Ind. Eng. Chem. Process. Des. Dev. , vol.14 , pp. 197
    • Sparrow, R.E.1    Forder, G.J.2    Rippin, D.W.T.3
  • 2
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations. I. MILP formulation
    • Kondili, E.; Pantelides, C. C.; Sargent, R. W. H. A General Algorithm for Short-Term Scheduling of Batch Operations. I. MILP Formulation. Comput. Chem. Eng. 1993, 17, 211.
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 211
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 4
    • 0035852008 scopus 로고    scopus 로고
    • A Novel continuous time MILP formulation for multipurpose batch plants. 1. Short-term scheduling
    • Majozi, T.; Zhu, X. X. A Novel Continuous Time MILP Formulation for Multipurpose Batch Plants. 1. Short-Term Scheduling. Ind. Eng. Chem. Res. 2001, 40, 5935.
    • (2001) Ind. Eng. Chem. Res. , vol.40 , pp. 5935
    • Majozi, T.1    Zhu, X.X.2
  • 5
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • Floudas, C. A.; Lin, X. Continuous-Time Versus Discrete-Time Approaches for Scheduling of Chemical Processes: A Review. Comput. Chem. Eng. 2004, 28, 2109.
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2109
    • Floudas, C.A.1    Lin, X.2
  • 6
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J.; Balas, E.; Zawack, D. The Shifting Bottleneck Procedure for Job Shop Scheduling. Manage. Sci. 1988, 34, 391.
    • (1988) Manage. Sci. , vol.34 , pp. 391
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 7
    • 0000165767 scopus 로고
    • An algorithm for solving the job-shop problem
    • Carlier, J.; Pinson, E. An Algorithm for Solving the Job-Shop Problem. Manage. Sci. 1989, 35, 164.
    • (1989) Manage. Sci. , vol.35 , pp. 164
    • Carlier, J.1    Pinson, E.2
  • 9
    • 0026126118 scopus 로고
    • Computational study of the job-shop scheduling problem
    • Applegate, D.; Cooke, W. A. Computational Study of the Job-Shop Scheduling Problem. ORSA J. Comput. 1991, 3, 149.
    • (1991) ORSA J. Comput. , vol.3 , pp. 149
    • Applegate, D.1    Cooke, W.A.2
  • 10
    • 0002822277 scopus 로고    scopus 로고
    • Combinatorial technique for ShortOLINIT-term scheduling of multipurpose batch plants based on schedule-graph representation
    • Sanmartí, E.; Friedler, F.; Puigjaner, L. Combinatorial Technique for ShortOLINIT-Term Scheduling of Multipurpose Batch Plants Based on Schedule-Graph Representation. Comput. Chem. Eng. 1998, 22, S847.
    • (1998) Comput. Chem. Eng. , vol.22
    • Sanmartí, E.1    Friedler, F.2    Puigjaner, L.3
  • 11
    • 0036877332 scopus 로고    scopus 로고
    • Combinatorial framework for effective scheduling of multipurpose batch plants
    • Sanmartí, E.; Holczinger, T.; Puigjaner, L.; Friedler, F. Combinatorial Framework for Effective Scheduling of Multipurpose Batch Plants. AIChE J. 2002, 48, 2557.
    • (2002) AIChE J. , vol.48 , pp. 2557
    • Sanmartí, E.1    Holczinger, T.2    Puigjaner, L.3    Friedler, F.4
  • 12
    • 1642291892 scopus 로고    scopus 로고
    • Scheduling intermediate storage multipurpose batch plants using the S-graph
    • Romero, J.; Puigjaner, L.; Holczinger, T.; Friedler, F. Scheduling Intermediate Storage Multipurpose Batch Plants Using the S-Graph. AIChE J. 2004, 50, 403.
    • (2004) AIChE J. , vol.50 , pp. 403
    • Romero, J.1    Puigjaner, L.2    Holczinger, T.3    Friedler, F.4
  • 13
    • 0042971804 scopus 로고    scopus 로고
    • Scheduling of multipurpose of batch processes with multiple batches of the products
    • Holczinger, T.; Romero, J.; Puigjaner, L.; Friedler, F. Scheduling of Multipurpose of Batch Processes with Multiple Batches of the Products. Hung. J. Ind. Chem. 2002, 30, 305.
    • (2002) Hung. J. Ind. Chem. , vol.30 , pp. 305
    • Holczinger, T.1    Romero, J.2    Puigjaner, L.3    Friedler, F.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.