메뉴 건너뛰기




Volumn 2, Issue 3, 2009, Pages 236-247

A new artificial immune system algorithm for multiobjective fuzzy flow shop

Author keywords

Engine cylinder liner manufacturing process; Fuzzy flow shop; Multi objective; New artificial immune system

Indexed keywords

ARTIFICIAL IMMUNE SYSTEM; ARTIFICIAL IMMUNE SYSTEM ALGORITHMS; COMPUTATIONAL RESULTS; DUE DATES; FLOW SHOP PROBLEMS; FLOW SHOP SCHEDULING PROBLEM; FLOW-SHOPS; FUZZY PROCESSING TIME; METAHEURISTIC; MODEL PROCESSING; MULTI OBJECTIVE; MUTATION OPERATORS; NEW ARTIFICIAL IMMUNE SYSTEM; NUMBER OF TARDY JOBS; REAL WORLD DATA;

EID: 77952907267     PISSN: 18756891     EISSN: 18756883     Source Type: Journal    
DOI: 10.1080/18756891.2009.9727656     Document Type: Article
Times cited : (28)

References (40)
  • 1
    • 31744439035 scopus 로고    scopus 로고
    • An ant colony optimization algorithms for minimizing the completion time variance of jobs in flow shops
    • Gajpal, Y., and Rajendran, C., 2006. An ant colony optimization algorithms for minimizing the completion time variance of jobs in flow shops. International journal of production economics, 101:259–272.
    • (2006) International journal of production economics , vol.101 , pp. 259-272
    • Gajpal, Y.1    Rajendran, C.2
  • 2
    • 34548536632 scopus 로고    scopus 로고
    • Preference ratio based maximum operator approximation and its application in fuzzy flow shop scheduling
    • Nezhad, S. S., and Assadi, R. G., 2008. Preference ratio based maximum operator approximation and its application in fuzzy flow shop scheduling. Applied Soft Computing, 8:759–766.
    • (2008) Applied Soft Computing , vol.8 , pp. 759-766
    • Nezhad, S.S.1    Assadi, R.G.2
  • 3
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job, m-machine sequencing problem
    • Campbell, H. G., Dudek, R. A., and Smith, M. L., 1970. A heuristic algorithm for the n-job, m-machine sequencing problem. Management science, 16:630–637.
    • (1970) Management science , vol.16 , pp. 630-637
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 4
    • 34548074238 scopus 로고    scopus 로고
    • Scheduling a fuzzy flowshop problem with flexible due dates using ant colony optimization
    • Kiliç, S., 2007. Scheduling a fuzzy flowshop problem with flexible due dates using ant colony optimization. Applications of Evolutionary Computing, 4448:742–751.
    • (2007) Applications of Evolutionary Computing , vol.4448 , pp. 742-751
    • Kiliç, S.1
  • 5
    • 33749508693 scopus 로고    scopus 로고
    • A new approach to two machine flow shop problem with uncertain processing times
    • Petrovic, S., and Song, X., 2006. A new approach to two machine flow shop problem with uncertain processing times. Optimization and Engineering, 7 (3):329–342.
    • (2006) Optimization and Engineering , vol.7 , Issue.3 , pp. 329-342
    • Petrovic, S.1    Song, X.2
  • 6
    • 0002165245 scopus 로고
    • Job sequencing with fuzzy processing times
    • McCahon, S., and Lee, E. S., 1990. Job sequencing with fuzzy processing times. Comput Math Appl, 19 (7):31–41.
    • (1990) Comput Math Appl , vol.19 , Issue.7 , pp. 31-41
    • McCahon, S.1    Lee, E.S.2
  • 8
    • 33749556766 scopus 로고    scopus 로고
    • An improved genetic-based particle swarm optimization for no idle permutation flow shops with fuzzy processing time
    • Niu, O. X., and Gu, S., 2006. An improved genetic-based particle swarm optimization for no idle permutation flow shops with fuzzy processing time. PRICAI, Lecture Notes in Artificial Intelligence, 4099:757–766.
    • (2006) PRICAI, Lecture Notes in Artificial Intelligence , vol.4099 , pp. 757-766
    • Niu, O.X.1    Gu, S.2
  • 10
    • 85024189192 scopus 로고    scopus 로고
    • Proceedings of the 11th International Conference on Information Processing and Management of Uncertainty in Knowledge-based Systems (IPMU), Paris, France. : July
    • Song, X., and Petrovic, S., 2006. A fuzzy approach to capacitated flow shop scheduling. Proceedings of the 11th International Conference on Information Processing and Management of Uncertainty in Knowledge-based Systems (IPMU). July2–72006, Paris, France. pp. 486–493.
    • (2006) A fuzzy approach to capacitated flow shop scheduling , pp. 486-493
    • Song, X.1    Petrovic, S.2
  • 11
    • 3142709422 scopus 로고    scopus 로고
    • Fuzzy branch and bound algorithm for flow shop scheduling
    • Temiz, I., and Erol, S., 2004. Fuzzy branch and bound algorithm for flow shop scheduling. Journal of Intelligent Manufacturing, 15:449–454.
    • (2004) Journal of Intelligent Manufacturing , vol.15 , pp. 449-454
    • Temiz, I.1    Erol, S.2
  • 12
    • 0000177367 scopus 로고
    • Application of the branch and bound technique to some flow shop scheduling problems
    • Ignall, E., and Schrange, L., 1965. Application of the branch and bound technique to some flow shop scheduling problems. Operations research, 13:400–412.
    • (1965) Operations research , vol.13 , pp. 400-412
    • Ignall, E.1    Schrange, L.2
  • 13
    • 0036498313 scopus 로고    scopus 로고
    • Constructing a fuzzy flow shop sequencing model based on statistical data
    • Yao, J. S., and Lin, F. T., 2002. Constructing a fuzzy flow shop sequencing model based on statistical data. International Journal of Approximate Reasoning, 29:215–234.
    • (2002) International Journal of Approximate Reasoning , vol.29 , pp. 215-234
    • Yao, J.S.1    Lin, F.T.2
  • 15
    • 58049149234 scopus 로고    scopus 로고
    • A new approach to solve flow shop scheduling problems by artificial immune systems
    • Engin, O., and Döyen, A., 2007. A new approach to solve flow shop scheduling problems by artificial immune systems. Journal of the Doğuş University, 8 (1):12–27.
    • (2007) Journal of the Doğuş University , vol.8 , Issue.1 , pp. 12-27
    • Engin, O.1    Döyen, A.2
  • 17
    • 33745598869 scopus 로고    scopus 로고
    • Solving job shop scheduling problems by a novel artificial immune system
    • Ge, H. W., Sun, L., and Liang, Y. C., 2005. Solving job shop scheduling problems by a novel artificial immune system. Lecture Notes in Artificial Intelligence, 3809:839–842.
    • (2005) Lecture Notes in Artificial Intelligence , vol.3809 , pp. 839-842
    • Ge, H.W.1    Sun, L.2    Liang, Y.C.3
  • 19
    • 3142755746 scopus 로고    scopus 로고
    • A new approach to solve hybrid flow shop scheduling problems by artificial immune system
    • Engin, O., and Döyen, A., 2004. A new approach to solve hybrid flow shop scheduling problems by artificial immune system. Future Generation Computer Systems, 20 (6):1083–1095.
    • (2004) Future Generation Computer Systems , vol.20 , Issue.6 , pp. 1083-1095
    • Engin, O.1    Döyen, A.2
  • 20
    • 32044438244 scopus 로고    scopus 로고
    • Multiprocessor scheduling and rescheduling with use of cellular automata and artificial immune system support
    • Swiecicka, A., Seredynski, F., and Zomaya, A. Y., 2006. Multiprocessor scheduling and rescheduling with use of cellular automata and artificial immune system support. IEEE Transactions on Parallel and Distributed Systems, 17 (3):253–263.
    • (2006) IEEE Transactions on Parallel and Distributed Systems , vol.17 , Issue.3 , pp. 253-263
    • Swiecicka, A.1    Seredynski, F.2    Zomaya, A.Y.3
  • 21
    • 33745791129 scopus 로고    scopus 로고
    • Artificial immune systems applied to multiprocessor scheduling, Parallel processing and applied mathematics
    • Wojtyla, G., Rzadca, K., and Seredynski, F., 2006. Artificial immune systems applied to multiprocessor scheduling, Parallel processing and applied mathematics. Lecture Notes in Computer Science, 3911:904–911.
    • (2006) Lecture Notes in Computer Science , vol.3911 , pp. 904-911
    • Wojtyla, G.1    Rzadca, K.2    Seredynski, F.3
  • 28
    • 0029224965 scopus 로고
    • Genetic algorithm for flow shop sequencing
    • Reeves, C. R., 1995. Genetic algorithm for flow shop sequencing. Computers and Operations Research, 15:5–23.
    • (1995) Computers and Operations Research , vol.15 , pp. 5-23
    • Reeves, C.R.1
  • 29
    • 0036722525 scopus 로고    scopus 로고
    • An application of genetic algorithms to lot-streaming flow shop scheduling
    • Yoon, S. H., and Ventura, J. A., 2002. An application of genetic algorithms to lot-streaming flow shop scheduling. IIE Transactions, 34:779–787.
    • (2002) IIE Transactions , vol.34 , pp. 779-787
    • Yoon, S.H.1    Ventura, J.A.2
  • 30
    • 29344433807 scopus 로고    scopus 로고
    • A multiobjective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs
    • Pasupathy, T., Rajendran, C., and Suresh, R. K., 2006. A multiobjective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs. Int J Adv. Manuf Technol, 27:804–815.
    • (2006) Int J Adv. Manuf Technol , vol.27 , pp. 804-815
    • Pasupathy, T.1    Rajendran, C.2    Suresh, R.K.3
  • 31
    • 33847658312 scopus 로고    scopus 로고
    • Sub-population genetic algorithm with mining gene structures for multiobjective flowshop scheduling problems
    • Chang, P. C., Chen, S. H., and Liu, C. H., 2007. Sub-population genetic algorithm with mining gene structures for multiobjective flowshop scheduling problems. Expert systems with applications, 33:762–771.
    • (2007) Expert systems with applications , vol.33 , pp. 762-771
    • Chang, P.C.1    Chen, S.H.2    Liu, C.H.3
  • 32
    • 0037410247 scopus 로고    scopus 로고
    • A fuzzy genetic algorithm for driver scheduling
    • Li, J., and Kwan, R. S. K., 2003. A fuzzy genetic algorithm for driver scheduling. European Journal of Operational Research, 147 (2):334–344.
    • (2003) European Journal of Operational Research , vol.147 , Issue.2 , pp. 334-344
    • Li, J.1    Kwan, R.S.K.2
  • 33
    • 56749107636 scopus 로고    scopus 로고
    • A conceptual fuzzy-genetic algorithm framework for assessing the potential risks in supply chain management
    • Tang, C. X. H., Lau, H. C. W., and Ho, G. T. S., 2008. A conceptual fuzzy-genetic algorithm framework for assessing the potential risks in supply chain management. International Journal of Risk Assessment and Management, 10 (3):263–271.
    • (2008) International Journal of Risk Assessment and Management , vol.10 , Issue.3 , pp. 263-271
    • Tang, C.X.H.1    Lau, H.C.W.2    Ho, G.T.S.3
  • 36
    • 26944476629 scopus 로고    scopus 로고
    • Proceedings of the 18th international conference on Innovations in Applied Artificial Intelligence, Bari, Italy.
    • Fayad, C., and Petrovic, S., 2005. A fuzzy genetic algorithm for realworld job shop scheduling. Proceedings of the 18th international conference on Innovations in Applied Artificial Intelligence. 2005, Bari, Italy. pp. 524–533.
    • (2005) A fuzzy genetic algorithm for realworld job shop scheduling , pp. 524-533
    • Fayad, C.1    Petrovic, S.2
  • 38
    • 0033881797 scopus 로고    scopus 로고
    • Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
    • Sakawa, M., and Kubota, R., 2000. Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research, 120:393–407.
    • (2000) European Journal of Operational Research , vol.120 , pp. 393-407
    • Sakawa, M.1    Kubota, R.2
  • 40
    • 0030241820 scopus 로고    scopus 로고
    • Multi objective genetic algorithm and its applications to flowshop scheduling
    • Murata, T., Ishibuchi, H., and Tanaka, H., 1996. Multi objective genetic algorithm and its applications to flowshop scheduling. Computers Industrial Engineering, 30 (4):957–968.
    • (1996) Computers Industrial Engineering , vol.30 , Issue.4 , pp. 957-968
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.