-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams, J., E. Balas, and D. Zawack, "The Shifting Bottleneck Procedure for Job Shop Scheduling," Manage. Sci., 34, 391 (1988).
-
(1988)
Manage. Sci.
, vol.34
, pp. 391
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0000165767
-
An algorithm for solving the job-shop problem
-
Carlier, J., and E. Pinson, "An Algorithm for Solving the Job-Shop Problem," Manage. Sci., 35, 164 (1989).
-
(1989)
Manage. Sci.
, vol.35
, pp. 164
-
-
Carlier, J.1
Pinson, E.2
-
3
-
-
0004116989
-
-
MIT Press, Cambridge, MA
-
Cormen, T. H., C. E. Leiserson, and R. L. Rivest, Introduction to Algorithms, MIT Press, Cambridge, MA (1997).
-
(1997)
Introduction to Algorithms
-
-
Cormen, T.H.1
Leiserson, C.E.2
Rivest, R.L.3
-
4
-
-
0013057964
-
-
PhD Thesis, Purdue Univ., West Lafayette, IN
-
Elkamel, A., Scheduling of Process Operations Using Mathematical Programming Techniques, PhD Thesis, Purdue Univ., West Lafayette, IN (1993).
-
(1993)
Scheduling of Process Operations Using Mathematical Programming Techniques
-
-
Elkamel, A.1
-
5
-
-
0029712720
-
Sequencing intermediate products: A practical solution for multipurpose production scheduling
-
Graells, M., A. Espuña, and L. Puigjaner, "Sequencing Intermediate Products: A Practical Solution for Multipurpose Production Scheduling," Comput. Chem. Eng., 20S, S1137 (1996).
-
(1996)
Comput. Chem. Eng.
, vol.20 S
-
-
Graells, M.1
Espuña, A.2
Puigjaner, L.3
-
6
-
-
0000272397
-
General approach and tool for the scheduling of complex production systems
-
Graells, M., J. Cantón, B. Peschaud, and L. Puigjaner, "General Approach and Tool for the Scheduling of Complex Production Systems," Comput. Chem. Eng., 22S, S395 (1998).
-
(1998)
Comput. Chem. Eng.
, vol.22 S
-
-
Graells, M.1
Cantón, J.2
Peschaud, B.3
Puigjaner, L.4
-
7
-
-
21444436106
-
Automatic adjustment of crossover method in the scheduling using genetic algorithm
-
Hasebe, S., S. Taniguchi, and I. Hashimoto, "Automatic Adjustment of Crossover Method in the Scheduling Using Genetic Algorithm," Kagaku Kogaku Ronsbunshu, 22, 1039 (1996).
-
(1996)
Kagaku Kogaku Ronsbunshu
, vol.22
, pp. 1039
-
-
Hasebe, S.1
Taniguchi, S.2
Hashimoto, I.3
-
8
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations - 1. Mixed integer linear programming formulation
-
Kondili, E., C. C. Pantelides, and R. W. H. Sargent, "A General Algorithm for Short-Term Scheduling of Batch Operations - 1. Mixed Integer Linear Programming Formulation," Comput. Chem. Eng., 17, 211 (1993).
-
(1993)
Comput. Chem. Eng.
, vol.17
, pp. 211
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
9
-
-
0028501041
-
Heuristic algorithm for scheduling batch and semicontinuous plants with production deadlines, intermediate storage limitations and equipment changeover costs
-
Kudva, G., A. Elkamel, J. Pekny, and G. V. Reklaitis, "Heuristic Algorithm for Scheduling Batch and Semicontinuous Plants With Production Deadlines, Intermediate Storage Limitations and Equipment Changeover Costs," Comput. Chem. Eng. Symp. Ser., 18, 859 (1994).
-
(1994)
Comput. Chem. Eng. Symp. Ser.
, vol.18
, pp. 859
-
-
Kudva, G.1
Elkamel, A.2
Pekny, J.3
Reklaitis, G.V.4
-
10
-
-
0000907517
-
Application of repetitive SA method to scheduling problems of chemical processes
-
Murakami, Y., H. Uchiyama, S. Hasebe, and I. Hashimoto, "Application of Repetitive SA Method to Scheduling Problems of Chemical Processes," Comput. Chem. Eng., S21, S1087 (1997).
-
(1997)
Comput. Chem. Eng.
, vol.S21
-
-
Murakami, Y.1
Uchiyama, H.2
Hasebe, S.3
Hashimoto, I.4
-
11
-
-
0002238922
-
Towards the convergence of theory and practice: A technology guide for scheduling/planning methodology
-
J. F. Pekny and G. E. Blau, eds., American Institute of Chemical Engineers, New York
-
Pekny, J., and G. Reklaitis, "Towards the Convergence of Theory and Practice: A Technology Guide for Scheduling/Planning Methodology," Foundations of Computer-Aided Process Operations. AIChE Symp. Ser. No. 320, J. F. Pekny and G. E. Blau, eds., American Institute of Chemical Engineers, New York, p. 91 (1998).
-
(1998)
Foundations of Computer-Aided Process Operations. AIChE Symp. Ser. No. 320
, pp. 91
-
-
Pekny, J.1
Reklaitis, G.2
-
12
-
-
0001690679
-
A continuous time mixed integer linear programming model for short-term scheduling of multistage batch plants
-
Pinto, J. M., and I. E. Grossmann, "A Continuous Time Mixed Integer Linear Programming Model for Short-Term Scheduling of Multistage Batch Plants," Ind. Eng. Chem. Res., 34, 3037 (1995).
-
(1995)
Ind. Eng. Chem. Res.
, vol.34
, pp. 3037
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
13
-
-
0032386621
-
Assignment and sequencing models for the scheduling of process systems
-
Pinto, J. M., and I. E. Grossmann, "Assignment and Sequencing Models for the Scheduling of Process Systems," Ann. Operations Res., 81, 433 (1998).
-
(1998)
Ann. Operations Res.
, vol.81
, pp. 433
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
14
-
-
4244176917
-
Handling the increasing complexity of detailed batch process simulation and optimisation
-
Puigjaner, L., "Handling the Increasing Complexity of Detailed Batch Process Simulation and Optimisation," Comput. Chem. Eng. 23S (1354), S929 (1999).
-
(1999)
Comput. Chem. Eng.
, vol.23 S
, Issue.1354
-
-
Puigjaner, L.1
-
15
-
-
11544344503
-
Review of scheduling of process operations
-
New Orleans, LA
-
Reklaitis, G. V., "Review of Scheduling of Process Operations," AIChE Meeting, New Orleans, LA (1981).
-
(1981)
AIChE Meeting
-
-
Reklaitis, G.V.1
-
16
-
-
0009110452
-
Perspectives of scheduling and planning of process operations
-
Montebello, Canada
-
Reklaitis, G. V., "Perspectives of Scheduling and Planning of Process Operations," Proc. PSE'91 Conf., Montebello, Canada (1991).
-
(1991)
Proc. PSE'91 Conf.
-
-
Reklaitis, G.V.1
-
17
-
-
0026143149
-
Optimisation model for long-range planning in the chemical industry
-
Sahinidis, N. V., I. E. Grossmann, R. E. Fornari, and M. Chathrathi, "Optimisation Model for Long-Range Planning in the Chemical Industry," Comput. Chem. Eng., 15, 255 (1991).
-
(1991)
Comput. Chem. Eng.
, vol.15
, pp. 255
-
-
Sahinidis, N.V.1
Grossmann, I.E.2
Fornari, R.E.3
Chathrathi, M.4
-
18
-
-
0347487999
-
An MILP formulation for the production scheduling of multipurpose batch chemical plants
-
Fira de Barcelona, Barcelona, Spain
-
Sanmartí, E., A. Espuña, and L. Puigjaner, "An MILP Formulation for the Production Scheduling of Multipurpose Batch Chemical Plants," Proc. Mediterranean Congr. of Chemical Engineering, Fira de Barcelona, Barcelona, Spain (1996).
-
(1996)
Proc. Mediterranean Congr. of Chemical Engineering
-
-
Sanmartí, E.1
Espuña, A.2
Puigjaner, L.3
-
19
-
-
0002822277
-
Combinatorial technique for short term scheduling of multipurpose batch plants based on schedule-graph representation
-
Sanmartí, E., F. Friedler, and L Puigjaner, "Combinatorial Technique for Short Term Scheduling of Multipurpose Batch Plants Based on Schedule-Graph Representation," Comput. Chem. Eng., 22 (Suppl.), S847 (1998).
-
(1998)
Comput. Chem. Eng.
, vol.22
, Issue.SUPPL.
-
-
Sanmartí, E.1
Friedler, F.2
Puigjaner, L.3
-
20
-
-
0029717404
-
A simple continuous time process scheduling formulation and a novel solution algorithm
-
Schilling, G., and C. C. Pantelides, "A Simple Continuous Time Process Scheduling Formulation and a Novel Solution Algorithm," Comput. Chem. Eng., S20, S1221 (1996).
-
(1996)
Comput. Chem. Eng.
, vol.S20
-
-
Schilling, G.1
Pantelides, C.C.2
-
21
-
-
0027545175
-
A general algorithms for short-term scheduling of batch operations - 2. Computational issues
-
Shah, N., C. C. Pantelides, and R. W. H. Sargent, "A General Algorithms for Short-Term Scheduling of Batch Operations - 2. Computational Issues," Comput. Chem. Eng., 17, 229 (1993).
-
(1993)
Comput. Chem. Eng.
, vol.17
, pp. 229
-
-
Shah, N.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
22
-
-
0002822583
-
Single and multisite planning and scheduling: Current status and future challenges
-
J., F. Pekny and G. E. Blau, eds., American Institute of Chemical Engineers, New York
-
Shah, N., "Single and Multisite Planning and Scheduling: Current Status and Future Challenges," Foundations of Computer-Aided Process Operations. AIChE Symp. Ser. No. 320, J., F. Pekny and G. E. Blau, eds., American Institute of Chemical Engineers, New York, p. 75 (1998).
-
(1998)
Foundations of Computer-Aided Process Operations. AIChE Symp. Ser. No. 320
, pp. 75
-
-
Shah, N.1
-
23
-
-
0030189663
-
MILP model for scheduling and design of a special class of multipurpose batch plants
-
Voudouris, V. T., and I. E. Grossmann, "MILP Model for Scheduling and Design of a Special Class of Multipurpose Batch Plants," Comput. Chem. Eng., 20(11), 1335 (1994).
-
(1994)
Comput. Chem. Eng.
, vol.20
, Issue.11
, pp. 1335
-
-
Voudouris, V.T.1
Grossmann, I.E.2
-
24
-
-
0031351656
-
Scheduling of fast moving consumer goods plants
-
Yee, K. L., and N. Shah, "Scheduling of Fast Moving Consumer Goods Plants," J. Opt. Res. Soc., 48, 1201 (1997).
-
(1997)
J. Opt. Res. Soc.
, vol.48
, pp. 1201
-
-
Yee, K.L.1
Shah, N.2
-
25
-
-
0000965083
-
Improving the efficiency of discrete-time scheduling formulations
-
Yee, K. L., and N. Shah, "Improving the Efficiency of Discrete-Time Scheduling Formulations," Comput. Chem. Eng., S22, S403 (1998).
-
(1998)
Comput. Chem. Eng.
, vol.S22
-
-
Yee, K.L.1
Shah, N.2
-
26
-
-
0348118202
-
The optimal operation of mixed production facilities - Extensions and improvements
-
Zhang, X., and R. W. H. Sargent, "The Optimal Operation of Mixed Production Facilities - Extensions and Improvements," Comput. Chem. Eng., 520, 51287 (1996).
-
(1996)
Comput. Chem. Eng.
, vol.520
, pp. 51287
-
-
Zhang, X.1
Sargent, R.W.H.2
-
27
-
-
0000594166
-
The optimal operation of mixed production facilities - A general formulation and some approaches for the solution
-
Zhang, X., and R. W. H. Sargent, "The Optimal Operation of Mixed Production Facilities - A General Formulation and Some Approaches for the Solution," Proc. 5th Int. Symp. Process Systems Eng., 171 (1994).
-
(1994)
Proc. 5th Int. Symp. Process Systems Eng.
, pp. 171
-
-
Zhang, X.1
Sargent, R.W.H.2
|