-
2
-
-
0004113622
-
-
Addison-Wesley, Reading MA
-
Conway, R.W., Maxwell, W.L., Miller, L.W., 1967. Theory of scheduling. Addison-Wesley, Reading, MA.
-
(1967)
Theory of scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
4
-
-
0028546121
-
One machine scheduling problem with fuzzy due dates
-
Han, S., Ishii, H., Fujii, S., 1994. One machine scheduling problem with fuzzy due dates. European Journal of Operational Research 49, 1-12.
-
(1994)
European Journal of Operational Research
, vol.49
, pp. 1-12
-
-
Han, S.1
Ishii, H.2
Fujii, S.3
-
5
-
-
0028523480
-
Genetic algorithms and neighborhood search algorithm for fuzzy flowshop scheduling problem
-
Ishibuchi, H., Yamamoto, N., Murata, T., Tanaka, H., 1994. Genetic algorithms and neighborhood search algorithm for fuzzy flowshop scheduling problem. Fuzzy Sets and Systems 67, 81-100.
-
(1994)
Fuzzy Sets and Systems
, vol.67
, pp. 81-100
-
-
Ishibuchi, H.1
Yamamoto, N.2
Murata, T.3
Tanaka, H.4
-
6
-
-
0030409833
-
-
Proceedings of the 5th IEEE International Conference on Fuzzy Systems
-
Ishibuchi, H., Murata, T., Lee, K.-H., 1996. Formulation of fuzzy flowshop scheduling problems with fuzzy processing time. In: Proceedings of the 5th IEEE International Conference on Fuzzy Systems, pp. 199-205.
-
(1996)
Formulation of fuzzy flowshop scheduling problems with fuzzy processing time
, pp. 199-205
-
-
Ishibuchi, H.1
Murata, T.2
Lee, K.-H.3
-
7
-
-
0000996580
-
Two scheduling problems with fuzzy duedates
-
Ishii, H., Tada, M., Masuda, T., 1992. Two scheduling problems with fuzzy duedates. Fuzzy Sets and Systems 46, 339-347.
-
(1992)
Fuzzy Sets and Systems
, vol.46
, pp. 339-347
-
-
Ishii, H.1
Tada, M.2
Masuda, T.3
-
8
-
-
0029638856
-
Single machine scheduling problem with fuzzy precedence relation
-
Ishii, H., Tada, M., 1995. Single machine scheduling problem with fuzzy precedence relation. European Journal of Operational Research 87, 284-288.
-
(1995)
European Journal of Operational Research
, vol.87
, pp. 284-288
-
-
Ishii, H.1
Tada, M.2
-
10
-
-
84873002204
-
Single-machine scheduling with fuzzy precedence constraints
-
Research Report, Japan Advanced Institute of Science and Technology
-
Levner E. Vlach M. Single-machine scheduling with fuzzy precedence constraints. Research Report, School of Information Science, Japan Advanced Institute of Science and Technology, 1997.
-
(1997)
School of Information Science
-
-
Levner, E.1
Vlach, M.2
-
11
-
-
0000062028
-
An n job, one machine sequencing algorithm for minimizing the number of late jobs
-
Moore, J.M., 1968. An n job, one machine sequencing algorithm for minimizing the number of late jobs. Management Science 15, 102-109.
-
(1968)
Management Science
, vol.15
, pp. 102-109
-
-
Moore, J.M.1
-
12
-
-
0009420085
-
-
Proceedings of the VII International Fuzzy Systems Association World Congress, IFSA 1997
-
Tanaka, K., Vlach, M., 1997. Single machine scheduling with fuzzy due dates. In: Proceedings of the VII International Fuzzy Systems Association World Congress, IFSA 1997, vol. 1, pp. 30-35.
-
(1997)
Single machine scheduling with fuzzy due dates
, vol.1
, pp. 30-35
-
-
Tanaka, K.1
Vlach, M.2
-
13
-
-
0007915507
-
Solving job-shop scheduling problem with fuzzy processing time using genetic algorithm
-
Tsujimura, Y., Gen, M., Kubota, E., 1995. Solving job-shop scheduling problem with fuzzy processing time using genetic algorithm. Journal of Japan Society for Fuzzy Theory and Systems 7, 1073-1083.
-
(1995)
Journal of Japan Society for Fuzzy Theory and Systems
, vol.7
, pp. 1073-1083
-
-
Tsujimura, Y.1
Gen, M.2
Kubota, E.3
|