메뉴 건너뛰기




Volumn 6, Issue 6, 1999, Pages 639-647

Fuzzy due-date scheduling problem with fuzzy processing time

Author keywords

Fuzzy due date; Fuzzy processing time; Fuzzy sets; One machine scheduling; Possibility measure

Indexed keywords


EID: 0141637075     PISSN: 09696016     EISSN: 14753995     Source Type: Journal    
DOI: 10.1111/j.1475-3995.1999.tb00178.x     Document Type: Article
Times cited : (48)

References (13)
  • 5
    • 0028523480 scopus 로고
    • Genetic algorithms and neighborhood search algorithm for fuzzy flowshop scheduling problem
    • Ishibuchi, H., Yamamoto, N., Murata, T., Tanaka, H., 1994. Genetic algorithms and neighborhood search algorithm for fuzzy flowshop scheduling problem. Fuzzy Sets and Systems 67, 81-100.
    • (1994) Fuzzy Sets and Systems , vol.67 , pp. 81-100
    • Ishibuchi, H.1    Yamamoto, N.2    Murata, T.3    Tanaka, H.4
  • 7
    • 0000996580 scopus 로고
    • Two scheduling problems with fuzzy duedates
    • Ishii, H., Tada, M., Masuda, T., 1992. Two scheduling problems with fuzzy duedates. Fuzzy Sets and Systems 46, 339-347.
    • (1992) Fuzzy Sets and Systems , vol.46 , pp. 339-347
    • Ishii, H.1    Tada, M.2    Masuda, T.3
  • 8
    • 0029638856 scopus 로고
    • Single machine scheduling problem with fuzzy precedence relation
    • Ishii, H., Tada, M., 1995. Single machine scheduling problem with fuzzy precedence relation. European Journal of Operational Research 87, 284-288.
    • (1995) European Journal of Operational Research , vol.87 , pp. 284-288
    • Ishii, H.1    Tada, M.2
  • 10
    • 84873002204 scopus 로고    scopus 로고
    • Single-machine scheduling with fuzzy precedence constraints
    • Research Report, Japan Advanced Institute of Science and Technology
    • Levner E. Vlach M. Single-machine scheduling with fuzzy precedence constraints. Research Report, School of Information Science, Japan Advanced Institute of Science and Technology, 1997.
    • (1997) School of Information Science
    • Levner, E.1    Vlach, M.2
  • 11
    • 0000062028 scopus 로고
    • An n job, one machine sequencing algorithm for minimizing the number of late jobs
    • Moore, J.M., 1968. An n job, one machine sequencing algorithm for minimizing the number of late jobs. Management Science 15, 102-109.
    • (1968) Management Science , vol.15 , pp. 102-109
    • Moore, J.M.1
  • 12
    • 0009420085 scopus 로고    scopus 로고
    • Proceedings of the VII International Fuzzy Systems Association World Congress, IFSA 1997
    • Tanaka, K., Vlach, M., 1997. Single machine scheduling with fuzzy due dates. In: Proceedings of the VII International Fuzzy Systems Association World Congress, IFSA 1997, vol. 1, pp. 30-35.
    • (1997) Single machine scheduling with fuzzy due dates , vol.1 , pp. 30-35
    • Tanaka, K.1    Vlach, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.