Flow-shop/no-idle or no-wait scheduling to minimise the sum of completion times
-
Adiri, I., & Pohoryles, D. Flow-shop/no-idle or no-wait scheduling to minimise the sum of completion times. Naval Research Quarterly, 29(1982) 495-504.
-
(1982)
Naval Research Quarterly
, vol.29
, pp. 495-504
-
-
Adiri, I.1
Pohoryles, D.2
-
2
-
-
0016952078
-
The complexity of flow-shop and job-shop scheduling
-
Garey, M. R., Johnson, D. S., & Sethi, R. The complexity of flow-shop and job-shop scheduling. Mathematics of Operational Research, 1(1976) 117-129.
-
(1976)
Mathematics of Operational Research
, vol.1
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
Sethi, R.3
-
5
-
-
0012749887
-
NP-hardness of compact scheduling in simplified open and flow shops
-
Giaro, K. NP-hardness of compact scheduling in simplified open and flow shops. European Journal of Operational Research, 130 (2001) 90-98.
-
(2001)
European Journal of Operational Research
, vol.130
, pp. 90-98
-
-
Giaro, K.1
-
6
-
-
84985846638
-
A comparison of sequencing rules for a two-stage hybrid flow-shop
-
Narasimhan, S. L., & Mangiameli, P. M. A comparison of sequencing rules for a two-stage hybrid flow-shop. DecisionSciences, 18 (1987) 250-265.
-
(1987)
DecisionSciences
, vol.18
, pp. 250-265
-
-
Narasimhan, S.L.1
Mangiameli, P.M.2
-
7
-
-
0001497209
-
Using fuzzy set theory in a scheduling problem: A case study
-
Prade H.: Using fuzzy set theory in a scheduling problem: a case study. Fuzzy Sets and Systems. 2 (1979) 153-165.
-
(1979)
Fuzzy Sets and Systems
, vol.2
, pp. 153-165
-
-
Prade, H.1
-
9
-
-
0031268178
-
Jobshop scheduling with imprecise durations: A fuzzy approach
-
Fortemps P.: Jobshop scheduling with imprecise durations: a fuzzy approach. IEEE Trans. Fuzzy Syst. 5 (1997) 557-569.
-
(1997)
IEEE Trans. Fuzzy Syst.
, vol.5
, pp. 557-569
-
-
Fortemps, P.1
-
11
-
-
0035369592
-
Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
-
Chanas S., Kasperski A.: Minimizing Maximum Lateness in a Single Machine Scheduling Problem with Fuzzy Processing times and Fuzzy Due Dates. Engineering Applications of Artificial Intelligence. 14 (2001) 377-386.
-
(2001)
Engineering Applications of Artificial Intelligence
, vol.14
, pp. 377-386
-
-
Chanas, S.1
Kasperski, A.2
-
12
-
-
0035215629
-
Real-time task scheduling with fuzzy deadlines and processing times
-
Litoiu M., Tadei R.: Real-time task scheduling with fuzzy deadlines and processing times. Fuzzy Sets and Systems. 117 (2001) 35-45.
-
(2001)
Fuzzy Sets and Systems
, vol.117
, pp. 35-45
-
-
Litoiu, M.1
Tadei, R.2
-
13
-
-
0034317976
-
Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains
-
Hong Tzungpei, Wang Tzutin.: Fuzzy flexible flow shops at two machine centers for continuous fuzzy domains. Information Sciences. 129 (2000) 227-237
-
(2000)
Information Sciences
, vol.129
, pp. 227-237
-
-
Hong, T.1
Wang, T.2
-
15
-
-
0019585325
-
A procedure for ordering fuzzy subsets of the unit interval
-
Yager, R.R. A procedure for ordering fuzzy subsets of the unit interval, Information Sciences 24 (1981) 143-161.
-
(1981)
Information Sciences
, vol.24
, pp. 143-161
-
-
Yager, R.R.1
-
16
-
-
0020813415
-
Ranking fuzzy numbers in the setting of possibility theory
-
Dubois, D. and Prade, H. Ranking fuzzy numbers in the setting of possibility theory, Information Sciences 30 (1983) 183-224.
-
(1983)
Information Sciences
, vol.30
, pp. 183-224
-
-
Dubois, D.1
Prade, H.2
-
17
-
-
2442429010
-
Ranking fuzzy numbers with maximizing set and minimizing set
-
Chen, S.H. Ranking fuzzy numbers with maximizing set and minimizing set, Fuzzy Sets and Systems 17 (1985) 113-129.
-
(1985)
Fuzzy Sets and Systems
, vol.17
, pp. 113-129
-
-
Chen, S.H.1
-
18
-
-
0001130859
-
Comparison of fuzzy numbers based on the probability measure of fuzzy events
-
Lee E.S., Li R.J.: Comparison of fuzzy numbers based on the probability measure of fuzzy events. Computers & Mathematics with Applications. 15 (1988) 887-896.
-
(1988)
Computers & Mathematics with Applications
, vol.15
, pp. 887-896
-
-
Lee, E.S.1
Li, R.J.2
-
19
-
-
0001130859
-
Comparison of fuzzy numbers based on the probability measure of fuzzy events
-
Lee E.S., Li R.J.: Comparison of fuzzy numbers based on the probability measure of fuzzy events. Computers & Mathematics with Applications. 15 (1988) 887-896.
-
(1988)
Computers & Mathematics with Applications
, vol.15
, pp. 887-896
-
-
Lee, E.S.1
Li, R.J.2
-
22
-
-
84942162725
-
Strategies for finding good local guides in multi-objective particle swarm optimization (MOPSO)
-
Mostaghim S., Teich J.: Strategies for finding good local guides in multi-objective particle swarm optimization (MOPSO). In Proc. IEEE 2003 Swarm Intelligence Symp. (2002) 26-33.
-
(2002)
Proc. IEEE 2003 Swarm Intelligence Symp.
, pp. 26-33
-
-
Mostaghim, S.1
Teich, J.2
-
23
-
-
26844447786
-
Discrete particle swarm optimization, illustrated by the Traveling Salesman Problem
-
Springer, Heidelberg Germany
-
Clerc M.: Discrete particle swarm optimization, illustrated by the Traveling Salesman Problem. New Optimization Techniques in Engineering. Springer, Heidelberg Germany, pp. (2004) 219-239.
-
(2004)
New Optimization Techniques in Engineering
, pp. 219-239
-
-
Clerc, M.1
-
24
-
-
15844383855
-
A bi-criteria optimization: Minimizing the integral value and spread of the fuzzy makespan of job shop scheduling problems
-
Omar A. G.: A bi-criteria optimization: minimizing the integral value and spread of the fuzzy makespan of job shop scheduling problems. Applied Soft Computing. (2003) 197-210.
-
(2003)
Applied Soft Computing
, pp. 197-210
-
-
Omar, A.G.1
|